ReraGenieLog inGet a buyer report

Home / Areas / Raigarh

New projects and RERA data in Raigarh district, Maharashtra

5975 projects are registered in Raigarh district: 254,033 units across them, 392 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

5975Projects covered
392Registered, last 12 months
254,033Units declared
163,753Units not yet booked
1273Completion dates revised
109With declared litigation

Of the 5975 covered registrations, 1273 have revised their promised completion date and 109 declare litigation. The median project here is 28% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Free · a new edition every month

Navi Mumbai and Raigad monthly RERA report

What registered month by month, this city against its own twelve-month run and against the other six, with the possession pipeline, the taluka split and the busiest pincodes. Built from the same filings as this page.

October 2026: 42 new registrations, 4,626 homes and units.

When Raigarh projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 5,975 projects with a promised date, 2,485 are recorded delivered, 1,947 are still on the register and 1,543 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

02505007501,000today2017: 59 projects, delivered2017: 4 projects, registration lapsed or cancelled’172018: 247 projects, delivered2018: 41 projects, registration lapsed or cancelled’182019: 241 projects, delivered2019: 78 projects, registration lapsed or cancelled’192020: 132 projects, delivered2020: 45 projects, registration lapsed or cancelled’202021: 248 projects, delivered2021: 119 projects, registration lapsed or cancelled’212022: 473 projects, delivered2022: 250 projects, registration lapsed or cancelled’222023: 454 projects, delivered2023: 311 projects, registration lapsed or cancelled’232024: 234 projects, delivered2024: 277 projects, registration lapsed or cancelled’242025: 231 projects, delivered2025: 278 projects, registration lapsed or cancelled’252026: 123 projects, delivered2026: 397 projects, on the register2026: 133 projects, registration lapsed or cancelled’262027: 35 projects, delivered2027: 558 projects, on the register’272028: 6 projects, delivered2028: 383 projects, on the register2028: 1 projects, registration lapsed or cancelled’282029: 2 projects, delivered2029: 278 projects, on the register2029: 3 projects, registration lapsed or cancelled’292030: 186 projects, on the register2030: 1 projects, registration lapsed or cancelled’302031: 80 projects, on the register’312032: 45 projects, on the register’322033: 13 projects, on the register’332034: 6 projects, on the register’342035: 1 projects, on the register’35

2,251 projects promise possession in 2026 or later. Years outside 2017 to 2035 hold 2 further projects and are not shown. Facts as per filings on RERA website.

025k50k75k100ktoday’172018: 263 flats, delivered (only 9 of 288 projects filed a flat count)2018: 309 flats, registration lapsed or cancelled (only 9 of 288 projects filed a flat count)’182019: 272 flats, delivered (only 8 of 319 projects filed a flat count)2019: 380 flats, registration lapsed or cancelled (only 8 of 319 projects filed a flat count)’192020: 1,937 flats, delivered (only 6 of 177 projects filed a flat count)2020: 181 flats, registration lapsed or cancelled (only 6 of 177 projects filed a flat count)’202021: 480 flats, delivered (only 31 of 367 projects filed a flat count)2021: 615 flats, registration lapsed or cancelled (only 31 of 367 projects filed a flat count)’212022: 524 flats, delivered (only 19 of 723 projects filed a flat count)2022: 1,015 flats, registration lapsed or cancelled (only 19 of 723 projects filed a flat count)’222023: 924 flats, delivered (only 37 of 765 projects filed a flat count)2023: 887 flats, registration lapsed or cancelled (only 37 of 765 projects filed a flat count)’232024: 173 flats, delivered (only 25 of 511 projects filed a flat count)2024: 1,279 flats, registration lapsed or cancelled (only 25 of 511 projects filed a flat count)’242025: 6,046 flats, delivered (only 163 of 509 projects filed a flat count)2025: 6,797 flats, registration lapsed or cancelled (only 163 of 509 projects filed a flat count)’252026: 6,419 flats, delivered2026: 38,352 flats, on the register2026: 4,762 flats, registration lapsed or cancelled’262027: 2,385 flats, delivered2027: 49,228 flats, on the register’272028: 1,136 flats, delivered2028: 38,233 flats, on the register2028: 63 flats, registration lapsed or cancelled’282029: 59 flats, delivered2029: 34,273 flats, on the register’292030: 26,535 flats, on the register2030: 107 flats, registration lapsed or cancelled’302031: 12,234 flats, on the register’312032: 13,716 flats, on the register’322033: 3,466 flats, on the register’332034: 814 flats, on the register’342035: 41 flats, on the register’35

231,823 flats are promised in 2026 or later, across the 81% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Years outside 2017 to 2035 hold 2 further projects and are not shown. Facts as per filings on RERA website.

How far Raigarh possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 1,268 of 5,975 projects (21%) have moved at least once; the median move is 18 months and the longest is 140 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

02505007501,000Originally due 2017: 63 projects kept the original date, 91% of the yearOriginally due 2017: 6 projects moved by under 2 years, 9% of the year’17Originally due 2018: 275 projects kept the original date, 73% of the yearOriginally due 2018: 59 projects moved by under 2 years, 16% of the yearOriginally due 2018: 41 projects moved by 2 years or more, 11% of the year’18Originally due 2019: 273 projects kept the original date, 70% of the yearOriginally due 2019: 43 projects moved by under 2 years, 11% of the yearOriginally due 2019: 74 projects moved by 2 years or more, 19% of the year’19Originally due 2020: 126 projects kept the original date, 64% of the yearOriginally due 2020: 34 projects moved by under 2 years, 17% of the yearOriginally due 2020: 36 projects moved by 2 years or more, 18% of the year’20Originally due 2021: 327 projects kept the original date, 75% of the yearOriginally due 2021: 51 projects moved by under 2 years, 12% of the yearOriginally due 2021: 58 projects moved by 2 years or more, 13% of the year’21Originally due 2022: 615 projects kept the original date, 79% of the yearOriginally due 2022: 71 projects moved by under 2 years, 9% of the yearOriginally due 2022: 88 projects moved by 2 years or more, 11% of the year’22Originally due 2023: 651 projects kept the original date, 77% of the yearOriginally due 2023: 82 projects moved by under 2 years, 10% of the yearOriginally due 2023: 109 projects moved by 2 years or more, 13% of the year’23Originally due 2024: 389 projects kept the original date, 70% of the yearOriginally due 2024: 93 projects moved by under 2 years, 17% of the yearOriginally due 2024: 74 projects moved by 2 years or more, 13% of the year’24Originally due 2025: 343 projects kept the original date, 70% of the yearOriginally due 2025: 111 projects moved by under 2 years, 23% of the yearOriginally due 2025: 34 projects moved by 2 years or more, 7% of the year’25Originally due 2026: 417 projects kept the original date, 80% of the yearOriginally due 2026: 82 projects moved by under 2 years, 16% of the yearOriginally due 2026: 23 projects moved by 2 years or more, 4% of the year’26Originally due 2027: 406 projects kept the original date, 92% of the yearOriginally due 2027: 23 projects moved by under 2 years, 5% of the yearOriginally due 2027: 12 projects moved by 2 years or more, 3% of the year’27Originally due 2028: 307 projects kept the original date, 94% of the yearOriginally due 2028: 19 projects moved by under 2 years, 6% of the year’28Originally due 2029: 239 projects kept the original date, 93% of the yearOriginally due 2029: 17 projects moved by under 2 years, 7% of the year’29Originally due 2030: 157 projects kept the original date, 89% of the yearOriginally due 2030: 18 projects moved by under 2 years, 10% of the yearOriginally due 2030: 1 projects moved by 2 years or more, 1% of the year’30Originally due 2031: 62 projects kept the original date, 91% of the yearOriginally due 2031: 5 projects moved by under 2 years, 7% of the yearOriginally due 2031: 1 projects moved by 2 years or more, 1% of the year’31Originally due 2032: 42 projects kept the original date, 98% of the yearOriginally due 2032: 1 projects moved by under 2 years, 2% of the year’32Originally due 2033: 10 projects kept the original date, 83% of the yearOriginally due 2033: 2 projects moved by under 2 years, 17% of the year’33Originally due 2034: 5 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

012k25k37k50k’17Originally due 2018: 572 flats kept the original date, 73% of the year (only 22 of 375 projects filed a flat count)Originally due 2018: 152 flats moved by under 2 years, 16% of the year (only 22 of 375 projects filed a flat count)Originally due 2018: 1,080 flats moved by 2 years or more, 11% of the year (only 22 of 375 projects filed a flat count)’18Originally due 2019: 638 flats kept the original date, 70% of the year (only 20 of 390 projects filed a flat count)Originally due 2019: 1,500 flats moved by 2 years or more, 19% of the year (only 20 of 390 projects filed a flat count)’19Originally due 2020: 2,004 flats kept the original date, 64% of the year (only 16 of 196 projects filed a flat count)Originally due 2020: 868 flats moved by 2 years or more, 18% of the year (only 16 of 196 projects filed a flat count)’20Originally due 2021: 1,095 flats kept the original date, 75% of the year (only 51 of 436 projects filed a flat count)Originally due 2021: 16 flats moved by under 2 years, 12% of the year (only 51 of 436 projects filed a flat count)Originally due 2021: 1,596 flats moved by 2 years or more, 13% of the year (only 51 of 436 projects filed a flat count)’21Originally due 2022: 1,199 flats kept the original date, 79% of the year (only 64 of 774 projects filed a flat count)Originally due 2022: 198 flats moved by under 2 years, 9% of the year (only 64 of 774 projects filed a flat count)Originally due 2022: 5,852 flats moved by 2 years or more, 11% of the year (only 64 of 774 projects filed a flat count)’22Originally due 2023: 1,216 flats kept the original date, 77% of the year (only 109 of 842 projects filed a flat count)Originally due 2023: 487 flats moved by under 2 years, 10% of the year (only 109 of 842 projects filed a flat count)Originally due 2023: 7,811 flats moved by 2 years or more, 13% of the year (only 109 of 842 projects filed a flat count)’23Originally due 2024: 887 flats kept the original date, 70% of the year (only 118 of 556 projects filed a flat count)Originally due 2024: 4,461 flats moved by under 2 years, 17% of the year (only 118 of 556 projects filed a flat count)Originally due 2024: 6,685 flats moved by 2 years or more, 13% of the year (only 118 of 556 projects filed a flat count)’24Originally due 2025: 7,653 flats kept the original date, 70% of the year (only 234 of 488 projects filed a flat count)Originally due 2025: 17,048 flats moved by under 2 years, 23% of the year (only 234 of 488 projects filed a flat count)Originally due 2025: 15,129 flats moved by 2 years or more, 7% of the year (only 234 of 488 projects filed a flat count)’25Originally due 2026: 23,056 flats kept the original date, 80% of the yearOriginally due 2026: 7,972 flats moved by under 2 years, 16% of the yearOriginally due 2026: 3,033 flats moved by 2 years or more, 4% of the year’26Originally due 2027: 26,752 flats kept the original date, 92% of the yearOriginally due 2027: 3,279 flats moved by under 2 years, 5% of the yearOriginally due 2027: 2,007 flats moved by 2 years or more, 3% of the year’27Originally due 2028: 27,577 flats kept the original date, 94% of the yearOriginally due 2028: 2,634 flats moved by under 2 years, 6% of the year’28Originally due 2029: 27,404 flats kept the original date, 93% of the yearOriginally due 2029: 2,355 flats moved by under 2 years, 7% of the year’29Originally due 2030: 18,837 flats kept the original date, 89% of the yearOriginally due 2030: 3,522 flats moved by under 2 years, 10% of the yearOriginally due 2030: 778 flats moved by 2 years or more, 1% of the year’30Originally due 2031: 9,238 flats kept the original date, 91% of the yearOriginally due 2031: 609 flats moved by under 2 years, 7% of the yearOriginally due 2031: 108 flats moved by 2 years or more, 1% of the year’31Originally due 2032: 12,553 flats kept the original date, 98% of the yearOriginally due 2032: 17 flats moved by under 2 years, 2% of the year’32Originally due 2033: 2,977 flats kept the original date, 83% of the yearOriginally due 2033: 593 flats moved by under 2 years, 17% of the year’33Originally due 2034: 585 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Redevelopment in Raigarh

89 of the 5,975 registrations on this page (1%) show a redevelopment on their own filing. Over the last 12 months it is 34 of 392 new registrations (9%). See all 89 in the project list.

MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filings. A registration counts only when its own filing shows it: flats filed as rehab units (MahaRERA's column for homes returned to existing occupants or owners), a sanction from a slum rehabilitation authority, a MHADA layout in Mumbai, a redevelopment, tenant or alternate accommodation agreement among its documents, or a project name that says so. A redevelopment whose filing shows none of these is not counted, so the true number is higher.

KindRegistrationsFlats filedOf which rehab
Housing societies and other buildings896,0652,596

Redevelopment registrations by year

YearRedevelopmentAllFiled the unit tableShare among those
2018*055510%0%
2019*084010%0%
2020*151611%2%
2021*241719%1%
2022*1147641%5%
2023851964%2%
20241247176%3%
20252138483%7%
2026 (so far)3136090%10%

Rehab units, the commonest sign of a redevelopment, are filed in the building unit table, and most registrations before 2023 did not file that table. So the count in older years is lower than the truth by more, and a rise down the second column is partly filing. The last column holds the filing still: it is the share among registrations that did file the table, and it is the one to read as a trend. Starred years are ones where fewer than half filed it.

3 more registered in 2017, the year registration began, alongside every project already under way at the time, so that year is a backlog and not a launch year and is left out of the table.

When they promise possession

Each row is the year a redevelopment promised possession, split by what its registration says today. Completed is the only completion signal MahaRERA publishes, and it sits on the year the project promised, not the year it finished. Completed and lapsed registrations are mostly older ones, which filed the unit table less often, so those two columns understate more than the middle one.

Promised forCompletedOn the registerLapsed or cancelled
2022100
2024100
2025301
20264111
20270150
20280190
20290120
20300110
2031050

The largest redevelopments on the register

Tulsi Sahyadri (482 flats filed), Bharat Enclave (422 flats filed), Grand Uran Central (285 flats filed), Tulsi Omkar (249 flats filed), Planet Bayfront Residences (239 flats filed), MAZAGON DOCK MANDAR CO-OP. HSG.SOC.LTD. (234 flats filed), Shravan Siddhant (187 flats filed), SHREE PARK (174 flats filed).

Permissions and land in Raigarh

Who sanctions building in Raigarh

2,048 of the 5,975 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
CIDCO743
Panvel Municipal Corporation319
301 other bodies986

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 5,975 registrations on this page answers this: on 3,226 the promoter is the only owner named; on 2,487 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 262 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Raigarh: projects by taluka

5,975 of the 5,975 registrations on this page name their taluka.

TalukaProjectsShare
Panvel3,72462%
Karjat85914%
Khalapur3476%
Uran2474%
Alibag1973%
9 other talukas60110%

Projects in Raigarh

Showing 1 to 60 of 5,975 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Plot No -1 Sector -29 TalojaTaloja, 410208CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED79140%13 Feb 2021Registered
Plot No.-1 Sector -39 TalojaTaloja, 410208CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED750917%18 May 2022Registered
Plot No -1 Sector -31 TalojaTaloja, 410208CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED40850%11 Apr 2022Registered
Plot No -1 Sector - 28 Khandeshwar Railway StationKamothe, 410209CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED158957%18 Feb 2021Registered
KHARGHAR HILLSVILLAGE- ADIWALI, 410210TODAY PRACHAR DEVELOPERS LLP, BHADRESH RAJESH SHAH, BHAVESH RAJESH SHAH, RATANLAL NEMICHAND JAIN, RAKESHKUMAR NEMICHAND JAIN, RAJESH NEMICHAND JAIN14230%27 Aug 2026Registered
Plot No -77 Sector -17 Kalamboli Bus DepotKALAMBOLI, 410218CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED137815%10 Feb 2021Registered
SAI SUNCITY PHASE IIGhot, 410208Chariot Properties LLP135284%18 May 2022Registered
Bellezza WoodsPatharaj, 410201DOTOM BUILD SQUARE13250%14 Jan 2020Completed
ARIHANT ASPIRE PHASE IPanvel, 410221ARIHANT ABODE LIMITED121092%7 Nov 2017Registered
Plot No -2,Sector-39,Mansarovar Railway StationMansarovar, 410209CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED120455%25 Aug 2021Registered
SHREE RAM DELTAPushpak- Vahal, 410206Shreenathji Enterprises10920%18 Aug 2026Registered
ForeverLandBudruk, 410101HOABL IMPACTUM LAND PRIVATE LIMITED102843%7 Nov 2024Registered
Indiabulls Park 4Panvel, 410207Lucina Land Development Limited99468%18 Jul 2017Registered
Godrej Woodside Estate Phase 1Khalapur, 410202Godrej Projects Development Limited99094%13 Aug 2024Completed
Green Terraces, Godrej City, PanvelKhanavale, 410221CAROA PROPERTIES LLP98758%13 Nov 2024Registered
Godrej Hillview EstateGolewadi, 410203Godrej Projects Development Limited97061%18 Mar 2024Completed
Nexspace, Godrej City, PanvelPANVEL, 410221CAROA PROPERTIES LLP94649%8 Dec 2025Registered
Indiabulls Park 3Panvel, 410207Lucina Land Development Limited93782%18 Jul 2017Registered
Neoliv Grand ForestVadval, 410203Dream Estate LLP9370%15 Oct 2026Registered
BrillanteKolkhe, 410206Callista Realty Limited90221%11 Aug 2017Registered
The Highlands, Godrej City, PanvelTalegaon, 410221CAROA PROPERTIES LLP87795%25 Oct 2020Registered
Gami Bhagwati OreliaKharghar, 410210GAMI VISION PRIVATE LIMITED8620%3 Sep 2026Registered
Plot No. 14 Sector-37 TalojaTaloja, 410208CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED8290%18 Feb 2021Registered
Chitrapatjanak Dadasaheb Phalke Township - Phase 1Karjat Badlapur Road, 410101Anukarati Homes Pvt Ltd81398%7 Nov 2022Registration lapsed
Olympeo Neo CityNeral, 410101PRIZTINE INFRA LLP81236%13 Nov 2017Registered
ANANDAM - IIPANVEL, 410210TODAY GLOBAL HOMES80762%7 Dec 2022Registered
Indiabulls Park 1Panvel, 410207Lucina Land Development Limited80474%20 Jul 2017Registered
Indiabulls Park 2Panvel, 410207Lucina Land Development Limited80471%23 Jul 2017Registered
ARIHANT ADARSH PHASE IPANVEL, 410208ARIHANT SUPERSTRUCTURES LIMITED77850%6 Jun 2022Registered
Metro Satyam Queens NecklaceRohinjan, 410208Metrosatyam Builders LLP77373%10 Nov 2023Registered
SWARAJ COMPLEXPOLADPUR, 402303AMI REALTY DEVELOPERS LLP76828%15 Feb 2024Registered
Godrej Varanya Phase 1Kharghar, Navi Mumbai, 410210Godrej Properties Limited74128%12 Feb 2026Registered
SAI WORLD CITY PHASE 3Kolkhe, 421206Paradise Lifespaces LLP73442%28 Nov 2023Registered
SAI SUNCITY PHASE 3Ghot, 410206Chariot Properties LLP67683%1 Sep 2022Registered
Sai World Empire Phase IIIRohinjan, 410210paradisesuperstructures67234%3 May 2021Registered
ANANDAM PHASE - IIPANVEL, 410206TODAY GLOBAL HOMES65567%8 Jul 2019Registered
Maximus Residency Phase-IAshte, 410206Superb Maa Developers LLP65270%11 Jun 2024Registered
HAWARE GRANDEPen (M Cl), 402107HAWARE GRANDE6499%1 Sep 2025Registered
AVANYAVILLAGE- DHARNA CAMP, 410208TODAY GLOBAL REALTY LLP6440%19 May 2026Registered
Sai Vrindavan DhamNEW PANVEL EAST, 410206KT & LK SWEET HOMES62558%22 Apr 2025Registered
FLORENCENAVI MUMBAI, 410209VILLA REALCON LLP61617%18 Jun 2019Registered
LA MER ONEPalaspe, 410221La Mer Homes LLP61084%13 Nov 2024Registered
AeroEstateVillage Khambewadi, Taluka Khalapur, 410203HOABL Landmark Realty Private Limited58974%19 Dec 2024Registered
Indiabulls Savroli - 3Near Khalapur Toll Naka, 410202Sylvanus Properties Limited55824%4 Aug 2017Registered
ARIHANT 7ANAIKAKOYNAVELE, 410208ARIHANT SUPERSTRUCTURES LIMITED54918%31 May 2024Registered
Winds of CalmTadwadi, 410201Eiffel Lifespaces Pvt Ltd5404%29 Jul 2019Registration lapsed
Golf Meadows Godrej City, PanvelKhanavale, 410206CAROA PROPERTIES LLP53698%11 Oct 2018Completed
ARIHANT CLAN AALISHAN PHASE IPanvel, 410206ARIHANT VATIKA REALTY PRIVATE LIMITED52775%14 Aug 2017Completed
Emperia Hill CrestPanvel, 410221Emperia Builtcon52355%24 Jul 2023Registered
SAI WORLD CITY PHASE IIPanvel, 410206Paradise Lifespaces LLP52283%12 Oct 2019Completed
SHREEJI DIVINERAIGAD, 410208SHREEJI VENTURES LIFESPACES LLP52133%17 Mar 2022Registered
ARIHANT CLAN AALISHAN PHASE IIROHINJAN, 410206ARIHANT VATIKA REALTY PRIVATE LIMITED51551%27 Jul 2018Registered
VILLA ONEDronagiri, Navi Mumbai, 400702Khodiyar Realtech LLP51514%20 Mar 2025Registered
Yogakshema Residency Phase-IIGiravale, 410221Superb Maa Infra and Housing LLP50536%10 Nov 2023Registered
RISING SUNKewale, 410206LAKHOTIA MULTI BUSINESS PRIVATE LIMITED50319%17 May 2026Registered
KANAKIA VALLEYBhokarpada, 410221KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIMITED5000%30 Apr 2026Registered
SvaasaBhilavale, 410206Sensation Fortune Varalakshmi Private Limited5000%29 May 2026Registered
Mahaavir Exotique Phase IROHINJAN, 410208MAHAAVIR SUPERSTRUCTURES PRIVATE LIMITED49792%11 Oct 2021Registered
Tulsi SahyadriPanvel, 410206RedevelopmentTulsi Homemaker LLP48216%16 May 2024Registered
COMMANDERS HEERA SIDDHI HOMES PHASE IIIKARADE KHURD, 410220MEGAPLEX PROPERTIES LLP48013%16 Dec 2019Registered
Planning a launch in Raigarh? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Raigarh

Persipina Developers Private Limited (38), SANVO RESORTS PVT. LTD. (37), Wadhwa Construction and Infrastructure Private Limited (31), CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED (21), Mahindra Lifespace Developers limited (17), Shree Riddhi Siddhi Constructions (16). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Raigarh projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 28% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Raigarh project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Raigarh district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Raigarh registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Raigarh project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Raigarh district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.