Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
66 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 95%
168 of 827Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 199 documents Report an error

Sukhwani Hermosa Casa is a Residential / Group Housing project by Sukhwani Associates in Pune, Maharashtra, registered with MahaRERA as P52100022474 on 25 Sep 2019. Possession is promised by 30 Dec 2027. 659 of the 827 units on this registration are recorded sold or booked, and 66 of 77 construction stages are filed complete.

At a glance

Project

  • NameSukhwani Hermosa Casa
  • TypeResidential / Group Housing
  • Location
    • Hadpasar Kharadi Bypass Road
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022474
  • ReraGenie IDRG-MH-13182

Builder

  • NameSukhwani Associates
  • Entity typePartnership
  • PartnerGurmukh Jangaldas Sukhwani
  • Authorised PartnerSagar Gurmukh Sukhwani
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2019PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Sep 2019
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed199 files

Current status

80%659 of 827 units booked
86.0%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - ProposedNA331280128
B - SanctionedNA19191280128
G - Part MHADANA18181200120
C - SanctionedNA19191280128
D - SanctionNA19191280128
E - SanctionedNA18181200120
F - SanctionedNA181875075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 95%.

A - Proposed9%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B - Sanctioned100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G - Part MHADA100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C - Sanctioned100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D - Sanction100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E - Sanctioned100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F - Sanctioned100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed733

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots733
Closed/Covered733
BuildingClosed/CoveredTotal
A - Proposed130130
B - Sanctioned104104
G - Part MHADA7272
C - Sanctioned128128
D - Sanction104104
E - Sanctioned120120
F - Sanctioned7575

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area22,440 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI73465.92
Proposed, not sanctioned58,549 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamla Crossroad Finolex Chowk A wing Opp PCMC Pimpri Pune 411017
Estimated costRs 214.89 cr
Cost incurredRs 184.88 cr
Work done86.03%
BuildingWingEstimatedIncurred
B - SanctionedNARs 32.62 crRs 32.62 cr
C - SanctionedNARs 32.62 crRs 32.62 cr
D - SanctionNARs 31.00 crRs 31.00 cr
A - ProposedNARs 30.01 cr-
E - SanctionedNARs 28.27 crRs 28.27 cr
G - Part MHADANARs 23.48 crRs 23.48 cr
F - SanctionedNARs 19.56 crRs 19.56 cr
-NARs 17.32 crRs 17.32 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates
EngineerShankar Desai
Chartered AccountantR V Nevatia & CO
Chartered AccountantA N J K & CO LLP
PartnerRole in project
Sukhwani Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jan 2025

Documents filed199

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 199 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2026 Hermosa Casa.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2026 Hermosa Casa.pdf24 Apr 2026
Withdrawal Update Form 3File: CA Certificate New Format Sukhwani Hermosa Casa March 2026 Final.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect CErtificate Hermosa Casa December 2025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Hermosa Casa December 2025 Final.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate New Format Sukhwani Hermosa Casa December 2025.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: CA Form 5_FY 2024-25_Hermosa Casa_Signed.pdf7 Nov 2025
Withdrawal Update Form 1File: Arch certficate ,Hermosa 02-10-2025.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate September 2025 signed.pdf28 Oct 2025
Withdrawal Update Form 3File: CA Certificate New Format Sukhwani Hermosa Casa September 2025 Signed.pdf28 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025 - Signed.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - June 2025 signed.pdf20 Jul 2025
Withdrawal Update Form 3File: CA Certificate New Format Sukhwani Hermosa Casa June 25 Signed.pdf20 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 Sukhwani Hermosa Casa.pdf27 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Part 4.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Hermosa Casa Sept 2024-Sign.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Hermosa Casa Sep 2024.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Sukhwani Hermosa Casa September 24- sign.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Hermosa Casa Sept 2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_11zon.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Hermosa Casa June 2024_11zon.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Sukhwani Hermosa Casa June 24 Signed_11zon.pdf13 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf11 Aug 2024
Building plan approvalFile: Building Plan 1_11zon.pdf26 Jul 2024
Building plan approvalFile: Building Plan 2_11zon.pdf26 Jul 2024
Building plan approvalFile: Building Plan 3_11zon.pdf26 Jul 2024
Building plan approvalFile: Building Plan 4_11zon.pdf26 Jul 2024
Building plan approvalFile: Building Plan 5_11zon.pdf26 Jul 2024
Layout approvalFile: Layout Approval_11zon.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout Approval_11zon.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_11zon.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_11zon.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3_11zon.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4_11zon.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 5_11zon.pdf26 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commenecement Certificate.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SA-Hermosa Casa-Form 2A-23-24.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Hermosa Casa March 2024_11zon.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-4-Form-1-Architect Certificate-Sukhwani Hermosa Casa.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-4-Form-2-Engineers'Certificate -Sukhwani Hermosa-Casa.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Sukhwani Hermosa Casa Signed_compressed.pdf7 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate Part 2.pdf20 Mar 2024
Layout approvalFile: Layout Approval_Highlighted.pdf23 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout Approval_Highlighted.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CA Certificate New Format Sukhwani Hermosa Casa Signed.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Hermosa Casa_11zon.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Sukhwani Hermosa Casa Signed.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Hermosa Casa - From-5 (FY 2022-23).pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Hermosa Casa_11zon.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2 - Form -1-Architect Certificate Sukhwani Hermosa Casa -_compressed.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2-Form-2-Engineer Certificate Sukhwani Hermosa Casa -.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-2 -Form -3-CA Certificate Sukhwani Hermosa Casa.pdf4 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Form-1-Hermosa-Casa.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 Form -2 Engineer's Certificate-Sukhwani Associates.pdf16 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inve Sukhwani Hermosa Casa.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Sukhwani Hermosa Casa.pdf16 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf3 Aug 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate - Hermosa Casa.pdf18 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 5 Commencement Certificates _ NA Order for plotted development.pdf10 Jul 2023
Layout approvalFile: Layout Approval_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- B Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- B Wing Part 2_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- C Wing Part 2_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- D Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E - Wing - Section AA_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E - Wing - Section AA_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 2_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- F Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 2_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 2_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- F Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- E Wing Part 1_11zon.pdf5 Jul 2023
Building plan approvalFile: Building Approval- C Wing Part 1_11zon.pdf5 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sukhwani CallistoS No 203 Wakad Pune173CompletedMar 2014Mar 2014

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sukhwani Hermosa Casa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhawa13,700+ in Pune

2 kmSukhwani Hermosa CasaCompleted 3Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: Sukhwani Associates

Sukhwani Associates has 4 registrations on MahaRERA, including The Villas and Sukhwani Hermosa Casa. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sukhwani Hermosa Casa is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sukhwani Hermosa Casa?

The registered promoter entity is Sukhwani Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sukhwani Hermosa Casa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sukhwani Hermosa Casa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sukhwani Hermosa Casa?

The professionals named in the filing: Architect: Ankur Associates; Engineer: Shankar Desai; Chartered Accountant: R V Nevatia & CO; Chartered Accountant: A N J K & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sukhwani Hermosa Casa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sukhwani Hermosa Casa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sukhwani Hermosa Casa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.