Home / Browse projects / Pune, Maharashtra / Kohinoor Kaleido-Phase-II

Registered Litigation declared Residential / Group Housing project

Kohinoor Kaleido-Phase-II

By Intofinity Promoters Private Limited

RG-MH-19072 · RERA P52100078107 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2029Possession promisedno revision filed
3 of 22Construction stages doneacross 4 buildings; furthest along: Stilt Floor, 60%
358 of 505Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

Kohinoor Kaleido-Phase-II is a Residential / Group Housing project by Intofinity Promoters Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100078107 on 25 Nov 2024. Possession is promised by 15 Oct 2029. 147 of the 505 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKohinoor Kaleido-Phase-II
  • TypeResidential / Group Housing
  • Location
    • Wagholi
    • Haveli
    • Pune
    • WAGHOLI
    • Haveli
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078107
  • ReraGenie IDRG-MH-19072

Builder

  • NameIntofinity Promoters Private Limited
  • Entity typeCompany
  • DirectorsVINEET KRISHNAKUMAR GOYAL, RAJESH KRISHNAKUMAR GOYAL
  • Other registrations10 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredNov 2024PromisedOct 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion15 Oct 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed160 files

Current status

29%147 of 505 units booked
16.2%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-A3NA21202170217
Tower-A8NA21808
Tower-A11NA23221760176
Tower-A12NA14131040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 60%.

Tower-A334%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower-A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower-A11Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Tower-A12Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed464

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots464
Closed/Covered222
Open Space242
BuildingClosed/CoveredOpen SpaceTotal
Tower-A3217228445
Tower-A851419

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area22,431 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Nov 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI121369.23
Proposed, not sanctioned45,595 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch421/A,GOKHALE ROAD,, NEAR SYMBIOSIS--ATUR CENTRE,, ASHOKNAGAR, PINCODE - 411016
Estimated costRs 49.79 cr
Cost incurredRs 8.06 cr
Work done16.2%
BuildingWingEstimatedIncurred
Tower-A3NARs 11.33 crRs 1.74 cr
Tower-A8NARs 11.33 crRs 1.74 cr
Tower-A11NARs 11.33 crRs 1.74 cr
Tower-A12NARs 11.33 crRs 1.74 cr
-NARs 4.47 crRs 1.09 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a architecture
EngineerPlanedge Consultants Pvt Ltd
Chartered AccountantSAC & CO LLP
Chartered AccountantShah Khandelwal Jain & Associates
PartnerRole in project
Intofinity Promoters Private Limited-

Litigation declared4

CaseCourtStatus
49/2009Civil Court PuneClosed
578/2012Civil Court PuneOngoing
184/2021Civil Court PuneOngoing
101/2023/2023Pune District and Session's courtOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600379Ram GawaliIntofinity Promoters Private Limited27/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Oct 2029

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1- Kaleido 2.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 02_Kaleido Ph II.pdf19 Apr 2026
Withdrawal Update Form 3File: Form 03_Kaledio II.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1_KALEIDO PHASE II.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 02_Kalideo Ph II.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 03_Kaledio Ph II.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5-Kaledio PH II.pdf29 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A_Kaledio Ph II.pdf15 Nov 2025
Form 1File: FORM 1- KALEIDO II.pdf20 Oct 2025
Form 2File: Form 02_Kaledio Ph II.pdf20 Oct 2025
Form 3File: Form 3-Kaledio PH II.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf20 Oct 2025
Form 1File: Kaleido 2.pdf13 Aug 2025
Form 2File: Form 02_Kaleido Ph II.pdf13 Aug 2025
Form 3File: Form 03_Kohinoor-Kaledio Phase -II.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory-Kaleido phase -II.pdf13 Aug 2025
Other - TechnicalFile: Kohinoor Kaleido Phase 2 - Form 2A.pdf12 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kohinoor Kaleido Phase 2 - Form 2A.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Kaleido 2.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Kaleido Ph II.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Kaleido Ph II.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Sold Booked.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Kaleido Ph II.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Kaleido Ph II.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K KALEIDO PH II.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ KOHINOOR KALEIDO PHASE II.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Kohinoor Kaleido-Phase II.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Kaleido 2.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kaleido 2.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Kaleido 2.pdf20 Jan 2025
Building plan approvalFile: 01-35.pdf6 Jan 2025
Building plan approvalFile: 02-35.pdf6 Jan 2025
Building plan approvalFile: 03-35.pdf6 Jan 2025
Building plan approvalFile: 04-35.pdf6 Jan 2025
Building plan approvalFile: 05-35.pdf6 Jan 2025
Building plan approvalFile: 06-35.pdf6 Jan 2025
Building plan approvalFile: 07-35.pdf6 Jan 2025
Building plan approvalFile: 08-35.pdf6 Jan 2025
Building plan approvalFile: 09-35.pdf6 Jan 2025
Building plan approvalFile: 10-35.pdf6 Jan 2025
Building plan approvalFile: 11-35.pdf6 Jan 2025
Building plan approvalFile: 12-35.pdf6 Jan 2025
Building plan approvalFile: 13-35.pdf6 Jan 2025
Building plan approvalFile: 14-35.pdf6 Jan 2025
Building plan approvalFile: 15-35.pdf6 Jan 2025
Building plan approvalFile: 16-35.pdf6 Jan 2025
Building plan approvalFile: 17-35.pdf6 Jan 2025
Building plan approvalFile: 18-35.pdf6 Jan 2025
Building plan approvalFile: 19-35.pdf6 Jan 2025
Building plan approvalFile: 20-35.pdf6 Jan 2025
Building plan approvalFile: 21-35.pdf6 Jan 2025
Building plan approvalFile: 22-35.pdf6 Jan 2025
Building plan approvalFile: 23-35.pdf6 Jan 2025
Building plan approvalFile: 24-35.pdf6 Jan 2025
Building plan approvalFile: 25-35.pdf6 Jan 2025
Building plan approvalFile: 26-35.pdf6 Jan 2025
Building plan approvalFile: 27-35.pdf6 Jan 2025
Building plan approvalFile: 28-35.pdf6 Jan 2025
Building plan approvalFile: 29-35.pdf6 Jan 2025
Building plan approvalFile: 30-35.pdf6 Jan 2025
Building plan approvalFile: 31-35.pdf6 Jan 2025
Building plan approvalFile: 32-35.pdf6 Jan 2025
Building plan approvalFile: 33-35.pdf6 Jan 2025
Building plan approvalFile: 34-35.pdf6 Jan 2025
Building plan approvalFile: 35-35.pdf6 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 241018 - CC.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 19-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 15-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 20-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 21-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 22-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 23-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 24-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 25-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 26-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 27-35.pdf6 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 28-35.pdf6 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kohinoor KaleidoP52100046027WAGHOLI, Pune832Jun 2022OngoingDec 2027Not due yet

How this compares with Pune

29%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Kaleido-Phase-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmKohinoor Kaleido-Phase-ICompleted 47Lapsed / revoked 26Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 109 registered projects within 2 km.

Builder: Intofinity Promoters Private Limited

Intofinity Promoters Private Limited has 11 registrations on MahaRERA, including Kohinoor Kaleido and Kohinoor Central Park - Phase 1. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kohinoor Kaleido-Phase-II is delayed beyond 15 Oct 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Kaleido-Phase-II?

The registered promoter entity is Intofinity Promoters Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Kaleido-Phase-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kohinoor Kaleido-Phase-II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kohinoor Kaleido-Phase-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Kaleido-Phase-II?

The professionals named in the filing: Architect: VK a architecture; Engineer: Planedge Consultants Pvt Ltd; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Kaleido-Phase-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Kaleido-Phase-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Kaleido-Phase-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.