Pratik Nagar Palladio Kothrud Central
By Vilas Javdekar Infinitee Developers Pvt. Ltd.
RG-MH-70677 · RERA PR1260002501660 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Rs 150.00 crore secured on the land, in favour of RBL BANK LIMITED
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pratik Nagar Palladio Kothrud Central is a Residential / Group Housing project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as PR1260002501660 on 3 Dec 2025. Possession is promised by 31 Dec 2030. 14 of the 1,008 units on this registration are recorded sold or booked, and 0 of 40 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NamePratik Nagar Palladio Kothrud Central
- TypeResidential / Group Housing
- Location
- Paud Road
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1260002501660
- ReraGenie IDRG-MH-70677
Builder
- NameVilas Javdekar Infinitee Developers Pvt. Ltd.
- Entity typeCompany
- CINU70109PN2020PTC195347
- GSTIN27AAHCV6956A1Z5
- DirectorsAditya Vilas Javdekar, Sarvesh Vilas Javdekar
- Other registrations10 more →
- Completed4 of 11
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Dec 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings4 building records
- Documents filed56 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 32 | 22 | 127 | 0 | 127 |
| Building B1-B2 | NA | 32 | 27 | 216 | 0 | 216 |
| Building C | NA | 32 | 28 | 135 | 0 | 135 |
| Building D | NA | 28 | 22 | 0 | 530 | 530 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 40 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.
Building A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B1-B20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
Parking filed1538
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Basement | Total |
|---|---|---|
| Building A | 146 | 146 |
| Building B1-B2 | 236 | 236 |
| Building C | 154 | 154 |
| Building D | 1,002 | 1,002 |
Land and ownership12
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| PRATIK NAGAR APARTMENT CONDOMINIUM | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 2 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR BUILDING NO. 3 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 4 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 5 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR BUIDLING NO. 6 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 7 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 8 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT KRAMANK 9 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR BUILDING NO. A1 AND A2 SAHAKARI GRUHARACHANA SANSTHA MARYADIT | Kothrud | Pune |
| PRATIK NAGAR IMARAT NIHAY SAHAKARI GRUHARACHANA SANSTHANCHA SANGH MARYADIT | Kothrud | Pune |
| PRATIK COOPERATIVE HOUSING SOCIETY LIMITED | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building B1-B2 | NA | Rs 105.11 cr | Rs 55.00 lakh |
| Building C | NA | Rs 83.28 cr | Rs 50.00 lakh |
| Building A | NA | Rs 82.95 cr | Rs 43.00 lakh |
| - | NA | Rs 52.92 cr | Rs 3.68 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sammer Valimbe |
| Architect | Deepali Patidar |
| Architect | Priya Honmute |
| Engineer | Sagar Kale |
| Chartered Accountant | Abhijit Mundada |
| Chartered Accountant | Sunil Nimbalkar |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Infinitee Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600237 | Ram Gawali | Vilas Javdekar Infinitee Developers Pvt. Ltd. | 06/04/2026 |
| SM12600239 | Ram Gawali | Vilas Javdekar Infinitee Developers Pvt. Ltd. | 06/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Feb 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2 A PN-PKC Signed.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate PN-PKC 31-03-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engg certi_PNRD 31032026 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: CA certificatePNRD 31-03-2026 signed compressed.pdf | 20 Apr 2026 |
| Layout approvalFile: PNRD_Layout for RERA as per sanction dated 03022026_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 02- Basement 3 Floor Plan_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 03- Basement 2 Floor Plan_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 04- Basement 1 Floor Plan_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 05- Ground Floor Plan_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 06- Mezzanine Floor Plan_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 07- 1st and 2nd Floor Plan (Building D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 08- 5th Floor Plan (Building D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 09- 6th 7th 8th and 9th Floor Plan (BUilding D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 10- 10th and 11th Floor Plan (Building D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 11- 12th Typical Refuge and Terrace Floor Plan (Building D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 12- Section and Elevation (Building D)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 13- Ground and 1st Floor Plan (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 14- 6th and Typical Floor Plan (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 15- Refuge and 24th 25th 26th and 27th Floor Plan (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 16- 28th and Terrace Floor Plan (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 17- Elevation (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 18- Section (Building A)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 19- Ground and 1st Floor Plan (Building B1-B2)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 20- Typical Floor Plan (Building B1-B2)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 21- Refuge Floor Plan (Building B1-B2)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 22- Section (Building B1-B2)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 23- Elevation (Building B1-B2)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 24- Ground and 1st Floor Plan (Building C)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 25- Typical and Refuge Floor Plan (Building C)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 26- Elevation (Building C)_compressed.pdf | 10 Feb 2026 |
| Building plan approvalFile: 27- Section (Building C)_compressed.pdf | 10 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate PN-PKC 31-12-25.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Engineer certificate PN-PKC 31-12-25 .pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: CA Certiifcate PN-PKC 31-12-25 .pdf | 16 Jan 2026 |
| Layout approvalFile: 1_PNRD_Layout for RERA as per sanction dated 19112025_compressed.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 1 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 2 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 3 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building B1-B2 - Basement 1 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building B1-B2- Basement 2 floor plan & Section.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building B1-B2- Basement 2 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building B1-B2- Floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building C- Basement 1 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building C- Basement 2 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building C- Floor plan & Section.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building C- Floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: 01- Layout.pdf | 26 Nov 2025 |
| Building plan approvalFile: 02- Layout.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 1 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 2 floor plan.pdf | 26 Nov 2025 |
| Layout approvalFile: 2_PNRD_Layout for RERA as per sanction dated 19112025.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Basement 3 floor plan.pdf | 26 Nov 2025 |
| Building plan approvalFile: Building A- Floor plan.pdf | 26 Nov 2025 |
| Layout approvalFile: 2_PNRD_Layout for RERA as per sanction dated 19112025.pdf | 26 Nov 2025 |
| Declaration and undertaking (Annexure A)File: Annexure A PN-PKC.pdf | 20 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Pratik Nagar Palladio Kothrud Central on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 298 registered projects within 2 km.
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
CITY RISE
BHUPAL PATWARDHAN AND SONS LLP
Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.
Vilas Javdekar Infinitee Developers Pvt. Ltd. has 11 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Pratik Nagar Palladio Kothrud Central is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pratik Nagar Palladio Kothrud Central?
The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pratik Nagar Palladio Kothrud Central?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Pratik Nagar Palladio Kothrud Central?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Pratik Nagar Palladio Kothrud Central?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pratik Nagar Palladio Kothrud Central?
The professionals named in the filing: Architect: Sammer Valimbe; Architect: Deepali Patidar; Architect: Priya Honmute; Engineer: Sagar Kale; Chartered Accountant: Abhijit Mundada; Chartered Accountant: Sunil Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pratik Nagar Palladio Kothrud Central?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback