Puraniks Abitante Fiore, Phase 2A

By Puranik Buildcon Private Limited

RG-MH-04758 · RERA P52100020202 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 52 complaints at MahaRERA
  • Rs 344.00 crore secured on the land, in favour of KKR India Asset Finance Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
29 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 96%
114 of 896Units unsoldnot recorded sold or booked
52Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Puraniks Abitante Fiore, Phase 2A is a Residential / Group Housing project by Puranik Buildcon Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100020202 on 29 Mar 2019. Possession is promised by 30 Dec 2030. 782 of the 896 units on this registration are recorded sold or booked, and 29 of 44 construction stages are filed complete. 52 complaints are on record with the regulator.

At a glance

Project

  • NamePuraniks Abitante Fiore, Phase 2A
  • TypeResidential / Group Housing
  • Location
    • Bavadhan Bk Road
    • Near Puraniks Abitante Phase 1
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020202
  • ReraGenie IDRG-MH-04758

Builder

  • NamePuranik Buildcon Private Limited
  • Entity typeCompany
  • CINU45400MH2007PTC170399
  • GSTIN27AAECP2515N1Z8
  • DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik, Shailesh Gopal Puranik
  • Other registrations10 more →
  • Completed5 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2019PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Mar 2019
  • Promised completion30 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed121 files

Current status

87%782 of 896 units booked
67.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A -VerduraNA29262080208
B-PristinoNA29262080208
C-BellezzaNA35302400240
D-BrezzaNA35302400240

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 96%.

A -Verdura91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B-Pristino91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C-Bellezza70%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
D-Brezza66%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks81%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.57%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed460

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots460
Closed/Covered460
BuildingClosed/CoveredTotal
A -Verdura4545
B-Pristino4545
C-Bellezza175175
D-Brezza195195

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,090 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofKKR India Asset Finance Limited
Secured amountRs 344.00 crore
Declared on18 Nov 2025
LandownerVillageDistrict
Puranik Builders LimitedThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI42854.14
Proposed, not sanctioned42,854 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD GROUND FLOOR JEHANGIR BUILDING M G ROAD FORT MUMBAI MAHARASHTRA 400001
Estimated costRs 261.00 cr
Cost incurredRs 176.09 cr
Work done67.47%
BuildingWingEstimatedIncurred
A -VerduraNARs 52.20 crRs 35.22 cr
B-PristinoNARs 52.20 crRs 35.22 cr
C-BellezzaNARs 52.20 crRs 35.22 cr
D-BrezzaNARs 52.20 crRs 35.22 cr
-NARs 52.20 crRs 35.22 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpa Associates
EngineerPranil Deshpande
Chartered AccountantVMD and Company
Chartered AccountantVMD and Associates
Chartered AccountantVMD and Co.
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
Puranik Buildcon Private Limited-

Litigation declared4

CaseCourtStatus
SCS 663/2013Add Judge Small Cause CT and JD PuneOngoing
MA 100827/2015District Judge Addl Session Judge PuneOngoing
31/2022Tenth Joint CJST and ADDl CJM PuneOngoing
Spl. Case No. 663/2013Civil Judge Senior Division PuneOngoing

Complaints filed with MahaRERA52

Case no.ComplainantRespondentFiled
CC005000000064733Mrs Mugdha Rahul Puranik and Rahul Sudhakar PuranikM/s puranik Buildcom private ltd13/10/2020
CC005000000085340Ashish Shah & Bhavika ShahPurnaik Buildcon pvt ltd02/04/2021
CC005000000106835GAURAV SHRAVAN RASKARPuraniks Builder31/03/2022
CC005000000117067Santosh Malhari JawakPurankis Abitante Florie03/05/2022
CC005000000371031Parag Ramesh ShindeM/s Puranik Buildcon Private Limited Through its Authorized Signatory Yogesh Govind Puranik29/05/2024
CC005000000471354Mr. Anant Dhanraj BorseM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik20/07/2024
CC005000000471355Mr. Vikramsinh Jaysingrao BhosaleM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik20/07/2024
CC005000000471357Ashwini Anil PatilM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik20/07/2024
CC005000000471469Snehal Chandrakumar RamtekeM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik06/08/2024
CC005000000471490Ashish Sampat HandeM/s Puranik Buildcon Private Limited08/08/2024
CC005000000471499Shekhar Suresh BharekarM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik08/08/2024
CC005000000471438JAYSHREE PRAVIN POWARPURANIK BUILDCON PRIVATE LIMITED04/08/2024
CC005000000471505Vinayak Ashok SheteM/s Puranik Buildcon Private Limited Through its Authorized Signatory Mr. Yogesh Govind Puranik13/08/2024
CC12500311Chandrakant Sureshrao JadhavPuranik Buildcon Private Limited28/01/2025
CC12500365Mr Neeranjan Arun KumarPuranik Buildcon Private Limited03/02/2025
CC12500531Mr Rohan Dattaram KalapPuranik Buildcon Private Limited15/02/2025
CC12500532Mr Sandeep Vishwas MohitePuranik Buildcon Private Limited15/02/2025
CC12500533Mr Ramesh Nana PatilPuranik Buildcon Private Limited16/02/2025
CC12500541Shivraj Satish DeshmukhPuranik Buildcon Private Limited16/02/2025
CC12501671Akshay Kishor KshirsagarPuranik Buildcon Private Limited24/05/2025
CC12501917Arvind Sadashiv RamanePuranik Buildcon Private Limited11/06/2025
CC12501918Mr Vaibhav Tanaji PatilPuranik Buildcon Private Limited11/06/2025
CC12502030Sanket Vilas ShindePuranik Buildcon Private Limited21/06/2025
CC12502781Aditya Kiran RepekarPuranik Buildcon Private Limited07/08/2025
CC12502884Ketan Dattatray ErandePuranik Buildcon Private Limited17/08/2025
CC12502883Prajakta Jitendra NikamPuranik Buildcon Private Limited16/08/2025
CC12502885Anjanaben D DhinojaPuranik Buildcon Private Limited17/08/2025
CC12503072Shweta Satish ShendgePuranik Buildcon Private Limited01/09/2025
CC12503075Chandrashekhar Pramod GhodkePuranik Buildcon Private Limited01/09/2025
CC12503362Avinash KumarPuranik Buildcon Private Limited20/09/2025
CC12503246Pallavi ChauhanPuranik Buildcon Private Limited13/09/2025
CC12503281Bodhinee ShshikalaPuranik Buildcon Private Limited14/09/2025
CC12503561Vinod Anandrao SuvasePuranik Buildcon Private Limited07/10/2025
CC12503831Vipul Sudhir MogrePuranik Buildcon Private Limited01/11/2025
CC12602199ABHISHEK PandeyPuranik Buildcon Private Limited14/04/2026
CC12503918Santosh Ramchandra WaghmarePuranik Buildcon Private Limited08/11/2025
CC12600128Bipinchandra TotePuranik Buildcon Private Limited08/01/2026
CC12600766Aarti Ganpatrao ShindePuranik Buildcon Private Limited10/02/2026
CC12601088Prachi Sandeep PatilPuranik Buildcon Private Limited27/02/2026
CC12601091Savita Sudhir KadamPuranik Buildcon Private Limited27/02/2026
CC12601120Chetan Kaluram KokarePuranik Buildcon Private Limited01/03/2026
CC12601749Kishor Kantilal SatputePuranik Buildcon Private Limited26/03/2026
CC12602340SHRIRANG SUNIL KAMBLE ALIAS SANGAMNERKARPuranik Buildcon Private Limited21/04/2026
CC12602666Chandrashekhar Pramod GhodkePuranik Buildcon Private Limited08/05/2026
CC12603781Anand Chandrakant SonnaPuranik Buildcon Private Limited18/06/2026
CC12603816Bhausaheb Vilas TawadePuranik Buildcon Private Limited20/06/2026
CC12604100Sagar Shamsundar DeshpandePuranik Buildcon Private Limited01/07/2026
CC12604107Vinu RavindranPuranik Buildcon Private Limited01/07/2026
CC12604199KETAN MAHADEO BHUJBALPuranik Buildcon Private Limited04/07/2026
CC12604239Kirti Shailesh DawarePuranik Buildcon Private Limited06/07/2026
CC12604331ULHAS BALIRAM FEGADEPuranik Buildcon Private Limited10/07/2026
CC12604345ASHUTOSH VITHAL DHUTRAJPuranik Buildcon Private Limited11/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2030

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: New FORM 1 architect- Abitante Ph2A.pdf20 Apr 2026
Withdrawal Update Form 1File: New FORM 1 architect Abitante Ph2A.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Abitante Fiore Ph2A.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate_Abitante_2A - 30092025.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate_Abitante_2A - 30092025.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificates - Abitante - 2A.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificates_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Form 1File: New FORM 1 architect- Abitante Ph2A - A,B,C & D Bldg -30092025.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate_Abitante_2A - 30092025.pdf16 Nov 2025
Form 3File: CA Certificates - Abitante - 2A.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: Abitante II2A_.pdf16 Nov 2025
Form 5 (FY 2024-2025)File: Rera Form 5 - Abhitante 2A - sign date.pdf29 Sep 2025
Form 1File: New FORM 1 architect- Abitante Ph2A - A B C and D Bldg -30062025.pdf12 Aug 2025
Form 2File: Form 2 Engineers Certificate_Abitante_2A - 080825Sign.pdf12 Aug 2025
Form 3File: CA Certificates - Abitante - 2A 30062025.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory- Abitante 2A-ABCD.pdf12 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 Engineers Certificate_Abitante_2A - 31032025.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New FORM 1 architect- Abitante Ph2A.pdf20 Apr 2025
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 30092024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 31122024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Abitante Ph2A - 31122024.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 06-01-2025_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 30092024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 31122024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Abitante Ph2A - 31122024.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 06-01-2025_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Abitante Ph2A - 31122024.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 06-01-2025_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 30092024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante_2A - 31122024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante 2A.pdf20 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 300924.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante 2A.pdf20 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 300924.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante 2A.pdf20 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 300924.pdf20 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Abitante Fiore - Commencement Certificate 23082024.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 28082024 1.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puranik Abitante Fiore, Phase 2A - signed.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Abitante Fiore - Commencement Certificate 23082024.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 28082024 1.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puranik Abitante Fiore, Phase 2A - signed.pdf7 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Abitante - 2A 28082024 1.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Abitante Fiore - Commencement Certificate 23082024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puranik Abitante Fiore, Phase 2A - signed.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A-Abitante 2A _23-24.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Abitante 2A-A_compressed (2).pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Abitante-2A-A_compressed.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Abitante 2A-A_compressed (3).pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Abitante-2A-A_compressed (1).pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Abitante 2A-A,B,C,D_compressed.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante Fiore-2A - A B C D- P52100020202.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Abitante 2A 300624.pdf20 Jul 2024
Certificates of CA (Form 3)File: Abitante Fiore Phase 2A_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032024 Architects Certificate Abitante Ph2A.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Abitante 2A.pdf23 Apr 2024
Certificates of CA (Form 3)File: Aitante 2A_compressed.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New FORM 1 architect- Abitante Ph2A.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Abitante 2A 311223.pdf20 Jan 2024
Certificates of CA (Form 3)File: Abitante 2A_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante Ph2A - 30092023.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers CertificateAbitante 2A - 300923.pdf30 Oct 2023
Certificates of CA (Form 3)File: Abitante Ph 2A.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Abhitante 2A - sign.pdf30 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Abitante phase 2 CC 21082023.pdf23 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante Ph2A 30062023.pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Abitante 2A 30062023.pdf31 Jul 2023
Certificates of CA (Form 3)File: Abitante 2A 30062023.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Abitante 2A 22 23.PDF10 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abitante Ph2A - A B C D Bldg 31032023.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Abitante 2A 310323.pdf27 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - Abitante 2A 31032023.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Form 5 Puranik Abitante Phase 2A - sign.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: Abitante 2A.pdf25 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Abitante 2A 31122022.pdf9 Feb 2023
Certificates of CA (Form 3)File: Final CA Certificate Abitante-2A 31122022.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Abitante 2A.pdf16 Jan 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Aldea Espanola Phase IIIAldea Espanola Village Mahalunge Taluka Mulshi District Pune118CompletedDec 2015Late, Mar 2016
Aldea Espanola Phase IIAldea Espanola Village Mahalunge Taluka Mulshi District Pune188CompletedJun 2013Late, Mar 2014

How this compares with Pune

87%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Puraniks Abitante Fiore, Phase 2A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Puraniks Abitante Phase 113,700+ in Pune

2 kmPuraniks Abitante Fiore,Completed 26Lapsed / revoked 14Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: Puranik Buildcon Private Limited

Puranik Buildcon Private Limited has 11 registrations on MahaRERA, including Puraniks Abitante Phase 1A and Puraniks Abitante Phase 1B. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Puraniks Abitante Fiore, Phase 2A is delayed beyond 30 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Puraniks Abitante Fiore, Phase 2A?

The registered promoter entity is Puranik Buildcon Private Limited, a company as per the filing. Its CIN U45400MH2007PTC170399 and GSTIN 27AAECP2515N1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Puraniks Abitante Fiore, Phase 2A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Puraniks Abitante Fiore, Phase 2A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Puraniks Abitante Fiore, Phase 2A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Puraniks Abitante Fiore, Phase 2A?

The professionals named in the filing: Architect: Vastushilpa Associates; Engineer: Pranil Deshpande; Chartered Accountant: VMD and Company; Chartered Accountant: VMD and Associates; Chartered Accountant: VMD and Co.; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Puraniks Abitante Fiore, Phase 2A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Puraniks Abitante Fiore, Phase 2A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Puraniks Abitante Fiore, Phase 2A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.