Home / Browse projects / Pune, Maharashtra / The Gale at Godrej Park World

Registered Litigation declared Others project

The Gale at Godrej Park World

By Maan-Hinje Township Developers LLP

RG-MH-68042 · RERA P52100054971 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA
  • Rs 300.00 crore secured on the land, in favour of ICICI Bank Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
25 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 19%
398 of 1,455Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 161 documents Report an error

The Gale at Godrej Park World is a Others project by Maan-Hinje Township Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100054971 on 21 Feb 2024. Possession is promised by 31 Mar 2029. 1,057 of the 1,455 units on this registration are recorded sold or booked, and 25 of 66 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameThe Gale at Godrej Park World
  • TypeOthers
  • Location
    • Maan Mahalunge Road
    • Maan Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054971
  • ReraGenie IDRG-MH-68042

Builder

  • NameMaan-Hinje Township Developers LLP
  • Entity typeOthers
  • GSTIN27AAQFG6891D1ZX
  • DirectorsSubhasish Jyotishchandra Pattanaik Pattanaik, Abhishek Sahaya Sahaya
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed161 files

Current status

73%1057 of 1,455 units booked
21.1%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER-1 A and BNA41362820282
TOWER-2 C and DNA41362780278
TOWER-3 E and FNA41362780278
TOWER-4 G and HNA41362820282
TOWER-5 I and JNA41362820282
RETAILNA5105353

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 19%.

TOWER-1 A and B46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER-2 C and D47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure19%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER-3 E and F46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER-4 G and H46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER-5 I and J46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RETAIL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1637

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,637
Closed/Covered1,637
BuildingClosed/CoveredTotal
TOWER-1 A and B329329
TOWER-2 C and D325325
TOWER-3 E and F325325
TOWER-4 G and H329329
TOWER-5 I and J329329

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area25,491 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank Limited
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on5 Sep 2024

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI154372.76
Proposed, not sanctioned152,812 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank, the Address Commercia, Wakad Highway Branch, Wakad Pune
Estimated costRs 814.91 cr
Cost incurredRs 172.03 cr
Work done21.11%
BuildingWingEstimatedIncurred
TOWER-1 A and BNARs 172.69 crRs 45.47 cr
TOWER-3 E and FNARs 170.76 crRs 34.29 cr
TOWER-4 G and HNARs 165.78 crRs 30.02 cr
TOWER-5 I and JNARs 137.62 crRs 24.59 cr
TOWER-2 C and DNARs 133.99 crRs 30.57 cr
RETAILNARs 34.08 crRs 7.09 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK: a architecture
ArchitectANA Consortium Pvt Ltd
EngineerSamartha Constro Consultants LLP
Chartered AccountantMD Deshpande & Co Chartered Accountants
Chartered AccountantBSR & Co. LLP
PartnerRole in project
Maan-Hinje Township Developers LLP-

Litigation declared1

CaseCourtStatus
843/2024Civil Judge Senior Division Pune Muktabai Parkhe vs Deepak BhondwePending

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12600015Ram GawaliMaan-Hinje Township Developers LLP06/01/2026
CC12601895KN srinivasanMaan-Hinje Township Developers LLP31/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed161

