Home / Browse projects / Pune, Maharashtra / NYATI EVANIA
NYATI EVANIA
By NYATI CONSTRUCTION PRIVATE LIMITED
RG-MH-23297 · RERA P52100078605 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 2 complaints at MahaRERA
- Rs 150.00 crore secured on the land, in favour of Aditya Birla Capital Limited
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI EVANIA is a Others project by NYATI CONSTRUCTION PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100078605 on 27 Dec 2024. Possession is promised by 30 Apr 2029. 77 of the 377 units on this registration are recorded sold or booked, and 1 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameNYATI EVANIA
- TypeOthers
- Location
- Sadashiv Peth
- Dandekar Bridge
- Parvati
- Haveli
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078605
- ReraGenie IDRG-MH-23297
Builder
- NameNYATI CONSTRUCTION PRIVATE LIMITED
- Entity typeCompany
- CINU45202MH1996PTC102517
- GSTIN27AAACN6421D1ZU
- DirectorsPRANAV NITIN NYATI, NITIN DWARKADAS NYATI
- Other registrations5 more →
- Completed2 of 6
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Dec 2024
- Promised completion30 Apr 2029
- Revised completionNone
- Buildings3 building records
- Documents filed101 files
Current status
Figures as on 28 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 36 | 25 | 150 | 0 | 150 |
| BUILDING B | NA | 36 | 25 | 150 | 0 | 150 |
| BUILDING A and B - COMMERCIAL | NA | 11 | 7 | 0 | 77 | 77 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 95%.
BUILDING A8%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING A and B - COMMERCIAL20%
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 85% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed2954
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 859 | 859 |
| BUILDING B | 860 | 860 |
| BUILDING A and B - COMMERCIAL | 1,235 | 1,235 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| M/S KEDAR VENTURES | Peth | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A and B - COMMERCIAL | NA | Rs 114.11 cr | Rs 39.60 cr |
| BUILDING A | NA | Rs 94.92 cr | Rs 65.49 lakh |
| BUILDING B | NA | Rs 94.92 cr | Rs 68.34 lakh |
| - | NA | Rs 64.45 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJEEV MUKUND MEHTA |
| Architect | SHIRISH DASNURKAR |
| Architect | OMKAR ASSOCIATES |
| Engineer | ACHYUT WATVE |
| Engineer | SANTOSH LIGADE |
| Engineer | Vishwanath Dhande |
| Chartered Accountant | Vipin Gujarathi & Associates |
| Chartered Accountant | NICKY HIRANAND MILANI |
| Partner | Role in project |
|---|---|
| NYATI CONSTRUCTION PRIVATE LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 11557/2024 | Bombay High Court | Closed |
| 117/2024 | NATIONAL GREEN TRIBUNAL WESTERN ZONE BENCH PUNE | Closed |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600181 | Ram Gawali | NYATI CONSTRUCTION PRIVATE LIMITED | 23/03/2026 |
| SM12600442 | Ram Gawali | NYATI CONSTRUCTION PRIVATE LIMITED | 29/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2029
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 28 Apr 2026 |
| Form 2A (FY 2025-2026)File: Nyati Evania Form 2A 2025-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Q3.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 29 Oct 2025 |
| Form 5 (FY 2024-2025)File: Nyati Evania - Consolidated DSC.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025)File: Nyati Evania Form 2A 2024-2025.pdf | 23 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Apr 2025 |
| Layout approvalFile: 01-Layout.pdf | 17 Mar 2025 |
| Building plan approvalFile: 02-Upper Ground Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 03 - Basement Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 04-Typical Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 07-Lower Ground Parking.pdf | 17 Mar 2025 |
| Building plan approvalFile: 08-Upper Ground Floor A B Wing.pdf | 17 Mar 2025 |
| Building plan approvalFile: 09-1st Floor A B Wing.pdf | 17 Mar 2025 |
| Building plan approvalFile: 10-2nd Floor Parking.pdf | 17 Mar 2025 |
| Building plan approvalFile: 11-3rd Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 12-Typical 4th 6th Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 13-5th Floor Refuge Floor.pdf | 17 Mar 2025 |
| Building plan approvalFile: 15-Typical 2 3 4.pdf | 17 Mar 2025 |
| Building plan approvalFile: 16-Typical 1 5 9.pdf | 17 Mar 2025 |
| Building plan approvalFile: 18-Typical 2 3 4 B Bldg.pdf | 17 Mar 2025 |
| Building plan approvalFile: 19-Typical 1 5 9 B Bldg.pdf | 17 Mar 2025 |
| Building plan approvalFile: 20-Terrace Floor B Bldg.pdf | 17 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: 01-Layout.pdf | 17 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 00-CC .pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 20-Terrace Floor B Bldg.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 19-Typical 1 5 9 B Bldg.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 18-Typical 2 3 4 B Bldg.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-Typical 1 5 9.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 15-Typical 2 3 4.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-5th Floor Refuge Floor.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-Typical 4th 6th Floor.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-3rd Floor.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-2nd Floor Parking.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 09-1st Floor A B Wing.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 08-Upper Ground Floor A B Wing.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-Lower Ground Parking.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04-Typical Floor.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03 - Basement Floor.pdf | 17 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-Upper Ground Floor.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Evania CA Certificate.pdf | 13 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Verification of CC.pdf | 13 Dec 2024 |
| Layout approvalFile: Sanction Layout.pdf | 26 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf | 26 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Revised.pdf | 26 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Revised.pdf | 26 Nov 2024 |
| Proforma of Agreement for saleFile: EVANIA UNIT AGR 081124.pdf | 8 Nov 2024 |
| Building plan approvalFile: 13.pdf | 4 Nov 2024 |
| Building plan approvalFile: 12.pdf | 4 Nov 2024 |
| Building plan approvalFile: 11.pdf | 4 Nov 2024 |
| Building plan approvalFile: 10.pdf | 4 Nov 2024 |
| Building plan approvalFile: 9.pdf | 4 Nov 2024 |
| Building plan approvalFile: 8.pdf | 4 Nov 2024 |
| Building plan approvalFile: 7.pdf | 4 Nov 2024 |
| Building plan approvalFile: 6.pdf | 4 Nov 2024 |
| Building plan approvalFile: 5.pdf | 4 Nov 2024 |
| Building plan approvalFile: 4.pdf | 4 Nov 2024 |
| Building plan approvalFile: 3.pdf | 4 Nov 2024 |
| Building plan approvalFile: 2.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 13.pdf | 4 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NYATI EVANIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dandekar Bridge13,700+ in Pune
Filed coordinates, straight-line distance. 274 registered projects within 2 km.
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
GSV Vertica
GSV Ventures
Builder: NYATI CONSTRUCTION PRIVATE LIMITED
NYATI CONSTRUCTION PRIVATE LIMITED has 6 registrations on MahaRERA, including NYATI ERA I and NYATI ERA II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NYATI EVANIA is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI EVANIA?
The registered promoter entity is NYATI CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102517 and GSTIN 27AAACN6421D1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI EVANIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NYATI EVANIA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NYATI EVANIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI EVANIA?
The professionals named in the filing: Architect: SANJEEV MUKUND MEHTA; Architect: SHIRISH DASNURKAR; Architect: OMKAR ASSOCIATES; Engineer: ACHYUT WATVE; Engineer: SANTOSH LIGADE; Engineer: Vishwanath Dhande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI EVANIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback