Godrej Elaris
RG-MH-00118 · RERA PM1260002501385 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Elaris is a Mixed project by Godrej Properties Limited in Pune, Maharashtra, registered with MahaRERA as PM1260002501385 on 3 Nov 2025. Possession is promised by 16 May 2032. 275 of the 972 units on this registration are recorded sold or booked, and 0 of 80 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Elaris
- TypeMixed
- Location
- Mundhwa
- Mundhwa South
- Pune City
- Pune
- 411036
- Pincode411036
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1260002501385
- ReraGenie IDRG-MH-00118
Builder
- NameGodrej Properties Limited
- Entity typeCompany
- CINL74120MH1985PLC035308
- Executive ChairpersonPirojsha Godrej
- Managing DirectorGaurav Pandey
- DirectorNadir Godrej
- Independent DirectorsJayashree Vaidhyanathan, Indu Bhushan, Sutapa Banerjee, Sumeet Subhash Narang
- Other registrations27 more →
- Completed5 of 28
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects35 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Nov 2025
- Promised completion16 May 2032
- Revised completionNone
- Buildings8 building records
- Documents filed57 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 39 | 36 | 122 | 51 | 173 |
| Tower B | NA | 36 | 30 | 111 | 0 | 111 |
| Tower C | NA | 36 | 30 | 111 | 0 | 111 |
| Tower D | NA | 36 | 30 | 111 | 0 | 111 |
| Tower E | NA | 40 | 37 | 132 | 14 | 146 |
| Tower F | NA | 40 | 37 | 132 | 20 | 152 |
| Tower G | NA | 28 | 22 | 84 | 0 | 84 |
| Tower H | NA | 28 | 22 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 80 construction stages are filed complete across 8 buildings. The stage furthest along is Excavation, at 0%.
Tower A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower G0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower H0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | Not applicable |
Parking filed2772
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Podiums / Upper Parking Floor | Basement | Total |
|---|---|---|---|---|
| Tower A | 32 | 148 | 148 | 328 |
| Tower B | 29 | 135 | 134 | 298 |
| Tower C | 29 | 135 | 135 | 299 |
| Tower D | 29 | 135 | 135 | 299 |
| Tower E | 37 | 175 | 175 | 387 |
| Tower F | 37 | 175 | 175 | 387 |
| Tower G | 37 | 175 | 175 | 387 |
| Tower H | 37 | 175 | 175 | 387 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower E | NA | Rs 183.24 cr | - |
| Tower F | NA | Rs 145.96 cr | - |
| Tower B | NA | Rs 77.43 cr | - |
| Tower D | NA | Rs 77.40 cr | - |
| Tower C | NA | Rs 69.72 cr | - |
| Tower G | NA | Rs 62.67 cr | - |
| Tower H | NA | Rs 51.20 cr | - |
| - | NA | Rs 13.54 cr | Rs 40.46 lakh |
| Tower A | NA | Rs 7.99 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gaurav Sanan |
| Engineer | Samartha Constro Consultants LLP |
| Chartered Accountant | Omkar Deshpande |
| Partner | Role in project |
|---|---|
| Godrej Properties Limited | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| SCS no. 1809 of 2021/2021 | Civil Judge Senior Division | Ongoing |
| SCS no. 342 of 2021/2021 | Civil Judge Senior Division Pune | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600726 | Suraj Dilip Ghadge | Godrej Properties Limited | 08/02/2026 |
| CC12601010 | Dipali Keshav Varade | Godrej Properties Limited | 24/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 May 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 16 May 2032
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: LAYOUT with markings.pdf | 29 May 2026 |
| Building plan approvalFile: 2-4.pdf | 29 May 2026 |
| Building plan approvalFile: 5-7.pdf | 29 May 2026 |
| Building plan approvalFile: 8-10.pdf | 29 May 2026 |
| Building plan approvalFile: 11-12.pdf | 29 May 2026 |
| Building plan approvalFile: 13-14.pdf | 29 May 2026 |
| Building plan approvalFile: 15-16.pdf | 29 May 2026 |
| Building plan approvalFile: 17-19.pdf | 29 May 2026 |
| Building plan approvalFile: 20-23.pdf | 29 May 2026 |
| Building plan approvalFile: 24-26.pdf | 29 May 2026 |
| Building plan approvalFile: 27-29.pdf | 29 May 2026 |
| Building plan approvalFile: 30-32.pdf | 29 May 2026 |
| Building plan approvalFile: 33-35.pdf | 29 May 2026 |
| Building plan approvalFile: 36-39.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Mundhwa Elaris _RERA Architects Certificate.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate for Mundhwa March 26.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Signed MDD_Godrej Elaris_RERA_March_2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Elaris _RERA Architects Certificate.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: MDD_Godrej Elaris_RERA_December_2025_Signed.pdf | 2 Feb 2026 |
| Building plan approvalFile: 25-28 revised.pdf | 7 Jan 2026 |
| Building plan approvalFile: 2-5.pdf | 18 Dec 2025 |
| Building plan approvalFile: 6-9.pdf | 18 Dec 2025 |
| Building plan approvalFile: 10-12.pdf | 18 Dec 2025 |
| Building plan approvalFile: 13-14.pdf | 18 Dec 2025 |
| Building plan approvalFile: 15-16.pdf | 18 Dec 2025 |
| Building plan approvalFile: 17-20.pdf | 18 Dec 2025 |
| Building plan approvalFile: 21-24.pdf | 18 Dec 2025 |
| Building plan approvalFile: 29-32.pdf | 18 Dec 2025 |
| Building plan approvalFile: 33-37.pdf | 18 Dec 2025 |
| Building plan approvalFile: 38-41.pdf | 18 Dec 2025 |
| Building plan approvalFile: 42-43.pdf | 18 Dec 2025 |
| Layout approvalFile: 1.pdf | 18 Dec 2025 |
| Building plan approvalFile: 30 sheet.pdf | 29 Oct 2025 |
| Layout approvalFile: 10 Layout with Marking.pdf | 29 Oct 2025 |
| Declaration and undertaking (Annexure A)File: 36 Declaration Cum Undertaking Annexure A (1).pdf | 28 Oct 2025 |
| Building plan approvalFile: 4 (2)_rotated_compressed.pdf | 17 Oct 2025 |
| Building plan approvalFile: 5 (2)_rotated_compressed.pdf | 17 Oct 2025 |
| Building plan approvalFile: 6 (2)_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 7_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 8_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 9_rotated_compressed.pdf | 17 Oct 2025 |
| Building plan approvalFile: 10_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 11_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 12_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 13_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 14_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 15_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 16_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 17_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 18_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 19_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 20_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 21_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 22_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 23_rotated.pdf | 17 Oct 2025 |
| Building plan approvalFile: 24_rotated.pdf | 17 Oct 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Godrej SkylinePM1260002400007 | Mundhwa, Pune | 174 | Sep 2024 | Ongoing | Jul 2029 | Not due yet |
| The Trees Residential Phase 1 | 5, GODREJ ONE, EASTERN EXPRESS HIGHWAY, VIKHROLI EAST, PIROJSHANAGAR, Maharastra, 400079 | - | - | Completed | Jun 2021 | Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Godrej Elaris on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mundhwa South13,700+ in Pune
Filed coordinates, straight-line distance. 169 registered projects within 2 km.
Godrej Aqua Vista
Oxford Realty LLP
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Jhamtani BizCore
DUSK REALTY LLP
Builder: Godrej Properties Limited
Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Godrej Elaris is delayed beyond 16 May 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Elaris?
The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its CIN L74120MH1985PLC035308 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Elaris?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Elaris?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Godrej Elaris?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Elaris?
The professionals named in the filing: Architect: Gaurav Sanan; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: Omkar Deshpande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Elaris?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback