Home / Browse projects / Pune, Maharashtra / Dwarikadham
Dwarikadham
By Yashodhan Affordable Landmark LLP
RG-MH-88585 · RERA P52100019278 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 42 months
- 1 extension taken
- Rs 75.00 crore secured on the land, in favour of aditya birla capital
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dwarikadham is a Others project by Yashodhan Affordable Landmark LLP in Pune, Maharashtra, registered with MahaRERA as P52100019278 on 15 Jan 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 42 months from the original filing. 602 of the 1,135 units on this registration are recorded sold or booked, and 74 of 132 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameDwarikadham
- TypeOthers
- Location
- Kondhwa- yeolewadi link road
- Kondhwa BK.
- kondhwa BK
- Haveli
- Pune
- 411048
- Pincode411048
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100019278
- ReraGenie IDRG-MH-88585
Builder
- NameYashodhan Affordable Landmark LLP
- Entity typePartnership
- PartnerRahul suresh Navandar
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jan 2019
- Promised completion30 Jun 2028
- Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2024)
- Buildings12 building records
- Documents filed128 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | NA | 8 | 7 | 70 | 0 | 70 |
| 2 | NA | 7 | 7 | 70 | 0 | 70 |
| 3 | NA | 8 | 7 | 70 | 0 | 70 |
| 4 | NA | 8 | 7 | 70 | 0 | 70 |
| 5 | NA | 15 | 14 | 112 | 0 | 112 |
| 6 | NA | 15 | 14 | 112 | 0 | 112 |
| 7 | NA | 23 | 19 | 152 | 0 | 152 |
| 8A | NA | 23 | 19 | 76 | 0 | 76 |
| 9 | NA | 23 | 19 | 152 | 0 | 152 |
| 8B | NA | 0 | 0 | 76 | 0 | 76 |
| LIG/MIG | NA | 12 | 11 | 131 | 0 | 131 |
| Dwarika Dham Commerce Park | NA | 2 | 2 | 0 | 44 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building12
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
74 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Installation of Lifts, at 95%.
182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
728%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 70% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
8A15%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
915%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
8B15%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LIG/MIG77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Dwarika Dham Commerce Park82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | Yes | 100% |
Parking filed2323
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| 1 | 105 | 40 | 145 |
| 2 | 105 | 40 | 145 |
| 3 | 105 | 40 | 145 |
| 4 | 105 | 40 | 145 |
| 5 | 168 | 64 | 232 |
| 6 | 168 | 64 | 232 |
| 7 | 228 | 50 | 278 |
| 8A | 152 | 57 | 209 |
| 9 | 228 | 50 | 278 |
| 8B | 152 | 0 | 152 |
| LIG/MIG | 197 | 54 | 251 |
| Dwarika Dham Commerce Park | 87 | 24 | 111 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 1 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 2 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 3 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 4 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 5 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 6 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 7 | NA | Rs 175.00 cr | Rs 85.05 cr |
| 8A | NA | Rs 175.00 cr | Rs 85.05 cr |
| 9 | NA | Rs 175.00 cr | Rs 85.05 cr |
| - | NA | Rs 20.00 cr | Rs 10.35 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Samyak C2 Infra Pvt Ltd Ganeshkumar Wable |
| Engineer | Parag Chopda |
| Engineer | ARJUN KANOJI |
| Chartered Accountant | SANJAYS SOMANICO |
| Partner | Role in project |
|---|---|
| Yashodhan Affordable Landmark LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject was registered as whole and not in phase wise manner. Phase 1 and Phase 2 have been allotted to buyers out of which phase 1 and Tower 5 of phase 2 has received OC and other buildings of phase 2 are within stipulated time period as committed to buyers. We require extension for phase 3 where no units have yet been sold. Kindly grant us the extension.
