Registered No litigation declared Plotted project

Balaji Dham Phase-1

By Garva Land Deal Private Limited

RG-MH-24010 · RERA P52100011371 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 48 months from the original
404 of 1,261Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

Balaji Dham Phase-1 is a Plotted project by Garva Land Deal Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100011371 on 31 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 48 months from the original filing. 857 of the 1,261 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.

At a glance

Project

  • NameBalaji Dham Phase-1
  • TypePlotted
  • Location
    • Misalawadi road
    • Misalawadi
    • Misalawadi (nv)
    • Purandhar
    • Pune
    • 412205
  • Pincode412205
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100011371
  • ReraGenie IDRG-MH-24010

Builder

  • NameGarva Land Deal Private Limited
  • Entity typeCompany
  • Managing DirectorVikrant Dattatraya Shilimkar
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseMar 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Mar 2023)
  • BuildingsNot stated in filing
  • Documents filed125 files

Current status

68%857 of 1,261 units booked

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes45%
Street LightingYes25%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area311,501 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI161400.8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch93 Anand park, Rajyog Creations, off ITI road, Aundh, Pune 411007

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmarjeet Kudalkar
EngineerRajendra Chaudhari
EngineerSagar Mahesh Maral
PartnerRole in project
Garva Land Deal Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015055Mar 2023 → Mar 2024

Reason as filed by the promoterAs per the attached document

EXT52100019495Mar 2023 → Mar 2027

Reason as filed by the promoterAs per the attachment

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12504404Rajat Prem Lata Trivedi TrivediGarva Land Deal Private Limited10/12/2025
CC12601680Anant Padmanabh DatarGarva Land Deal Private Limited24/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Balaji Dham - March 26 (1).pdf23 Jun 2026
Form 2File: Form 2 - Engineer Certificate - Balaji Dham Phase I Final.pdf23 Jun 2026
Form 3File: Form 3 - Balaji Dham Phase I (1).pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Balaji Dham Phase I - March 26.pdf23 Jun 2026
Form 1File: Form 1 - Balaji Dham - Dec 25.pdf26 Mar 2026
Form 2File: Form 2 - Balaji Dham - Dec 25.pdf26 Mar 2026
Form 3File: Form 3 - Balaji Dham - Dec 25.pdf26 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Balaji Dham - Dec 25_11zon_organized.pdf26 Mar 2026
Form 1File: Form 1 - Balaji Dham - Sept 25.pdf25 Mar 2026
Form 2File: Form 2 - Balaji Dham - Sept 25.pdf25 Mar 2026
Form 3File: Form 3 - Balaji Dham - Sept 25_11zon_organized.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Balaji Dham - Sept 25_11zon_.pdf25 Mar 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Architects Certificate BALAJI DHAM - 30 MARCH 2025.pdf25 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Architects Certificate BALAJI DHAM - 30 JUNE 2025.pdf25 Jul 2025
Certificates of CA (Form 3)File: Form 3 March 25_compressed.pdf24 Jul 2025
Certificates of CA (Form 3)File: Form 3 June 25_compressed.pdf24 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 25.pdf24 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 25.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure - March 25_compressed.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure - June 25_compressed.pdf24 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Balaji DHam 24.pdf24 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Balaji Dham sep 24_compressed.pdf14 Jul 2025
Disclosure of sold/ booked inventoryFile: Balaji Dham Dec 24_compressed.pdf14 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Dham March 24.pdf10 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Dham June 24.pdf10 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Architects Certificate BALAJI DHAM - 30 SEP 24.pdf10 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Dham Dec 24.pdf10 Jul 2025
Certificates of CA (Form 3)File: Form 3 Balaji Dham Mar 24_compressed.pdf10 Jul 2025
Certificates of CA (Form 3)File: Form 3 Balaji Dham June 24_compressed.pdf10 Jul 2025
Certificates of CA (Form 3)File: Form 3 Balaji Dham Sep 24_compressed.pdf10 Jul 2025
Certificates of CA (Form 3)File: Form 3 Balaji Dham Dec 24_compressed.pdf10 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer BD - March - 24_compressed.pdf10 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg Cer BD June - 2024_compressed.pdf10 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg Cer BD Sept - 24 _compressed.pdf10 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer BD - Dec - 2024_compressed.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Balaji Dham March 24_compressed.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Balaji Dham Jun 24_compressed.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventary as on 31122023-1-20_compressed.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventary as on 31122023-21-42_compressed.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 Balaji Dham Phase I - Mar 23- 1.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 Balaji Dham Phase I - Mar 23-2.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 Balaji Dham Phase I - Mar 23-3.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 Balaji Dham Phase I - Mar 23-4.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Balaji Dham Dec 23-1_compressed.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Balaji Dham Dec 23-2_compressed.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Balaji Dham Dec 23-3_compressed.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Balaji Dham Dec 23-4_compressed.pdf22 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate March - 2023.pdf15 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FOrm 2 Dec 23.pdf15 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Balajidham Phase I.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera form 2 A as on 31032023 - Balaji dham.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form No 5 Balajidham Pahse - I.pdf8 Apr 2024
Declaration in FORM BFile: Balajidham Phase 1 Rera Affidative for Extention.pdf28 Mar 2024
Certificates of CA (Form 3)File: Form-3 March 20 1.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 20 2.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 20 3.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 20 4.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 20 5.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 1.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 2.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 3.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 4.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 5.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 21 6.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 1.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 2.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 3.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 4.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 5.pdf28 Mar 2023
Certificates of CA (Form 3)File: Form-3 March 22 6.pdf28 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Quality assurance certificate 19-20.pdf14 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality assurance certificate 20-21.pdf14 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality assurance certificate 21-22.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: BALAJIDHAM.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form no 05 - 20-21.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form no 05 - 21-22.pdf20 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Balaji Dham dec 19.pdf11 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Balajidham 19-01-19.pdf11 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balajidham June 19- 30-3-21.pdf21 Apr 2021

How this compares with Pune

68%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Dham Phase-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Misalawadi13,700+ in Pune

2 kmBalaji Dham Phase-1Completed 1Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Garva Land Deal Private Limited

Garva Land Deal Private Limited has 6 registrations on MahaRERA, including Balaji Dham Phase-1 and PHALTAN MEGACITY - RESIDENTIAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Balaji Dham Phase-1 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Dham Phase-1?

The registered promoter entity is Garva Land Deal Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Dham Phase-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Balaji Dham Phase-1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Balaji Dham Phase-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Dham Phase-1?

The professionals named in the filing: Architect: Amarjeet Kudalkar; Engineer: Rajendra Chaudhari; Engineer: Sagar Mahesh Maral. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Dham Phase-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Dham Phase-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Dham Phase-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.