Godrej Park Greens

By Godrej Skyline Developers Limited

RG-MH-91178 · RERA P52100019639 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases
  • 59 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken
  • Rs 250.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 48 months from the original
51 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 98%
16 of 1,210Units unsoldnot recorded sold or booked
59Complaints at MahaRERAon this registration
Jump to the 167 documents Report an error

Godrej Park Greens is a Others project by Godrej Skyline Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100019639 on 20 Feb 2019. Possession is promised by 30 Mar 2028. The completion date has moved by 48 months from the original filing. 1,194 of the 1,210 units on this registration are recorded sold or booked, and 51 of 77 construction stages are filed complete. 59 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Park Greens
  • TypeOthers
  • Location
    • Service road to Pune Mumbai Expressway
    • Mamurdi
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019639
  • ReraGenie IDRG-MH-91178

Builder

  • NameGodrej Skyline Developers Limited
  • Entity typeCompany
  • DirectorsAMANDEEP SINGH, Subhashish Jyotishchandra Pattanaik
  • Other registrations7 more →
  • Past their filed date3
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2019First promiseMar 2024Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Feb 2019
  • Promised completion30 Mar 2028
  • Revised completionRevised to 30 Mar 2028 (originally 30 Mar 2024)
  • Buildings7 building records
  • Documents filed167 files

Current status

99%1194 of 1,210 units booked
92.4%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER B1NA23221700170
TOWER B2NA23221700170
TOWER B3NA232217010180
TOWER B4NA232217010180
TOWER B5NA23221700170
TOWER B6NA23221710171
TOWER B7NA23221690169

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

51 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 98%.

TOWER B172%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks77%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.52%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
TOWER B268%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises62%
Sanitary Fittings within the flats / premises47%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.42%
TOWER B376%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.74%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
TOWER B491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER B591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER B690%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises94%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
TOWER B790%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes90%
Street LightingYes70%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes40%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed270

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots270
Closed/Covered259
Open Space11
BuildingClosed/CoveredOpen SpaceTotal
TOWER B144145
TOWER B244145
TOWER B321122
TOWER B421021
TOWER B544145
TOWER B644549
TOWER B741243

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area32,917 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 250.00 crore
CERSAI search filedYes
Declared on20 Sep 2024

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI66339.68
Proposed, not sanctioned66,098 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Ltd, Ground floor, Jehangir Building, MG Road, FOrt, Mumbai -01
Estimated costRs 306
Cost incurredRs 283
Work done92.4%
BuildingWingEstimatedIncurred
TOWER B3NARs 47Rs 36
TOWER B4NARs 43Rs 43
TOWER B7NARs 42Rs 38
TOWER B6NARs 41Rs 37
TOWER B2NARs 40Rs 39
TOWER B5NARs 40Rs 39
TOWER B1NARs 39Rs 39
-NARs 13Rs 12

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio 30 Architects and Planners
EngineerANIL POWAR
Chartered AccountantB S R & Co. LLP
Chartered AccountantM D Deshpande & Co.
PartnerRole in project
Godrej Skyline Developers Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019237Mar 2024 → Mar 2025

Reason as filed by the promoterIn light of the reasons mentioned in the application, developer seeks extension for the project Godrej Park Greens for a period of 12 months from 1st April 2024 to 30th March 2025

EXT52100027807Mar 2024 → Mar 2028

Reason as filed by the promoterWe are applying for the project extension for the reasons more particularly described in the uploaded application and declaration.

Litigation declared8

CaseCourtStatus
593/2023Joint CJSD AND Additional CJM PuneClosed
758/2023Joint CJSD AND Additional CJM PuneClosed
AT005000000144335/2023MahaREAT MumbaiPENDING
9 of 2022/2022MahaREAT MumbaiPENDING
479 /2022High Court of Judicature at BombayPENDING
22/223/2022District Consumer Dispute Redressal Commission PunePENDING
AT006000000134212/2022MahaREAT MumbaiPENDING
593/2023/2023Pune District and Sessions CourtClosed

Complaints filed with MahaRERA59

Case no.ComplainantRespondentFiled
CC005000000023263Ajit DabhadeGodrej Skyline Developers Pvt Ltd06/08/2019
CC005000000023059Savita BhorGodrej Central Park26/05/2019
CC005000000023371Manju SharmaM/S GODREJ PROPERTIES LIMITED28/08/2019
CC005000000053882MAHENDRA DNYANU WAGHMAREGODREJ SKYLINE DEVELOPERS PRIVATE LIMITED03/01/2020
CC005000000085250Joy SalveGodrej Skyline Developers Pvt Ltd24/02/2021
CC005000000095711Tarannum PathanGodrej Skyline Developers31/07/2021
CC005000000096284Pankaj Bhawarlal JainGodrej Skyline Developers Pvt. Ltd.01/12/2021
CC005000000471458Mangesh Prabhakar PhandGodrej Skyline Developers Private Limited08/08/2024
CC005000000471459Pradip Madan ManeGodrej Skyline Developers Private Limited08/08/2024
CC005000000471460Kavita Maruti SakundeGodrej Skyline Developers Private Limited08/08/2024
CC12400901Nikhilesh Sudhir MathurGodrej Skyline Developers Private Limited27/11/2024
CC12401168Rahul Pandurang ChoudhariGodrej Skyline Developers Private Limited18/12/2024
CC12502415VANDANA MAHENDRA GAIKWADGodrej Skyline Developers Private Limited16/07/2025
CC12503109Bhaskar Jyoti DuttaGodrej Skyline Developers Private Limited04/09/2025
CC12602017Deepak Baban ShindeGodrej Skyline Developers Private Limited05/04/2026
CC12503752Prakash Bandu KhudeGodrej Skyline Developers Private Limited27/10/2025
CC12602593Sanjeeth Kumar MandalGodrej Skyline Developers Private Limited04/05/2026
CC12501996Niranjan Anand BhosaleGodrej Skyline Developers Private Limited18/06/2025
CC12501099Rekha Subramani PandidharGodrej Skyline Developers Private Limited02/04/2025
CC12501371Tejashvi NivatkarGodrej Skyline Developers Private Limited25/04/2025
CC12602924Amit Amit RazdanGodrej Skyline Developers Private Limited18/05/2026
CC12501636Deepak Ashok SinghGodrej Skyline Developers Private Limited21/05/2025
CC12501922Sunil Sopan BaravkarGodrej Skyline Developers Private Limited12/06/2025
CC12502449Gajanan Shravan DatarGodrej Skyline Developers Private Limited18/07/2025
CC12501883GAURI MANISH PAGAREGodrej Skyline Developers Private Limited09/06/2025
CC12502147Naimish Sudhakar WatekarGodrej Skyline Developers Private Limited29/06/2025
CC12501898Nikhil Dilipkumar DeshmukhGodrej Skyline Developers Private Limited10/06/2025
CC12502032SUNIL KUMARGodrej Skyline Developers Private Limited21/06/2025
CC12502094Bidhovan Babu ChungathilGodrej Skyline Developers Private Limited26/06/2025
CC12502124Murtuza IndorewalaGodrej Skyline Developers Private Limited28/06/2025
CC12502264Rajesh Rambilas GoenkaGodrej Skyline Developers Private Limited05/07/2025
CC12502433Prakash Vishnu WadkarGodrej Skyline Developers Private Limited17/07/2025
CC12502768Mangesh Chandrakant MatheGodrej Skyline Developers Limited06/08/2025
CC12503402Brijesh YadavGodrej Skyline Developers Limited23/09/2025
CC12600198Deepak Shrirang GiteGodrej Skyline Developers Limited12/01/2026
CC12600320Rajdeep Anil AlawekarGodrej Skyline Developers Limited17/01/2026
CC12600328Vishwajit Jagannath GhatageGodrej Skyline Developers Limited17/01/2026
CC12600890YOGESH SHALIGRAM CHAUDHARIGodrej Skyline Developers Limited18/02/2026
CC12600894Sunil Soman PrambathGodrej Skyline Developers Limited18/02/2026
CC12601350Vijay M SheteGodrej Skyline Developers Limited11/03/2026
CC12602062CHETAN PRAMOD YEWALEGodrej Skyline Developers Limited08/04/2026
CC12601727Vishal Rao ChouhanGodrej Skyline Developers Limited25/03/2026
CC12601877VANDITA VISHAL MARATHEGodrej Skyline Developers Limited30/03/2026
CC12601842AKshay Vyankatrao DeshmukhGodrej Skyline Developers Limited29/03/2026
CC12602201Abhishek KondewarGodrej Skyline Developers Limited15/04/2026
CC12602242Arabinda PalaiGodrej Skyline Developers Limited16/04/2026
CC12602397Sharmila Sunil Kumara NaglikarGodrej Skyline Developers Limited24/04/2026
CC12602420RAHUL RAMKRISHNA JOSHIGodrej Skyline Developers Limited25/04/2026
CC12602646FARZAD HAMDULEGodrej Skyline Developers Limited07/05/2026
CC12602473Suchitra Suresh KoliGodrej Skyline Developers Limited27/04/2026
CC12602546Hitesh Ramesh PopliGodrej Skyline Developers Limited01/05/2026
CC12602558Amit Surendra VijGodrej Skyline Developers Limited01/05/2026
CC12602932Kiran Eknath SaidGodrej Skyline Developers Limited18/05/2026
CC12603088Sagar Shamrao PatilGodrej Skyline Developers Limited24/05/2026
CC12603123Umakant Virupax SwamiGodrej Skyline Developers Limited25/05/2026
CC12603479LALIT KUMARGodrej Skyline Developers Limited06/06/2026
CC12603410Sarika Ankush JadhavGodrej Skyline Developers Limited03/06/2026
CC12603548Sachin Shashikant NadkarniGodrej Skyline Developers Limited09/06/2026
CC12603558Rekha Arjun JagdaleGodrej Skyline Developers Limited09/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2028

Documents filed167

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Godrej Park Greens Q4FY26.pdf25 Apr 2026
Withdrawal Update Form 2File: Eng_Certificate_GPG Q4FY26.pdf25 Apr 2026
Withdrawal Update Form 3File: MDD_ RERA Certificate_Godrej Park Green_March_26_Signed.pdf25 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Godrej Park Greens Q3FY26.pdf24 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate GPG Q3FY26.pdf24 Jan 2026
Withdrawal Update Form 3File: RERA Certificate Godrej Park Green Dec 25 Signed.pdf24 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Godrej Park Greens Q2FY26.pdf20 Oct 2025
Withdrawal Update Form 2File: Engineers Certificare Godrej Park Green.pdf20 Oct 2025
Withdrawal Update Form 3File: RERA Certificate_Godrej Park Green Sep25.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Park Greens Form5_compressed.pdf26 Sep 2025
Layout approvalFile: North Sanction Layout_compressed.pdf17 Sep 2025
Layout approvalFile: North Sanction Layout_compressed.pdf17 Sep 2025
Form 1File: Architect Certificate Godrej Park Greens signed.pdf20 Jul 2025
Form 2File: Annexure B Godrej Park Greens-compressed.pdf20 Jul 2025
Form 3File: CA Certificate Godrej Park Green June 25 Signed.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Godrej Park Greens (2).pdf20 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GPG_compressed.pdf1 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Godrej Park Greens.pdf20 Apr 2025
Certificates of CA (Form 3)File: Godrej Park Green CA Cert.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Park greens.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Godrej Park Greens (1).pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate GPG.pdf20 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Godrej Park Greens.pdf8 Mar 2025
Certificates of CA (Form 3)File: Form 3 Certificate of CA Godrej Park Greens.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate on cost incurred on project Godrej Park Greens.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: Inv Disclosure GPG compressed.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate of Quality Assurance Godrej Park Greens.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Audit Report of Satutor CA Godrej Park Greens compressed.pdf8 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Godrej Park Greens.pdf20 Jan 2025
Certificates of CA (Form 3)File: Park Greens.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: G Park Green.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Park Greens (1).pdf20 Jan 2025
CERSAI detailsFile: CERSAI Latest.pdf21 Oct 2024
Certificates of CA (Form 3)File: Park Greens Form 3.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Godrej Park Greens.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej park Green.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Godrej Park Greens.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Godrej Park Greens.pdf15 Oct 2024
CERSAI detailsFile: CERSAI.pdf15 Oct 2024
PAN CardFile: Pan Card New.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Park Greens Form 5_compressed.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Park Greens.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Greens.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Godrej Park Greens.pdf16 Jul 2024
Certificates of CA (Form 3)File: MDD_GODREJ PARK GREEN_JUNE 24 Signed.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Park Greens March,2024.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificat Park Greens - March,2024.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Park Greens March,2024.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: April 24_Disclosure of Sold-Park Greens signed.pdf16 Apr 2024
Certificates of CA (Form 3)File: Godrej Park Greens_Mar_24_Signed.pdf16 Apr 2024
Declaration in FORM BFile: Form B_compressed.pdf9 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf9 Mar 2024
Disclosure of sold/ booked inventoryFile: GPG disclosure of inventory_compressed_11zon.pdf9 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Park Greens - Architect's Certificate.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Greens - Enggineer's Certificate.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Park Greens__Dec 23.pdf12 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293339474_For_Debtor_Based_Search_12_01_2024_11_56_49_022.pdf12 Jan 2024
Certificates of CA (Form 3)File: Godrej Park Green_Signed.pdf12 Jan 2024
Details of encumbrancesFile: Declaration _Godrej Park Greens.pdf20 Oct 2023
Details of encumbrancesFile: Encumbrance _Godrej Park Greens.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Park Green - Architects Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Green Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Park Greens Sept23.pdf19 Oct 2023
Certificates of CA (Form 3)File: MDD_ RERA Godrej Park Green_Signed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Skyline - Godrej Park Greens.pdf21 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Godrej Park Greens_7_11zon.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Park Greens.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Park Greens__Jul-23.pdf20 Jul 2023
Certificates of CA (Form 3)File: MDD_ RERA Godrej Park Green_June-23-Signed.pdf20 Jul 2023
Certificates of CA (Form 3)File: MDD_ RERA Godrej Park Green_OMD.PDF19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Godrej Park Greens.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Park Green.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assuarance Certificate Park Green.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: Park Greens - Disclosure of sold inventory.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_March19_.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_March19.pdf15 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_March20.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_March20.pdf15 Feb 2023
Certificates of CA (Form 3)File: Form3_March19.pdf15 Feb 2023
Certificates of CA (Form 3)File: Form3_March20.pdf15 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GODREJ PARK GREENSPUNE1,190CompletedMar 2023Mar 2023

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Park Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mamurdi13,700+ in Pune

2 kmGodrej Park GreensCompleted 41Lapsed / revoked 19Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: Godrej Skyline Developers Limited

Godrej Skyline Developers Limited has 8 registrations on MahaRERA, including Godrej Park Greens and Godrej Nurture. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Park Greens is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Park Greens?

The registered promoter entity is Godrej Skyline Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Park Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Park Greens?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Park Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Park Greens?

The professionals named in the filing: Architect: Studio 30 Architects and Planners; Engineer: ANIL POWAR; Chartered Accountant: B S R & Co. LLP; Chartered Accountant: M D Deshpande & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Park Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Park Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Park Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.