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 161 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 260422_Form 2A_The Gale at Godrej Park World.pdf23 Apr 2026
Withdrawal Update Form 1File: R17_RERA FORM-1_16-04-2026.pdf21 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate for Godrej R17 Maan-Hinje 10 Apr 26.pdf21 Apr 2026
Withdrawal Update Form 3File: Signed The Gale_Mar 26.pdf21 Apr 2026
Withdrawal Update Form 1File: R-17_Rera Form -1_17-01-2026.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 R17.pdf22 Jan 2026
Withdrawal Update Form 3File: Signed_The Gale_Dec 25.pdf22 Jan 2026
Withdrawal Update Form 1File: R-17_RERA FORM-1_16-10-2025.pdf22 Oct 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate for Godrej R17 Maan-Hinje 7 Oct 25.pdf22 Oct 2025
Withdrawal Update Form 3File: Signed_MDD_Maan Hinje The Gale_RERA_Sep_25.pdf22 Oct 2025
Form 5 (FY 2024-2025)File: The Gale 2025_11zon.pdf5 Sep 2025
Form 1File: R17_Rera Form -1 _23-07-2025.pdf29 Jul 2025
Form 2File: Engineer's Certificate for Godrej R17 Maan-Hinje 17 Jul 25.pdf29 Jul 2025
Form 3File: MDD_Maan Hinje The Gale_RERA_June_25 (Signed).pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q1 The Gale Sales Disclosure.pdf29 Jul 2025
Form 1File: R-17_Rera Form-1.pdf7 Jul 2025
Form 2File: Engineer's Certificate for Godrej R17 Maan-Hinje 15 Apr 2025.pdf7 Jul 2025
Form 3File: Signed_MDD_Maan Hinje The Gale_RERA_Mar_24.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q4 The Gale Sales Disclosure.pdf7 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: The Gale at Godrej Park World - Form 2A (Quality Assurance certificate).pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R-17_Rera Form-1.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Gale Form 3.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate for Godrej R17 Maan-Hinje 15 Apr 2025.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Q4 The Gale Sales Disclosure.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Q3 The Gale Sales Disclosure R14.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R17 Form 1.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R14 Form 3.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R14 Form 2.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Gale Form -1 VK MTDPL 1.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Q2 The Gale Sales Disclosure R14.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Gale Form - 3 MDD MTDPL.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 R17 Sam MTDPL.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: The Gale.pdf10 Oct 2024
PAN CardFile: Private Limited PAN Card.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: The Gale.pdf19 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240703 - RERA Certificate (Form 1) - R17 Sealed.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate for Godrej R17 Maan-Hinje 8 Jul 2024 (1) Sealed.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: The Gale - Towers 1 to 5 _Sales_Disclosure Sealed.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - June'24 - The Gale.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Gale.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Gale.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate for Godrej R17 Maan-Hinje 31 Mar 2024 RS.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Gale.pdf8 Apr 2024
Building plan approvalFile: 28-37_11zon.pdf15 Feb 2024
Building plan approvalFile: 35-37_11zon.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 28-37_11zon.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 35-37_11zon.pdf15 Feb 2024
Proforma of Agreement for saleFile: Draft AFS_R17_16022024 - Revised_clean.pdf15 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Model agreement AFS.pdf15 Feb 2024
Building plan approvalFile: 7-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 8-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 9-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 13-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 14-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 15-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 19-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 20-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 21-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 25-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 26-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 27-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 32-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 33-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 34-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 36-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 31-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 22-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 23-37_compressed.pdf10 Feb 2024
Building plan approvalFile: 23-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 7-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 8-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 9-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 13-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 14-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 15-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 19-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 20-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 21-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 25-37_compressed.pdf10 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 26-37_compressed.pdf10 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Godrej WoodsvilleMaan Hinjewadi Road Mulshi Pune992OngoingNov 2026Nov 2026

How this compares with Pune

73%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Gale at Godrej Park World on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Maan Hinjewadi13,700+ in Pune

2 kmThe Gale at Godrej Park Completed 31Lapsed / revoked 14Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: Maan-Hinje Township Developers LLP

MAAN HINJE TOWNSHIP DEVELOPERS LLP has 4 registrations on MahaRERA, including GODREJ WOODSVILLE and Godrej Eden Estate Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Gale at Godrej Park World is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Gale at Godrej Park World?

The registered promoter entity is Maan-Hinje Township Developers LLP, an others as per the filing. Its GSTIN 27AAQFG6891D1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Gale at Godrej Park World?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Gale at Godrej Park World?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Gale at Godrej Park World?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Gale at Godrej Park World?

The professionals named in the filing: Architect: VK: a architecture; Architect: ANA Consortium Pvt Ltd; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: MD Deshpande & Co Chartered Accountants; Chartered Accountant: BSR & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Gale at Godrej Park World?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Gale at Godrej Park World. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Gale at Godrej Park World to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.