Registered No litigation declared Residential / Group Housing project

Life Republic Sector R1 - 1st Avenue

By KOLTE-PATIL DEVELOPERS LIMITED

RG-MH-10174 · RERA P52100002646 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 63 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
83 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 95%
2 of 1,226Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Life Republic Sector R1 - 1st Avenue is a Residential / Group Housing project by KOLTE-PATIL DEVELOPERS LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100002646 on 2 Aug 2017. Possession is promised by 30 Dec 2027. 1,224 of the 1,226 units on this registration are recorded sold or booked, and 83 of 99 construction stages are filed complete.

At a glance

Project

  • NameLife Republic Sector R1 - 1st Avenue
  • TypeResidential / Group Housing
  • Location
    • Pune
    • Marunji
    • Mulshi
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002646
  • ReraGenie IDRG-MH-10174

Builder

  • NameKOLTE-PATIL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200PN1991PLC129428
  • GSTIN27AAACK7310G1ZT
  • DirectorYashvardhan Patil
  • Other registrations63 more →
  • Completed14 of 64
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredAug 2017PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2017
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings9 building records
  • Documents filed129 files

Current status

100%1224 of 1,226 units booked
90.4%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA23231760176
BNA23231760176
CNA24241730173
DNA23231730173
ENA23231760176
FNA23231760176
GNA23231760176
Parking 1NA11000
Parking 2NA44000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

83 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 95%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Parking 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Parking 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed1321

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,321
Closed/Covered1,177
Open Space144
BuildingClosed/CoveredOpen SpaceTotal
A342054
B342054
C15422176
D342054
E272047
F272148
G272148
Parking 147047
Parking 27930793

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area43,543 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority, Pune
Permissible FSI115132.93
Proposed, not sanctioned115,133 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 425.19 cr
Cost incurredRs 384.29 cr
Work done90.38%
BuildingWingEstimatedIncurred
-NARs 118.99 crRs 115.34 cr
CNARs 47.96 crRs 31.63 cr
DNARs 47.96 crRs 31.50 cr
BNARs 45.74 crRs 38.26 cr
ANARs 43.57 crRs 46.10 cr
ENARs 42.33 crRs 42.33 cr
FNARs 40.25 crRs 40.25 cr
GNARs 38.39 crRs 38.89 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGNERS’ SYNDICATE
EngineerJW Consultants LLP
EngineerGaurag Joshi
EngineerSanjay Suryawanshi
Chartered AccountantVIDHI S SHAH & ASSOCIATES
PartnerRole in project
KOLTE-PATIL DEVELOPERS LIMITED-

Litigation declared14

CaseCourtStatus
SPL CS No 265/2013/2013CJJDThe matter is pending adjudication and is pending at evidence stage
RCS No 1487/2005/2005CJJDThe matter is pending adjudication and is currently fixed for evidence
SPL CS 2255/2009/2009CJSDThe matter is pending adjudication and is currently fixed for framing additional issues
SPL CS 575/2015/2015CJSDdisposed off
SLP CC No 9467/2017/2017Supreme Courtdisposed off
SLP C CC No 9463/2017/2017Supreme Courtdisposed off
421/2016/2016CJSD PuneCurrently the suit is pending for withdrawal or dismissal The plaintiff has filed withdrawal purshis
11697/2017/2017High CourtCurrently the matter is pending for admission
11701/2017/2017High CourtCurrently the matter is pending for admission
11702/2017/2017High CourtCurrently the matter is pending for admission
WPST 31252/2017/2017High CourtThe matter is yet to come up for hearing before court Current stage is pre admission for circulation
RCS 1689/2021/2021CJJDCurrently the matter is posted for filing of written statement
Civil MA 372/2022/2022CJSD PuneAppearance and Filing of Say
7264/2022Bombay High CourtAdmission

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2021

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 R1.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 R1.pdf21 Apr 2026
Withdrawal Update Form 3File: Signed form 3 R1.pdf21 Apr 2026
Withdrawal Update Form 1File: 251231_ Details_Life Republic_R1_Building C D.pdf31 Jan 2026
Withdrawal Update Form 1File: 251231_ Details_Life Republic_R1_Building C D.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 R1.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 R1.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 R1.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3 R1.pdf31 Jan 2026
Withdrawal Update Form 1File: 250630_ Details_Life Republic_R1_Building C D.pdf26 Nov 2025
Withdrawal Update Form 2File: Form-2 R1.pdf26 Nov 2025
Withdrawal Update Form 3File: R1.pdf26 Nov 2025
Certificates of CA (Form 3)File: Form-3 LR R1.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 LR R1.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 250331_ Details_Life Republic_R1_Building C D.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 241231_ Details_Life Republic_R1_Building C D.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form-3 LR R1.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-LR R1.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form-3 R1.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 R1.pdf17 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 240930_ Details_Life Republic_R1_Building C D.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R1.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 240630_ Details_Life Republic_R1_Building C D.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R1 signed Form-2.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form-3 LR R1_compressed.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Final Signed FORM-2 R1 Q4 FY24.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 - R1.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 240331_ Details_Life Republic_R1_Building C D.pdf17 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R1-1st Avenue Form 2.pdf19 Jan 2024
Certificates of CA (Form 3)File: R1-1st Avenue Form-3.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R1_Building C D.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sector R1-1st Avenue.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA R1_compressed.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R1.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LR R1.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Life Republic Sector R1 - 1st Avenue.pdf20 Jul 2023
Certificates of CA (Form 3)File: LR R1_compressed.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LR R1.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LR R1.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R1.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: R1 1st Avenue Final Inv Dec.pdf20 Apr 2023
Certificates of CA (Form 3)File: R1 form3 signed_compressed1.pdf20 Apr 2023
CERSAI detailsFile: Cersai File.pdf15 Apr 2023
Proforma of Agreement for saleFile: LR R1 A and G Building AFS.pdf28 Feb 2023
Proforma of Agreement for saleFile: LR R1 C and D Building AFS.pdf28 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LR R1 Form 2.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Final 1st Avenue.pdf20 Jan 2023
Certificates of CA (Form 3)File: CA R1.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cer LR R1.pdf19 Jan 2023
CERSAI detailsFile: Final Cersai File.pdf16 Jan 2023
Details of encumbrancesFile: Encumbrances R1.pdf31 Dec 2022
Disclosure of sold/ booked inventoryFile: LR R1 1st Avenue.pdf20 Oct 2022
Certificates of CA (Form 3)File: LR Form 3_R1.pdf20 Oct 2022
CERSAI detailsFile: Cersai Report.pdf18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LR SECTOR R 1.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: R1 1st Avenue.pdf30 Sep 2022
Other - FinanceFile: R1 1st Avenue.pdf29 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch - R1.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: R 1.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration R1 1Avenue.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA - R1_compressed.pdf7 Jul 2022
CERSAI detailsFile: KPIT Cersai details.pdf4 Jul 2022
Proforma of Allotment letterFile: AFS LR-R1_compressed.pdf30 Jun 2022
Disclosure of sold/ booked inventoryFile: R1 1st Avenue.pdf18 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2_LR R1.pdf12 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_LR R1.pdf7 Apr 2022
CERSAI detailsFile: KPIT Cersai.pdf6 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Sector R1 Society Registration Certificate dtd 27_1_2022.pdf14 Feb 2022
Proforma of Allotment letterFile: LR-R1 AFS- balance buildings-Title report handover clause (1).pdf10 Feb 2022
Proforma of Allotment letterFile: LR-R1 AFS- balance buildings-Title report handover clause (1).pdf10 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certiifcate R1 1Avenue.pdf20 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARCHITECTS CERTIFICATE JAMBE SECTOR-R-1.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: LR R 1 A to G BUILDING-compressed.pdf12 Jan 2022
CERSAI detailsFile: KPIT Cersai details.pdf7 Jan 2022
Certificates of CA (Form 3)File: R1 1ST AVENUE Compressed-compressed.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Declaration sold unsold inventory R1-compressed.pdf8 Dec 2021
Proforma of Allotment letterFile: 15-11-2021-FINAL-LR-R1-draft-AFS.pdf18 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SECTOR-R-1,A, G BLDG,COMPLETION CERTIFICATE.PDF12 Nov 2021
Proforma of Allotment letterFile: AFS R16.pdf28 Oct 2021
Disclosure of sold/ booked inventoryFile: R1 invent decla-compressed.pdf21 Oct 2021

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EVARAP51800026949Borivali, Mumbai Suburban-Nov 2020CompletedOct 2024Oct 2024
24K Stargaze - J BuildingP52100027791Bavdhan, Pune-Jan 2021CompletedJun 2024Jun 2024
Western AvenueP52100000917Wakad, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Jan 2023
24K StargazeP52100018473Bavdhan, Pune-Nov 2018CompletedMar 2023Mar 2023
Redevelopment of Jai Vijay CHSL - Phase IP51800004446Vile-Parle (East), Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Sep 2019Sep 2022
24K ATRIAP52100000428Vishal Nagar, Pimple Nilakh, Pune-Jul 2017CompletedDec 2021Dec 2021
STARGAZEP52100009722Bavadhan BK, Pune-Aug 2017CompletedDec 2018Dec 2018
Ivy Estate Umang PremierP52100000655WAGHOLI, Pune-Jul 2017CompletedSep 2018Sep 2018
GLITTERATIP52100006257Pimpri Chinchawad (M Corp.), Pune-Aug 2017CompletedJun 2018Jun 2018
GLITTERATI IIP52100000319Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedApr 2018Registered original: Dec 2017Apr 2018
Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272Andheri, Mumbai Suburban-Aug 2017CompletedMar 2018Registered original: Dec 2017Mar 2018
GlitteratiPimple Nilakh Pune - 411014187-CompletedApr 2016Apr 2016
City BayDhole-Patil road Pune-41100127-CompletedApr 2014Apr 2014

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Life Republic Sector R1 - 1st Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmLife Republic Sector R1 Completed 9Lapsed / revoked 9Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: KOLTE-PATIL DEVELOPERS LIMITED

KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Life Republic Sector R1 - 1st Avenue is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Life Republic Sector R1 - 1st Avenue?

The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Life Republic Sector R1 - 1st Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Life Republic Sector R1 - 1st Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Life Republic Sector R1 - 1st Avenue?

The professionals named in the filing: Architect: SPACE DESIGNERS’ SYNDICATE; Engineer: JW Consultants LLP; Engineer: Gaurag Joshi; Engineer: Sanjay Suryawanshi; Chartered Accountant: VIDHI S SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life Republic Sector R1 - 1st Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life Republic Sector R1 - 1st Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life Republic Sector R1 - 1st Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.