Home / Browse projects / Pune, Maharashtra / Godrej Ivara

Registered No litigation declared Residential / Group Housing project

Godrej Ivara

By Manjari Housing Projects LLP

RG-MH-51384 · RERA PR1260002502426 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2032Possession promisedno revision filed
0 of 110Construction stages doneacross 11 buildings; furthest along: Excavation, 0%
2,481 of 2,792Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Godrej Ivara is a Residential / Group Housing project by Manjari Housing Projects LLP in Pune, Maharashtra, registered with MahaRERA as PR1260002502426 on 20 Feb 2026. Possession is promised by 16 Aug 2032. 311 of the 2,792 units on this registration are recorded sold or booked, and 0 of 110 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Ivara
  • TypeResidential / Group Housing
  • Location
    • Gat no. 1276/39
    • 1276/40
    • 1276/2
    • 1276/3
    • 1276/5
    • WAGHOLI
    • Haveli
    • Pune
    • 400079
  • Pincode400079
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502426
  • ReraGenie IDRG-MH-51384

Builder

  • NameManjari Housing Projects LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAJ-2162
  • GSTIN27AARFG0014F1ZP
  • Designated PartnersAbhishek Sahaya, Anand Kheria
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredFeb 2026PromisedAug 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2026
  • Promised completion16 Aug 2032
  • Revised completionNone
  • Buildings11 building records
  • Documents filed70 files

Current status

11%311 of 2,792 units booked
0.1%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA43382980298
Tower BNA42382940294
Tower CNA41382900290
Tower DNA38362620262
Tower ENA37362580258
Tower FNA38372740274
Tower GNA37352540254
Tower HNA38352580258
Tower INA38342540254
Tower JNA40361730173
Tower KNA42361770177

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 110 construction stages are filed complete across 11 buildings. The stage furthest along is Excavation, at 0%.

Tower A0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower B0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower C0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower D0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower E0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower F0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower G0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower H0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower I0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower J0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower K0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed2247

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,247
Open Space92
Podiums / Upper Parking Floor2,155
BuildingOpen SpacePodiums / Upper Parking FloorTotal
Tower A10294304
Tower B10290300
Tower C10286296
Tower D7134141
Tower E7132139
Tower F9271280
Tower G7130137
Tower H13132145
Tower I7130137
Tower J6176182
Tower K6180186

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area53,171 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI322509.97
Proposed, not sanctioned322,510 sq m
Buildings approved11
Buildings sanctioned11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 7,8,9 & 10, Empire Square, City Survey No. 4746, Next to Auto Cluster, Off Pune Mumbai Highway, Chinchwad, Pune, Maharashtra - 411019
Estimated costRs 2,152.90 cr
Cost incurredRs 3.03 cr
Work done0.14%
BuildingWingEstimatedIncurred
Tower ANARs 240.34 crRs 12.87 lakh
Tower BNARs 231.55 crRs 11.62 lakh
Tower CNARs 228.34 crRs 11.62 lakh
Tower FNARs 216.25 crRs 41.86 lakh
Tower KNARs 191.94 crRs 8.45 lakh
Tower JNARs 179.75 crRs 9.51 lakh
Tower DNARs 173.73 crRs 82.97 lakh
Tower INARs 163.73 crRs 8.45 lakh
Tower HNARs 163.73 crRs 8.45 lakh
Tower ENARs 163.68 crRs 61.32 lakh
Tower GNARs 161.23 crRs 45.42 lakh
-NARs 38.64 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA Consortium Pvt. Ltd.
EngineerMangesh Avinash Lawand
Chartered AccountantOmkar Deshpande
PartnerRole in project
Manjari Housing Projects LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603684Manish GhoshiManjari Housing Projects LLP14/06/2026
CC12604093Nikita Khivasara JainManjari Housing Projects LLP30/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 16 Aug 2032

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: UK-3 Rera Architect Certificate (14-04-2026).pdf24 Apr 2026
Withdrawal Update Form 1File: UK-3 Rera Architect Certificate (14-04-2026).pdf24 Apr 2026
Withdrawal Update Form 2File: Signed Engg GODREJ INARA.PDF24 Apr 2026
Withdrawal Update Form 2File: Signed Engg GODREJ INARA.PDF24 Apr 2026
Withdrawal Update Form 3File: MDD_RERA Godrej Ivara_March_2026_Signed.pdf24 Apr 2026
Withdrawal Update Form 3File: MDD_RERA Godrej Ivara_March_2026_Signed.pdf24 Apr 2026
Declaration and undertaking (Annexure A)File: 36 Declaration Cum Undertaking Annexure A R26.pdf16 Feb 2026
Layout approvalFile: LAYOUT Final with marking A.pdf16 Feb 2026
Building plan approvalFile: 1.pdf16 Feb 2026
Building plan approvalFile: 2.pdf16 Feb 2026
Building plan approvalFile: 3.pdf16 Feb 2026
Building plan approvalFile: 4.pdf16 Feb 2026
Building plan approvalFile: 5.pdf16 Feb 2026
Building plan approvalFile: 6.pdf16 Feb 2026
Building plan approvalFile: 7.pdf16 Feb 2026
Building plan approvalFile: 8.pdf16 Feb 2026
Building plan approvalFile: 9.pdf16 Feb 2026
Building plan approvalFile: 10.pdf16 Feb 2026
Building plan approvalFile: 11.pdf16 Feb 2026
Building plan approvalFile: 12.pdf16 Feb 2026
Building plan approvalFile: 13.pdf16 Feb 2026
Building plan approvalFile: 14.pdf16 Feb 2026
Building plan approvalFile: 15.pdf16 Feb 2026
Building plan approvalFile: 16.pdf16 Feb 2026
Building plan approvalFile: 17(a).pdf16 Feb 2026
Building plan approvalFile: 18.pdf16 Feb 2026
Building plan approvalFile: 19.pdf16 Feb 2026
Building plan approvalFile: 20.pdf16 Feb 2026
Building plan approvalFile: 21.pdf16 Feb 2026
Building plan approvalFile: 22.pdf16 Feb 2026
Building plan approvalFile: 23.pdf16 Feb 2026
Building plan approvalFile: 24.pdf16 Feb 2026
Building plan approvalFile: 25.pdf16 Feb 2026
Building plan approvalFile: 26.pdf16 Feb 2026
Building plan approvalFile: 27.pdf16 Feb 2026
Building plan approvalFile: 28.pdf16 Feb 2026
Building plan approvalFile: 29.pdf16 Feb 2026
Building plan approvalFile: 30.pdf16 Feb 2026
Building plan approvalFile: 31.pdf16 Feb 2026
Building plan approvalFile: 32.pdf16 Feb 2026
Building plan approvalFile: 33.pdf16 Feb 2026
Building plan approvalFile: 34.pdf16 Feb 2026
Building plan approvalFile: 35.pdf16 Feb 2026
Building plan approvalFile: 36.pdf16 Feb 2026
Building plan approvalFile: 37.pdf16 Feb 2026
Building plan approvalFile: 38.pdf16 Feb 2026
Building plan approvalFile: 39.pdf16 Feb 2026
Building plan approvalFile: 40.pdf16 Feb 2026
Building plan approvalFile: 41.pdf16 Feb 2026
Building plan approvalFile: 42.pdf16 Feb 2026
Building plan approvalFile: 43.pdf16 Feb 2026
Building plan approvalFile: 44.pdf16 Feb 2026
Building plan approvalFile: 45.pdf16 Feb 2026
Building plan approvalFile: 46.pdf16 Feb 2026
Building plan approvalFile: 47.pdf16 Feb 2026
Building plan approvalFile: 48.pdf16 Feb 2026
Building plan approvalFile: 49.pdf16 Feb 2026
Building plan approvalFile: 50.pdf16 Feb 2026
Building plan approvalFile: 62.pdf16 Feb 2026
Building plan approvalFile: 61.pdf16 Feb 2026
Building plan approvalFile: 51.pdf16 Feb 2026
Building plan approvalFile: 60.pdf16 Feb 2026
Building plan approvalFile: 52.pdf16 Feb 2026
Building plan approvalFile: 59.pdf16 Feb 2026
Building plan approvalFile: 58.pdf16 Feb 2026
Building plan approvalFile: 53.pdf16 Feb 2026
Building plan approvalFile: 57.pdf16 Feb 2026
Building plan approvalFile: 54.pdf16 Feb 2026
Building plan approvalFile: 56.pdf16 Feb 2026
Building plan approvalFile: 55.pdf16 Feb 2026

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Godrej Park SpringsP52100026739Manjri Khurd, Pune752Oct 2020OngoingSep 2029Registered original: Mar 2025Not due yet
Godrej ParkridgeP52100028310Manjari Kh, Pune674Feb 2021CompletedSep 2025Sep 2025

How this compares with Pune

11%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Ivara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmGodrej IvaraCompleted 11Lapsed / revoked 4Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Manjari Housing Projects LLP

Manjari Housing Projects LLP has 9 registrations on MahaRERA, including GODREJ BOULEVARD and Godrej Park Springs. Its filings disclose 7 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Ivara is delayed beyond 16 Aug 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Ivara?

The registered promoter entity is Manjari Housing Projects LLP, a limited liability partnership as per the filing. Its LLPIN AAJ-2162 and GSTIN 27AARFG0014F1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Ivara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Ivara?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Ivara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Ivara?

The professionals named in the filing: Architect: ANA Consortium Pvt. Ltd.; Engineer: Mangesh Avinash Lawand; Chartered Accountant: Omkar Deshpande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Ivara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Ivara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Ivara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.