New projects and RERA data in Pune district, Maharashtra

14005 projects are registered in Pune district: 659,896 units across them, 1152 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

14005Projects covered
1152Registered, last 12 months
659,896Units declared
338,554Units not yet booked
3961Completion dates revised
711With declared litigation

Of the 14005 covered registrations, 3961 have revised their promised completion date and 711 declare litigation. The median project here is 29% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Free · a new edition every month

Pune monthly RERA report

What registered month by month, this city against its own twelve-month run and against the other six, with the possession pipeline, the taluka split and the busiest pincodes. Built from the same filings as this page.

October 2026: 170 new registrations, 11,625 homes and units, 13 complaints filed.

When Pune projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 14,001 projects with a promised date, 5,167 are recorded delivered, 5,214 are still on the register and 3,620 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

05001,0001,5002,000today2017: 153 projects, delivered2017: 21 projects, registration lapsed or cancelled’172018: 726 projects, delivered2018: 73 projects, registration lapsed or cancelled’182019: 707 projects, delivered2019: 171 projects, registration lapsed or cancelled’192020: 290 projects, delivered2020: 155 projects, registration lapsed or cancelled’202021: 455 projects, delivered2021: 276 projects, registration lapsed or cancelled’212022: 665 projects, delivered2022: 464 projects, registration lapsed or cancelled’222023: 667 projects, delivered2023: 583 projects, registration lapsed or cancelled’232024: 635 projects, delivered2024: 685 projects, registration lapsed or cancelled’242025: 500 projects, delivered2025: 791 projects, registration lapsed or cancelled’252026: 290 projects, delivered2026: 1,044 projects, on the register2026: 380 projects, registration lapsed or cancelled’262027: 54 projects, delivered2027: 1,500 projects, on the register2027: 13 projects, registration lapsed or cancelled’272028: 21 projects, delivered2028: 1,161 projects, on the register2028: 7 projects, registration lapsed or cancelled’282029: 2 projects, delivered2029: 719 projects, on the register’292030: 1 projects, delivered2030: 450 projects, on the register2030: 1 projects, registration lapsed or cancelled’302031: 1 projects, delivered2031: 235 projects, on the register’312032: 66 projects, on the register’322033: 19 projects, on the register’332034: 9 projects, on the register’342035: 7 projects, on the register’35

5,980 projects promise possession in 2026 or later. Years outside 2017 to 2035 hold 4 further projects and are not shown. Facts as per filings on RERA website.

050k100k150k200ktoday2017: 64 flats, delivered (only 2 of 174 projects filed a flat count)2017: 14 flats, registration lapsed or cancelled (only 2 of 174 projects filed a flat count)’172018: 373 flats, delivered (only 12 of 799 projects filed a flat count)2018: 198 flats, registration lapsed or cancelled (only 12 of 799 projects filed a flat count)’182019: 917 flats, delivered (only 21 of 878 projects filed a flat count)2019: 140 flats, registration lapsed or cancelled (only 21 of 878 projects filed a flat count)’192020: 282 flats, delivered (only 17 of 445 projects filed a flat count)2020: 895 flats, registration lapsed or cancelled (only 17 of 445 projects filed a flat count)’202021: 3,321 flats, delivered (only 24 of 731 projects filed a flat count)2021: 341 flats, registration lapsed or cancelled (only 24 of 731 projects filed a flat count)’212022: 1,825 flats, delivered (only 59 of 1,129 projects filed a flat count)2022: 2,311 flats, registration lapsed or cancelled (only 59 of 1,129 projects filed a flat count)’222023: 1,700 flats, delivered (only 86 of 1,250 projects filed a flat count)2023: 2,425 flats, registration lapsed or cancelled (only 86 of 1,250 projects filed a flat count)’232024: 4,214 flats, delivered (only 123 of 1,320 projects filed a flat count)2024: 3,694 flats, registration lapsed or cancelled (only 123 of 1,320 projects filed a flat count)’242025: 17,963 flats, delivered (only 478 of 1,291 projects filed a flat count)2025: 24,206 flats, registration lapsed or cancelled (only 478 of 1,291 projects filed a flat count)’252026: 17,178 flats, delivered2026: 89,808 flats, on the register2026: 24,805 flats, registration lapsed or cancelled’262027: 3,933 flats, delivered2027: 136,907 flats, on the register2027: 118 flats, registration lapsed or cancelled’272028: 391 flats, delivered2028: 107,789 flats, on the register2028: 12 flats, registration lapsed or cancelled’282029: 79,047 flats, on the register’292030: 158 flats, delivered2030: 65,184 flats, on the register’302031: 204 flats, delivered2031: 42,670 flats, on the register’312032: 19,662 flats, on the register’322033: 3,055 flats, on the register’332034: 2,339 flats, on the register’342035: 1,679 flats, on the register’35

594,939 flats are promised in 2026 or later, across the 86% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Years outside 2017 to 2035 hold 4 further projects and are not shown. Facts as per filings on RERA website.

How far Pune possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 3,946 of 14,002 projects (28%) have moved at least once; the median move is 18 months and the longest is 144 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

05001,0001,5002,000Originally due 2017: 174 projects kept the original date, 74% of the yearOriginally due 2017: 48 projects moved by under 2 years, 21% of the yearOriginally due 2017: 12 projects moved by 2 years or more, 5% of the year’17Originally due 2018: 721 projects kept the original date, 63% of the yearOriginally due 2018: 266 projects moved by under 2 years, 23% of the yearOriginally due 2018: 159 projects moved by 2 years or more, 14% of the year’18Originally due 2019: 654 projects kept the original date, 55% of the yearOriginally due 2019: 195 projects moved by under 2 years, 16% of the yearOriginally due 2019: 334 projects moved by 2 years or more, 28% of the year’19Originally due 2020: 237 projects kept the original date, 58% of the yearOriginally due 2020: 64 projects moved by under 2 years, 16% of the yearOriginally due 2020: 110 projects moved by 2 years or more, 27% of the year’20Originally due 2021: 530 projects kept the original date, 66% of the yearOriginally due 2021: 131 projects moved by under 2 years, 16% of the yearOriginally due 2021: 144 projects moved by 2 years or more, 18% of the year’21Originally due 2022: 833 projects kept the original date, 73% of the yearOriginally due 2022: 134 projects moved by under 2 years, 12% of the yearOriginally due 2022: 169 projects moved by 2 years or more, 15% of the year’22Originally due 2023: 985 projects kept the original date, 74% of the yearOriginally due 2023: 169 projects moved by under 2 years, 13% of the yearOriginally due 2023: 180 projects moved by 2 years or more, 13% of the year’23Originally due 2024: 1,006 projects kept the original date, 68% of the yearOriginally due 2024: 259 projects moved by under 2 years, 17% of the yearOriginally due 2024: 224 projects moved by 2 years or more, 15% of the year’24Originally due 2025: 903 projects kept the original date, 61% of the yearOriginally due 2025: 436 projects moved by under 2 years, 30% of the yearOriginally due 2025: 138 projects moved by 2 years or more, 9% of the year’25Originally due 2026: 957 projects kept the original date, 75% of the yearOriginally due 2026: 261 projects moved by under 2 years, 21% of the yearOriginally due 2026: 54 projects moved by 2 years or more, 4% of the year’26Originally due 2027: 1,011 projects kept the original date, 88% of the yearOriginally due 2027: 125 projects moved by under 2 years, 11% of the yearOriginally due 2027: 8 projects moved by 2 years or more, 1% of the year’27Originally due 2028: 881 projects kept the original date, 86% of the yearOriginally due 2028: 139 projects moved by under 2 years, 14% of the yearOriginally due 2028: 8 projects moved by 2 years or more, 1% of the year’28Originally due 2029: 568 projects kept the original date, 87% of the yearOriginally due 2029: 81 projects moved by under 2 years, 12% of the yearOriginally due 2029: 3 projects moved by 2 years or more, 0% of the year’29Originally due 2030: 347 projects kept the original date, 85% of the yearOriginally due 2030: 60 projects moved by under 2 years, 15% of the year’30Originally due 2031: 170 projects kept the original date, 88% of the yearOriginally due 2031: 24 projects moved by under 2 years, 12% of the year’31Originally due 2032: 51 projects kept the original date, 88% of the yearOriginally due 2032: 7 projects moved by under 2 years, 12% of the year’32Originally due 2033: 12 projects kept the original date, 92% of the yearOriginally due 2033: 1 projects moved by under 2 years, 8% of the year’33Originally due 2034: 7 projects kept the original date, 78% of the yearOriginally due 2034: 2 projects moved by under 2 years, 22% of the year’34Originally due 2035: 5 projects kept the original date, 83% of the yearOriginally due 2035: 1 projects moved by under 2 years, 17% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

050k100k150k200kOriginally due 2017: 78 flats kept the original date, 74% of the year (only 3 of 234 projects filed a flat count)Originally due 2017: 396 flats moved by 2 years or more, 5% of the year (only 3 of 234 projects filed a flat count)’17Originally due 2018: 571 flats kept the original date, 63% of the year (only 29 of 1,146 projects filed a flat count)Originally due 2018: 462 flats moved by under 2 years, 23% of the year (only 29 of 1,146 projects filed a flat count)Originally due 2018: 994 flats moved by 2 years or more, 14% of the year (only 29 of 1,146 projects filed a flat count)’18Originally due 2019: 707 flats kept the original date, 55% of the year (only 80 of 1,183 projects filed a flat count)Originally due 2019: 622 flats moved by under 2 years, 16% of the year (only 80 of 1,183 projects filed a flat count)Originally due 2019: 6,120 flats moved by 2 years or more, 28% of the year (only 80 of 1,183 projects filed a flat count)’19Originally due 2020: 443 flats kept the original date, 58% of the year (only 39 of 411 projects filed a flat count)Originally due 2020: 63 flats moved by under 2 years, 16% of the year (only 39 of 411 projects filed a flat count)Originally due 2020: 2,323 flats moved by 2 years or more, 27% of the year (only 39 of 411 projects filed a flat count)’20Originally due 2021: 3,616 flats kept the original date, 66% of the year (only 84 of 805 projects filed a flat count)Originally due 2021: 615 flats moved by under 2 years, 16% of the year (only 84 of 805 projects filed a flat count)Originally due 2021: 4,805 flats moved by 2 years or more, 18% of the year (only 84 of 805 projects filed a flat count)’21Originally due 2022: 2,455 flats kept the original date, 73% of the year (only 151 of 1,136 projects filed a flat count)Originally due 2022: 438 flats moved by under 2 years, 12% of the year (only 151 of 1,136 projects filed a flat count)Originally due 2022: 10,795 flats moved by 2 years or more, 15% of the year (only 151 of 1,136 projects filed a flat count)’22Originally due 2023: 3,225 flats kept the original date, 74% of the year (only 242 of 1,334 projects filed a flat count)Originally due 2023: 1,608 flats moved by under 2 years, 13% of the year (only 242 of 1,334 projects filed a flat count)Originally due 2023: 14,086 flats moved by 2 years or more, 13% of the year (only 242 of 1,334 projects filed a flat count)’23Originally due 2024: 6,142 flats kept the original date, 68% of the year (only 417 of 1,489 projects filed a flat count)Originally due 2024: 10,257 flats moved by under 2 years, 17% of the year (only 417 of 1,489 projects filed a flat count)Originally due 2024: 21,249 flats moved by 2 years or more, 15% of the year (only 417 of 1,489 projects filed a flat count)’24Originally due 2025: 24,718 flats kept the original date, 61% of the yearOriginally due 2025: 45,648 flats moved by under 2 years, 30% of the yearOriginally due 2025: 12,439 flats moved by 2 years or more, 9% of the year’25Originally due 2026: 64,121 flats kept the original date, 75% of the yearOriginally due 2026: 28,612 flats moved by under 2 years, 21% of the yearOriginally due 2026: 8,892 flats moved by 2 years or more, 4% of the year’26Originally due 2027: 83,490 flats kept the original date, 88% of the yearOriginally due 2027: 14,318 flats moved by under 2 years, 11% of the yearOriginally due 2027: 859 flats moved by 2 years or more, 1% of the year’27Originally due 2028: 73,567 flats kept the original date, 86% of the yearOriginally due 2028: 19,235 flats moved by under 2 years, 14% of the yearOriginally due 2028: 1,816 flats moved by 2 years or more, 1% of the year’28Originally due 2029: 57,394 flats kept the original date, 87% of the yearOriginally due 2029: 15,040 flats moved by under 2 years, 12% of the yearOriginally due 2029: 720 flats moved by 2 years or more, 0% of the year’29Originally due 2030: 46,915 flats kept the original date, 85% of the yearOriginally due 2030: 13,067 flats moved by under 2 years, 15% of the year’30Originally due 2031: 27,040 flats kept the original date, 88% of the yearOriginally due 2031: 6,191 flats moved by under 2 years, 12% of the year’31Originally due 2032: 16,772 flats kept the original date, 88% of the yearOriginally due 2032: 1,087 flats moved by under 2 years, 12% of the year’32Originally due 2033: 1,793 flats kept the original date, 92% of the yearOriginally due 2033: 599 flats moved by under 2 years, 8% of the year’33Originally due 2034: 1,294 flats kept the original date, 78% of the yearOriginally due 2034: 597 flats moved by under 2 years, 22% of the year’34Originally due 2035: 871 flats kept the original date, 83% of the yearOriginally due 2035: 657 flats moved by under 2 years, 17% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Redevelopment in Pune

455 of the 14,005 registrations on this page (3%) show a redevelopment on their own filing. Over the last 12 months it is 145 of 1,152 new registrations (13%). See all 455 in the project list.

MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filings. A registration counts only when its own filing shows it: flats filed as rehab units (MahaRERA's column for homes returned to existing occupants or owners), a sanction from a slum rehabilitation authority, a MHADA layout in Mumbai, a redevelopment, tenant or alternate accommodation agreement among its documents, or a project name that says so. A redevelopment whose filing shows none of these is not counted, so the true number is higher.

KindRegistrationsFlats filedOf which rehab
Housing societies and other buildings43316,6187,137
Slum rehabilitation222,644321

Redevelopment registrations by year

YearRedevelopmentAllFiled the unit tableShare among those
2018*51,11911%3%
2019*61,03816%3%
2020*793419%3%
2021*161,07932%4%
2022*251,31945%4%
2023611,46064%7%
2024711,14278%8%
20251271,12089%13%
2026 (so far)1271,04295%13%

Rehab units, the commonest sign of a redevelopment, are filed in the building unit table, and most registrations before 2023 did not file that table. So the count in older years is lower than the truth by more, and a rise down the second column is partly filing. The last column holds the filing still: it is the share among registrations that did file the table, and it is the one to read as a trend. Starred years are ones where fewer than half filed it.

10 more registered in 2017, the year registration began, alongside every project already under way at the time, so that year is a backlog and not a launch year and is left out of the table.

When they promise possession

Each row is the year a redevelopment promised possession, split by what its registration says today. Completed is the only completion signal MahaRERA publishes, and it sits on the year the project promised, not the year it finished. Completed and lapsed registrations are mostly older ones, which filed the unit table less often, so those two columns understate more than the middle one.

Promised forCompletedOn the registerLapsed or cancelled
2022001
2023201
2024202
202512014
2026155912
20270970
202801060
20290800
20300320
20310150

The largest redevelopments on the register

Pratik Nagar Palladio Kothrud Central (1,008 flats filed), NEW FRIENDS (773 flats filed), NYATI EVANIA (377 flats filed), Suyog Shrushti (354 flats filed), Kshitij Residency (321 flats filed), LE SKYLARK (251 flats filed), SILVERISE SKYLIGHT (231 flats filed), ANTRIKSH TOWERS (215 flats filed).

Permissions and land in Pune

Who sanctions building in Pune

5,958 of the 14,005 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Pune Municipal Corporation2,251
Pimpri Chinchwad Municipal Corporation1,488
Pune Metropolitan Region Development Authority1,050
357 other bodies1,169

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 14,005 registrations on this page answers this: on 6,414 the promoter is the only owner named; on 6,340 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 1,251 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Pune: projects by taluka

14,005 of the 14,005 registrations on this page name their taluka.

TalukaProjectsShare
Haveli7,69755%
Mulshi1,94314%
Pune City1,67012%
Mawal9677%
Baramati5114%
11 other talukas1,2179%

Projects in Pune

Showing 1 to 60 of 14,005 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Godrej IvaraWAGHOLI, 400079Manjari Housing Projects LLP279211%20 Feb 2026Registered
CANARY FARMSAmbavne, 410401CANARY FARMS25980%1 Aug 2017Completed
Godrej Evergreen SquareRajiv Gandhi Infotech Park Phase III Industrial Area, 411057Godrej Projects Development Limited247671%29 Nov 2024Registered
The Aqua Retreat at Godrej Park WorldHinjawadi Phase 1, 411057Maan-Hinje Township Developers Private Limited186426%12 Jun 2025Registered
TANISH PARKCHARHOLI, 412105TANISH DEVELOPERS168296%13 Sep 2021Registered
Godrej Aqua VistaMundhawa, 411036Oxford Realty LLP158213%28 Jul 2025Registered
Ajinkya TowersCharoli, 412105APAK Bussiness Innovation Pvt Ltd146298%3 Feb 2023Registered
The Gale at Godrej Park WorldMaan Hinjewadi, 411057Maan-Hinje Township Developers Private Limited145574%21 Feb 2024Registered
Construction of 24 LIG, 768 MIG and commercial building on S.No. 126 127/1 Tathawade, Pune. Phase-IIBapu Buwaji Nagar, 411033Pune Housing & Area Development Board13880%1 Jan 2025Registered
Kohinoor AvantaraTathwade, 411033Intofinity Promoters Private Limited13730%2 Jan 2026Registered
Godrej ElanorNande, 412115Godrej Properties Limited13450%3 Nov 2026Registered
Godrej Emerald WatersPimpri, 411018Godrej Properties Limited133673%1 Jun 2023Registered
MAHA TRADE MARKET PH- 2BIBWEWADI, 411037JAIRAJ REALTY LLP131757%9 Oct 2019Registered
Balaji Dham Phase-1Misalawadi, 412205Garva Land Deal Private Limited126168%31 Aug 2017Registered
VTP BELLISSIMO PHASE 1HINJEWADI, 411057MAGNITE DEVELOPERS PRIVATE LIMITED124696%14 Mar 2022Registered
Flamingo ParkKadamwak Wasti, 412201Riverview City Constructions Ltd12420%18 Apr 2026Registered
Life Republic Sector R1 - 1st AvenuePune, 411057KOLTE-PATIL DEVELOPERS LIMITED1226100%2 Aug 2017Registered
Godrej Park GreensMamurdi, 412101Godrej Skyline Developers Limited121099%20 Feb 2019Registered
MAHA TRADE MARKET PH- 1MUNJERI PARISHAR, 411037JAIRAJ REALTY LLP119451%9 Oct 2019Registered
Falcon Towers at Riverview CityKadamwakwasti, 412201Riverview City Constructions Ltd116998%3 Dec 2021Completed
NYATI EQUINOX IBAVDHAN, 411021MIHIR HOMES ENTERPRISE LLP115775%7 Dec 2022Registered
The Greenfront at Godrej Park WorldMaan Hinjawadi, 411057Maan Hinje Township Developers Private Limited115272%3 Feb 2025Registered
FOREST GROVE AT GODREJ PARK GREENSMAMURDI VILLAGE, 412101Godrej Skyline Developers Limited113999%2 Dec 2019Registered
DwarikadhamKondhwa BK., 411048Yashodhan Affordable Landmark LLP113553%15 Jan 2019Registered
EverlandDarumbare, 410506EVITA KRISALA TOWNSHIP LLP112812%18 Aug 2025Registered
Yashwin Enchante Phase 2Wagholi, 412207Vilas Javdekar Infinitee Developers Pvt. Ltd.110017%16 Aug 2024Registered
Kohinoor Central Park - Phase 1Village Maan, 411057INTOFINITY PROMOTERS PRIVATE LIMITED109570%29 May 2024Registered
MAGNACITY - Tower A2Manjari, 412307Malnad Project (I) Pvt Ltd108064%25 Jan 2024Registered
SILVER GARDENIABORHADEWADI, 412105SILVER PROMOTERS AND DEVELOPERS104769%11 Apr 2022Registered
Yashwin Urbo Centro Phase 2Wakad, 411057Vilas Javdekar Infinitee Developers Pvt. Ltd.103978%21 Oct 2024Registered
Mangalam Life ParkDudulgoan Moshi, 412105Mangalam Buildcorp102273%14 Nov 2022Registered
Pratik Nagar Palladio Kothrud CentralKothrud, 411038RedevelopmentVilas Javdekar Infinitee Developers Pvt. Ltd.10081%3 Dec 2025Registered
Aishwaryam AnandChikhali, 412114Sai Essen Developers9956%9 Mar 2026Registered
Kohinoor Kaleido-Phase-IIPune, 412207Intofinity Promoters Private Limited99515%25 Nov 2024Registered
GODREJ WOODSVILLEHINJEWADI AND MAAN, 411057MAAN HINJE TOWNSHIP DEVELOPERS LLP99299%1 Sep 2022Registered
EARTH 1 BY VTP LUXE PHASE 1Mhalunge, 411045MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.98087%3 Jan 2023Registered
Godrej ElarisMundhwa South, 411036Godrej Properties Limited97228%3 Nov 2025Registered
AISHWARYAM INSIGNIAPUNAWALE, 411033VIKSAK VINODE INFRATECH LLP95292%22 Feb 2022Registered
Godrej GreensUndri, 412207DREAM WORLD LANDMARKS LLP95288%25 Jul 2017Completed
KOHINOOR UPTOWN AVENUEPunawale, 411033MOONSTONE REALINFRA PRIVATE LIMITED95066%4 Mar 2024Registered
Yashwin Enchante Phase 1Wagholi, 412207Vilas Javdekar Infinitee Developers Pvt. Ltd.94194%10 Aug 2022Registered
Aalaap - I at Nanded CityNanded Phata, 411068Nanded City Development & Construction Co. Ltd.93693%4 Mar 2024Registered
Geras Imperium Gateway A and CPCMC, 411034Gera Developments Private Limited93197%5 Aug 2021Completed
EVERLYNDarumbre, 410506EVITA KRISALA TOWNSHIP LLP92975%23 Feb 2026Registered
Birla Evam Phase 1Manjari Budruk, 412307Vypak Properties Private Limited9280%16 Jul 2025Registered
LUSH RESIDENCESOPP. AUSTIN COUNTY, 411033LUSH RESIDENCES LLP91172%14 Sep 2022Registered
SingaPune Ph 3Charoli Budruk, 412105Xrbia Mirth Properties LLP9020%23 Jul 2019Registered
RENUKA PANCHATATTVATathawade, 411033Renuka Realty Private Limited90153%8 Dec 2022Registered
VTP AURELIA PHASE 1MANJARI KH, 412307ASOJ REALTY LLP90142%16 Jul 2025Registered
Puraniks Abitante Fiore, Phase 2ANear Puraniks Abitante Phase 1, 411021Puranik Buildcon Private Limited89687%29 Mar 2019Registered
Godrej MeadowsMahalunge, 411045Mahalunge Township Developers Private Limited86898%12 Nov 2021Registered
LIFE REPUBLIC SECTOR R14/14TH AVENUE - QRIOUS/PHASE - IIJambe and Nere, 411033KOLTE-PATIL DEVELOPERS LIMITED86310%14 Oct 2025Registered
Sukhwani SkylinesVinode Nagar, 411057Sukhwani Chawla Developers85374%14 Jun 2019Registered
Amanora Arbano Towers 73,74,75 and 76Amanora Park Town, 411028City Corporation Limited84398%19 Jul 2023Registered
LIFE REPUBLIC SECTOR R34/34TH AVENUE-DUET/PHASE - IIJambhe & Nere, 411033KOLTE-PATIL DEVELOPERS LIMITED84327%4 Aug 2025Registered
ANP ULTIMUSNear Hotel Ranjai, Wakad, 411057SWADIK TRADE PRIVATE LIMITED84077%28 Nov 2022Registered
Kohinoor KaleidoWAGHOLI, 412207Intofinity Promoters Private Limited83299%15 Jun 2022Registered
Sukhwani KingsleyNear Padamji Paper Mill Thergaon, 411033Sukhwani Chawla Constructions83143%15 Oct 2021Registered
Sukhwani Hermosa CasaMundhawa, 411036Sukhwani Associates82780%25 Sep 2019Registered
Legacy MilestonePunawale, 411033Infinity Associates80633%14 Nov 2024Registered
Planning a launch in Pune? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Pune

KOLTE-PATIL DEVELOPERS LIMITED (54), Joyville Shapoorji Housing Private Limited (45), Lodha Developers Limited (42), PANDIT JAVDEKAR ASSOCIATES (36), Lavasa Corporation Ltd (31), ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED (29). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Pune projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 29% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Pune project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Pune district?

Within the municipal corporation areas of Pune district the rate is 7 percent for men and joint buyers and 6 percent for a woman buying in her sole name (metro cess and local body tax included). Municipal council areas pay 4 percent and gram panchayat areas 3 percent. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Pune registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Pune project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Pune district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.