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000096160 | Rahul Dasnam | M/s Yashodhan Affordable Landmark LLP | 11/11/2021 |
| CC005000000198042 | Shankar Shivaji Jadhav | Rahul Navandar | 04/01/2023 |
| CC12501057 | Supriya Shahu Jadhav | Yashodhan Affordable Landmark LLP | 28/03/2025 |
| CC12604088 | VIJAYSINGH MAHADEV GAIKWAD | Yashodhan Affordable Landmark LLP | 30/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Apr 2023
Documents filed128
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 2A DWARIKA DHAM 25-26.pdf | 13 Aug 2026 |
| Form 5 (FY 2025-2026)File: form 5 dwarika dham 25-26.pdf | 13 Aug 2026 |
| Withdrawal Update Form 1File: Dham Form 1 june-26_compressed.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 JUN 26 DHAM.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 (2).pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: DWARIKA DHAM FORM 1_compressed.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 26 DWARIKA DHAM.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: form 3_compressed.pdf | 21 Apr 2026 |
| Form 1File: form 1.pdf | 21 Jan 2026 |
| Form 2File: FORM 2 DHAM DEC 25.pdf | 21 Jan 2026 |
| Form 3File: form 3_compressed-1.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DWARIKA DHAM DEC 25_compressed-1_11zon.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 DHAM DEC 25.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: form 3 updated .pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: form 3_compressed-1.pdf | 21 Jan 2026 |
| Layout approvalFile: HIGHLIGHTED BUILDING.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form -1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form2.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: form3Q22025_compressed_11zon.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: DHAM FORM 01.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: DDENGIF2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: form 3 dham revise jun 25 (2)_compressed.pdf | 16 Oct 2025 |
| Building plan approvalFile: c3.pdf | 25 Sep 2025 |
| Building plan approvalFile: c4.pdf | 25 Sep 2025 |
| Building plan approvalFile: c5.pdf | 25 Sep 2025 |
| Building plan approvalFile: c6.pdf | 25 Sep 2025 |
| Building plan approvalFile: c7.pdf | 25 Sep 2025 |
| Building plan approvalFile: c8_compressed.pdf | 25 Sep 2025 |
| Building plan approvalFile: c9_compressed.pdf | 25 Sep 2025 |
| Building plan approval or NA orderFile: cc.pdf | 25 Sep 2025 |
| Form 1File: FORM 1 JUNE 25.pdf | 24 Jul 2025 |
| Form 2File: FORM 2 JUN 25.pdf | 24 Jul 2025 |
| Form 3File: FORM 3 JUN 25 DWARKA DHAM_compressed.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: discloser sold unsold jun 25 _compressed.pdf | 24 Jul 2025 |
| Building plan approvalFile: 1 (1)_compressed (1).pdf | 15 Feb 2025 |
| Building plan approvalFile: 6 (1)_compressed.pdf | 15 Feb 2025 |
| Building Plan Approval (IOD)File: 1 (1)_compressed (1).pdf | 15 Feb 2025 |
| Building Plan Approval (IOD)File: 6 (1)_compressed.pdf | 15 Feb 2025 |
| Declaration in FORM BFile: form b.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193421.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193303.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193319.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193335.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193351.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193407.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193436.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193454.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193513.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193539.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193558.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 20241226193614.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: T9 SOLD UNSOLD.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: T11 sold unsold.pdf | 27 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Detail of Encumbrances.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092024.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032024.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122023.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092023.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062023.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032023.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122022.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032022.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30032023.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30062023.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30092023.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30122023.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30032024.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30062024.pdf | 26 Dec 2024 |
| Certificates of CA (Form 3)File: 30092024.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092024.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062024.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032024.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092023.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062023.pdf | 26 Dec 2024 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Dhruva Residency | S.no. 48 kondhwa bk. Pune 48 | 60 | Completed | Jun 2018 | Dec 2017 |
| Mahaveer Delight | S.no. 5 kondhwa bk. Pune 48 | 153 | Completed | Dec 2017 | Late, Mar 2018 |
| Mahaveer Corner | S.no. 2 kondhwa bk. Pune 48 | 16 | Completed | Mar 2017 | Mar 2017 |
| Mahaveer Park | S.no 4 kondhwa bk. Pune 48 | 87 | Completed | Dec 2016 | Late, Mar 2017 |
| Mahaveer Residency | Sn. No. 2 kondhwa bk. Pune 48 | 158 | Completed | Mar 2015 | Mar 2015 |
| Devgiri | S.no. 50 wadgaon sheri pune | 18 | Completed | Sep 2012 | Sep 2012 |
| Durva Residency | S.no. 17 katraj pune 48 | 18 | Completed | Mar 2012 | Late, Jun 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 128 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dwarikadham on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kondhwa BK.13,700+ in Pune
Filed coordinates, straight-line distance. 174 registered projects within 2 km.
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
BABAR CLASSIC VISTA WING A, B, C, D
Classic Properties
Builder: Yashodhan Affordable Landmark LLP
Yashodhan Affordable Landmark LLP has 1 registration on MahaRERA, including Dwarikadham. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Dwarikadham is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dwarikadham?
The registered promoter entity is Yashodhan Affordable Landmark LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dwarikadham?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Dwarikadham?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Dwarikadham?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dwarikadham?
The professionals named in the filing: Architect: Samyak C2 Infra Pvt Ltd Ganeshkumar Wable; Engineer: Parag Chopda; Engineer: ARJUN KANOJI; Chartered Accountant: SANJAYS SOMANICO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dwarikadham?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback