Home / Browse projects / Pune, Maharashtra / Kohinoor Central Park - Phase 1
Kohinoor Central Park - Phase 1
By INTOFINITY PROMOTERS PRIVATE LIMITED
RG-MH-05595 · RERA P52100056358 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kohinoor Central Park - Phase 1 is a Others project by INTOFINITY PROMOTERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100056358 on 29 May 2024. Possession is promised by 31 Dec 2028. 767 of the 1,095 units on this registration are recorded sold or booked, and 17 of 77 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameKohinoor Central Park - Phase 1
- TypeOthers
- Location
- Village Maan
- Man
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100056358
- ReraGenie IDRG-MH-05595
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings7 building records
- Documents filed169 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 1 | NA | 23 | 22 | 172 | 0 | 172 |
| TOWER 2 | NA | 23 | 22 | 172 | 0 | 172 |
| TOWER 3 | NA | 23 | 22 | 176 | 0 | 176 |
| TOWER 4 | NA | 23 | 22 | 173 | 0 | 173 |
| COMMERCIAL | NA | 1 | 1 | 0 | 56 | 56 |
| TOWER 5 | NA | 23 | 22 | 173 | 0 | 173 |
| TOWER 6 | NA | 23 | 22 | 173 | 0 | 173 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Stilt Floor, at 70%.
TOWER 125%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 228%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 329%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 429%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
COMMERCIAL0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 533%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 628%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 7% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1304
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| TOWER 1 | 216 | 0 | 216 |
| TOWER 2 | 207 | 9 | 216 |
| TOWER 3 | 205 | 0 | 205 |
| TOWER 4 | 172 | 22 | 194 |
| COMMERCIAL | 100 | 0 | 100 |
| TOWER 5 | 163 | 23 | 186 |
| TOWER 6 | 187 | 0 | 187 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| TITANIA INDUSTRIAL DEVELOPMENT LLP | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| COMMERCIAL | NA | Rs 36.74 cr | Rs 5.33 cr |
| TOWER 1 | NA | Rs 34.02 cr | Rs 5.33 cr |
| TOWER 2 | NA | Rs 34.02 cr | Rs 5.33 cr |
| TOWER 3 | NA | Rs 34.02 cr | Rs 5.33 cr |
| TOWER 4 | NA | Rs 34.02 cr | Rs 5.33 cr |
| TOWER 5 | NA | Rs 34.02 cr | Rs 5.33 cr |
| TOWER 6 | NA | Rs 34.02 cr | Rs 5.33 cr |
| - | NA | Rs 18.90 cr | Rs 99.29 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK a architecture |
| Engineer | Pravin Khode |
| Chartered Accountant | Bhandari S A A J & Associates |
| Chartered Accountant | Vinod N Nikam & Co |
| Chartered Accountant | SAC CO & LLP |
| Chartered Accountant | JAYESH N JAIN & ASSOCIATES |
| Chartered Accountant | Shah Khandelwal Jain & Associates |
| Chartered Accountant | KASHMIRA KUWAD & ASSOCIATES |
| Partner | Role in project |
|---|---|
| INTOFINITY PROMOTERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000471445 | Dimple Shah | Kohinoor Group | 03/08/2024 |
| CC12400350 | Sagar Bhausaheb Narode | INTOFINITY PROMOTERS PRIVATE LIMITED | 06/10/2024 |
| CC12400338 | Saransh Shrivastava | INTOFINITY PROMOTERS PRIVATE LIMITED | 05/10/2024 |
| CC12502044 | Madhumita Rao | INTOFINITY PROMOTERS PRIVATE LIMITED | 23/06/2025 |
| CC12603190 | INTOFINITY PROMOTERS PRIVATE LIMITED | RACHITA SINHA | 28/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed169
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 169 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1- Central park 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 02_KCP I.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 03 KCP I.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_CENTRAL PARK I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_KCP I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 03_KCP I.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5-Central Park PH I.pdf | 29 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A_Central Park Ph I.pdf | 15 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1- K CENTRAL I.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 02_Central Park Ph I.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3-Central Park PH I.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Central park 1.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: Form 02_Central Park I.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: FORM-03 Q1 FY 24-25 K CENTRAL.pdf | 5 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Central Park 1.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Central Park Ph 1.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_KCP PH I.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Central Park I.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Central Park I.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Central Park ph I.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Central park phase 1.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Central Park Form 3.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- KCP I.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- KCP PHASE 1.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kohinoor Central park - phase 1.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 Q1 FY 24-25 K CENTRAL.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 Q1 FY 24-25 CENTRAL PARK.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 K CENTRAL.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 K CENTRAL _.pdf | 20 Jul 2024 |
| Proforma of Agreement for saleFile: Updated - AFS_.pdf | 8 Jul 2024 |
| Layout approvalFile: 01-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 2-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 3-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 4-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 5-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 6-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 7-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 8-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 9-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 10-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 11-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 12-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 13-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 14-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 15-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 16-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 17-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 18-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 19-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 20-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 21-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 22-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 23-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 24-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 25-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 26-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 27-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 28-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 29-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 30-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 31-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 32-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 33-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 34-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 35-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 36-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 37-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 38-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 39-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 41-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 42A-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 43-44.pdf | 6 Jul 2024 |
| Building plan approvalFile: 44-44.pdf | 6 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 01-44.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-44.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-44.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-44.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-44.pdf | 6 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6-44.pdf | 6 Jul 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kohinoor Kaleido | New GAT No 1321 Hissa No 1 to 7 Wagholi Taluka Haveli Pune 412207 | 832 | Ongoing | Dec 2027 | Dec 2027 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 169 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kohinoor Central Park - Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Maan13,700+ in Pune
Filed coordinates, straight-line distance. 50 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: INTOFINITY PROMOTERS PRIVATE LIMITED
Intofinity Promoters Private Limited has 11 registrations on MahaRERA, including Kohinoor Kaleido and Kohinoor Central Park - Phase 1. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Kohinoor Central Park - Phase 1 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kohinoor Central Park - Phase 1?
The registered promoter entity is INTOFINITY PROMOTERS PRIVATE LIMITED, a company as per the filing. Its CIN U45201PN2021PTC205973 and GSTIN 27AAGCI4003C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kohinoor Central Park - Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kohinoor Central Park - Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kohinoor Central Park - Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kohinoor Central Park - Phase 1?
The professionals named in the filing: Architect: VK a architecture; Engineer: Pravin Khode; Chartered Accountant: Bhandari S A A J & Associates; Chartered Accountant: Vinod N Nikam & Co; Chartered Accountant: SAC CO & LLP; Chartered Accountant: JAYESH N JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kohinoor Central Park - Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback