Registered No litigation declared Residential / Group Housing project

Kohinoor Avantara

By Intofinity Promoters Private Limited

RG-MH-85437 · RERA PR1260002501984 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2032Possession promisedno revision filed
0 of 94Construction stages doneacross 10 buildings; furthest along: Excavation, 0%
1,373 of 1,373Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Kohinoor Avantara is a Residential / Group Housing project by Intofinity Promoters Private Limited in Pune, Maharashtra, registered with MahaRERA as PR1260002501984 on 2 Jan 2026. Possession is promised by 31 Mar 2032. 0 of the 1,373 units on this registration are recorded sold or booked, and 0 of 94 construction stages are filed complete.

At a glance

Project

  • NameKohinoor Avantara
  • TypeResidential / Group Housing
  • Location
    • Tathawade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002501984
  • ReraGenie IDRG-MH-85437

Builder

  • NameIntofinity Promoters Private Limited
  • Entity typeCompany
  • CINU45201PN2021PTC205973
  • GSTIN27AAGCI4003C1Z5
  • DirectorsVineet Krishnakumar Goyal, Rajesh Krishnakumar Goyal
  • Other registrations10 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredJan 2026PromisedMar 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Jan 2026
  • Promised completion31 Mar 2032
  • Revised completionNone
  • Buildings10 building records
  • Documents filed90 files

Current status

0%0 of 1,373 units booked

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ENA27262040204
Tower FNA27262040204
Tower GNA28271920192
Commercial BuildingNA3307272
Inclusive HousingNA191788088
Tower ANA27201540154
Tower BNA121165065
Tower CNA272652052
Tower DNA28271880188
Tower HNA26201540154

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 94 construction stages are filed complete across 10 buildings. The stage furthest along is Excavation, at 0%.

Tower E0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower F0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower G0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Building0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Inclusive Housing0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower B0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower C0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower D0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2894

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,894
Stilt / Ground1,369
Podiums / Upper Parking Floor1,444
Basement81
BuildingStilt / GroundPodiums / Upper Parking FloorBasementTotal
Tower E276500326
Tower F3051150420
Tower G2631720435
Commercial Building32800328
Inclusive Housing57081138
Tower A202270247
Tower B301790209
Tower C461120158
Tower D243620386
Tower H202270247

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area35,067 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Dec 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI131775.85
Proposed, not sanctioned131,767 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No.23,Goodwill House, opp Audi Showroom,Senapati Bapat Rd, Pune.411016.411016

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerPravin Khode
Chartered AccountantN B Sayed & Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
Intofinity Promoters Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2032

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Layout Plan (1).pdf7 Jul 2026
Building plan approvalFile: 02-50.pdf3 Jul 2026
Building plan approvalFile: 03-50.pdf3 Jul 2026
Building plan approvalFile: 04-50.pdf3 Jul 2026
Building plan approvalFile: 05-50 TOWER A.pdf3 Jul 2026
Building plan approvalFile: 06-50 TOWER A.pdf3 Jul 2026
Building plan approvalFile: 07-50 TOWER A.pdf3 Jul 2026
Building plan approvalFile: 08-50 TOWER A.pdf3 Jul 2026
Building plan approvalFile: 09-50 TOWER A.pdf3 Jul 2026
Building plan approvalFile: 10-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 11-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 12-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 12-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 13-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 14-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 14-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 15-50 TOWER B.pdf3 Jul 2026
Building plan approvalFile: 19-50 TOWER D.pdf3 Jul 2026
Building plan approvalFile: 20-50 TOWER D.pdf3 Jul 2026
Building plan approvalFile: 21-50 TOWER D.pdf3 Jul 2026
Building plan approvalFile: 22-50 TOWER D.pdf3 Jul 2026
Building plan approvalFile: 23-50 TOWER D.pdf3 Jul 2026
Building plan approvalFile: 42-50 MHADA.pdf3 Jul 2026
Building plan approvalFile: 43-50 MHADA.pdf3 Jul 2026
Building plan approvalFile: 44-50 MHADA.pdf3 Jul 2026
Building plan approvalFile: 45-50 MHADA.pdf3 Jul 2026
Building plan approvalFile: 46-50 MHADA.pdf3 Jul 2026
Building plan approvalFile: 47-50 MHADA.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 - Kohinoor Avantara.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 02_Avantara.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 03_Avantara.pdf20 Apr 2026
Building plan approvalFile: 22-40.pdf4 Apr 2026
Building plan approvalFile: 23-40.pdf4 Apr 2026
Building plan approvalFile: 24-40.pdf4 Apr 2026
Building plan approvalFile: 25-40.pdf4 Apr 2026
Building plan approvalFile: 26-40.pdf4 Apr 2026
Building plan approvalFile: 27-40.pdf4 Apr 2026
Building plan approvalFile: 28-40.pdf4 Apr 2026
Building plan approvalFile: 29-40.pdf4 Apr 2026
Building plan approvalFile: 30-40.pdf4 Apr 2026
Building plan approvalFile: 31-40.pdf4 Apr 2026
Building plan approvalFile: 32-40.pdf4 Apr 2026
Building plan approvalFile: 33-40.pdf4 Apr 2026
Building plan approvalFile: 34-40.pdf4 Apr 2026
Building plan approvalFile: 35-40.pdf4 Apr 2026
Building plan approvalFile: 36-40.pdf4 Apr 2026
Building plan approvalFile: 37-40.pdf4 Apr 2026
Building plan approvalFile: 38-40.pdf4 Apr 2026
Building plan approvalFile: 39-40.pdf4 Apr 2026
Building plan approvalFile: 40-40.pdf4 Apr 2026
Layout approvalFile: 01-40.pdf3 Apr 2026
Building plan approvalFile: 02-40.pdf3 Apr 2026
Building plan approvalFile: 03-40.pdf3 Apr 2026
Building plan approvalFile: 04-40.pdf3 Apr 2026
Building plan approvalFile: 05-40.pdf3 Apr 2026
Building plan approvalFile: 06-40.pdf3 Apr 2026
Building plan approvalFile: 07-40.pdf3 Apr 2026
Building plan approvalFile: 08-40.pdf3 Apr 2026
Building plan approvalFile: 09-40.pdf3 Apr 2026
Building plan approvalFile: 10-40.pdf3 Apr 2026
Building plan approvalFile: 11-40.pdf3 Apr 2026
Building plan approvalFile: 12-40.pdf3 Apr 2026
Building plan approvalFile: 13-40.pdf3 Apr 2026
Building plan approvalFile: 14-40.pdf3 Apr 2026
Building plan approvalFile: 15-40.pdf3 Apr 2026
Building plan approvalFile: 16-40.pdf3 Apr 2026
Building plan approvalFile: 17-40.pdf3 Apr 2026
Building plan approvalFile: 18-40.pdf3 Apr 2026
Building plan approvalFile: 19-40.pdf3 Apr 2026
Building plan approvalFile: 20-40.pdf3 Apr 2026
Building plan approvalFile: 21-40.pdf3 Apr 2026
Building plan approvalFile: Building Plan Approval -3_compressed.pdf19 Dec 2025
Building plan approvalFile: Building plan Approval -4 (4).pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -5 (3).pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -6_.pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -7.pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -8.pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -9_compressed.pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -10.pdf19 Dec 2025
Building plan approvalFile: Building Plan Approval -11.pdf19 Dec 2025

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Avantara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathwade13,700+ in Pune

2 kmKohinoor AvantaraCompleted 53Lapsed / revoked 28Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: Intofinity Promoters Private Limited

Intofinity Promoters Private Limited has 11 registrations on MahaRERA, including Kohinoor Kaleido and Kohinoor Central Park - Phase 1. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kohinoor Avantara is delayed beyond 31 Mar 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Avantara?

The registered promoter entity is Intofinity Promoters Private Limited, a company as per the filing. Its CIN U45201PN2021PTC205973 and GSTIN 27AAGCI4003C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Avantara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kohinoor Avantara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Avantara?

The professionals named in the filing: Architect: VKa Architecture; Engineer: Pravin Khode; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Avantara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Avantara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Avantara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.