Registered No litigation declared Others project

Dwarikadham

By Yashodhan Affordable Landmark LLP

RG-MH-88585 · RERA P52100019278 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 42 months
  • 1 extension taken
  • Rs 75.00 crore secured on the land, in favour of aditya birla capital

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 42 months from the original
74 of 132Construction stages doneacross 12 buildings; furthest along: Installation of Lifts, 95%
533 of 1,135Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

Dwarikadham is a Others project by Yashodhan Affordable Landmark LLP in Pune, Maharashtra, registered with MahaRERA as P52100019278 on 15 Jan 2019. Possession is promised by 30 Jun 2028. The completion date has moved by 42 months from the original filing. 602 of the 1,135 units on this registration are recorded sold or booked, and 74 of 132 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameDwarikadham
  • TypeOthers
  • Location
    • Kondhwa- yeolewadi link road
    • Kondhwa BK.
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019278
  • ReraGenie IDRG-MH-88585

Builder

  • NameYashodhan Affordable Landmark LLP
  • Entity typePartnership
  • PartnerRahul suresh Navandar
  • Declared earlier projects8 →

Key dates

this monthRegisteredJan 2019First promiseDec 2024Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2019
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2024)
  • Buildings12 building records
  • Documents filed128 files

Current status

53%602 of 1,135 units booked
48.6%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA8770070
2NA7770070
3NA8770070
4NA8770070
5NA15141120112
6NA15141120112
7NA23191520152
8ANA231976076
9NA23191520152
8BNA0076076
LIG/MIGNA12111310131
Dwarika Dham Commerce ParkNA2204444

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building12

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

74 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Installation of Lifts, at 95%.

182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
382%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
482%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
582%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
682%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
728%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)65%
Plinth70%
Stilt Floor70%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
8A15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)65%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
915%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)65%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
8B15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)65%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LIG/MIG77%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Dwarika Dham Commerce Park82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes30%
Open ParkingYes100%

Parking filed2323

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,323
Closed/Covered1,800
Open Space523
BuildingClosed/CoveredOpen SpaceTotal
110540145
210540145
310540145
410540145
516864232
616864232
722850278
8A15257209
922850278
8B1520152
LIG/MIG19754251
Dwarika Dham Commerce Park8724111

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area37,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofaditya birla capital
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on17 Aug 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI95777.31
Proposed, not sanctioned82,672 sq m
Buildings approved14
Buildings sanctioned12

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBund garden road,Pune
Estimated costRs 1,595.00 cr
Cost incurredRs 775.84 cr
Work done48.64%
BuildingWingEstimatedIncurred
1NARs 175.00 crRs 85.05 cr
2NARs 175.00 crRs 85.05 cr
3NARs 175.00 crRs 85.05 cr
4NARs 175.00 crRs 85.05 cr
5NARs 175.00 crRs 85.05 cr
6NARs 175.00 crRs 85.05 cr
7NARs 175.00 crRs 85.05 cr
8ANARs 175.00 crRs 85.05 cr
9NARs 175.00 crRs 85.05 cr
-NARs 20.00 crRs 10.35 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSamyak C2 Infra Pvt Ltd Ganeshkumar Wable
EngineerParag Chopda
EngineerARJUN KANOJI
Chartered AccountantSANJAYS SOMANICO
PartnerRole in project
Yashodhan Affordable Landmark LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025828Dec 2024 → Jun 2028

Reason as filed by the promoterProject was registered as whole and not in phase wise manner. Phase 1 and Phase 2 have been allotted to buyers out of which phase 1 and Tower 5 of phase 2 has received OC and other buildings of phase 2 are within stipulated time period as committed to buyers. We require extension for phase 3 where no units have yet been sold. Kindly grant us the extension.

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC005000000096160Rahul DasnamM/s Yashodhan Affordable Landmark LLP11/11/2021
CC005000000198042Shankar Shivaji JadhavRahul Navandar04/01/2023
CC12501057Supriya Shahu JadhavYashodhan Affordable Landmark LLP28/03/2025
CC12604088VIJAYSINGH MAHADEV GAIKWADYashodhan Affordable Landmark LLP30/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Apr 2023

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A DWARIKA DHAM 25-26.pdf13 Aug 2026
Form 5 (FY 2025-2026)File: form 5 dwarika dham 25-26.pdf13 Aug 2026
Withdrawal Update Form 1File: Dham Form 1 june-26_compressed.pdf20 Jul 2026
Withdrawal Update Form 2File: FORM 2 JUN 26 DHAM.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3 (2).pdf20 Jul 2026
Withdrawal Update Form 1File: DWARIKA DHAM FORM 1_compressed.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 26 DWARIKA DHAM.pdf21 Apr 2026
Withdrawal Update Form 3File: form 3_compressed.pdf21 Apr 2026
Form 1File: form 1.pdf21 Jan 2026
Form 2File: FORM 2 DHAM DEC 25.pdf21 Jan 2026
Form 3File: form 3_compressed-1.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DWARIKA DHAM DEC 25_compressed-1_11zon.pdf21 Jan 2026
Withdrawal Update Form 1File: form 1.pdf21 Jan 2026
Withdrawal Update Form 1File: form 1.pdf21 Jan 2026
Withdrawal Update Form 2File: Form2.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM 2 DHAM DEC 25.pdf21 Jan 2026
Withdrawal Update Form 3File: form 3 updated .pdf21 Jan 2026
Withdrawal Update Form 3File: form 3_compressed-1.pdf21 Jan 2026
Layout approvalFile: HIGHLIGHTED BUILDING.pdf4 Dec 2025
Withdrawal Update Form 1File: Form -1.pdf18 Oct 2025
Withdrawal Update Form 2File: Form2.pdf18 Oct 2025
Withdrawal Update Form 3File: form3Q22025_compressed_11zon.pdf18 Oct 2025
Withdrawal Update Form 1File: DHAM FORM 01.pdf16 Oct 2025
Withdrawal Update Form 2File: DDENGIF2.pdf16 Oct 2025
Withdrawal Update Form 3File: form 3 dham revise jun 25 (2)_compressed.pdf16 Oct 2025
Building plan approvalFile: c3.pdf25 Sep 2025
Building plan approvalFile: c4.pdf25 Sep 2025
Building plan approvalFile: c5.pdf25 Sep 2025
Building plan approvalFile: c6.pdf25 Sep 2025
Building plan approvalFile: c7.pdf25 Sep 2025
Building plan approvalFile: c8_compressed.pdf25 Sep 2025
Building plan approvalFile: c9_compressed.pdf25 Sep 2025
Building plan approval or NA orderFile: cc.pdf25 Sep 2025
Form 1File: FORM 1 JUNE 25.pdf24 Jul 2025
Form 2File: FORM 2 JUN 25.pdf24 Jul 2025
Form 3File: FORM 3 JUN 25 DWARKA DHAM_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: discloser sold unsold jun 25 _compressed.pdf24 Jul 2025
Building plan approvalFile: 1 (1)_compressed (1).pdf15 Feb 2025
Building plan approvalFile: 6 (1)_compressed.pdf15 Feb 2025
Building Plan Approval (IOD)File: 1 (1)_compressed (1).pdf15 Feb 2025
Building Plan Approval (IOD)File: 6 (1)_compressed.pdf15 Feb 2025
Declaration in FORM BFile: form b.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193421.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193303.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193319.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193335.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193351.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193407.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193436.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193454.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193513.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193539.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193558.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: 20241226193614.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: T9 SOLD UNSOLD.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: T11 sold unsold.pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: Detail of Encumbrances.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122023.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092023.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062023.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032023.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122022.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032022.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30032023.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30062023.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30092023.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30122023.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30032024.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30062024.pdf26 Dec 2024
Certificates of CA (Form 3)File: 30092024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092023.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062023.pdf26 Dec 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Dhruva ResidencyS.no. 48 kondhwa bk. Pune 4860CompletedJun 2018Dec 2017
Mahaveer DelightS.no. 5 kondhwa bk. Pune 48153CompletedDec 2017Late, Mar 2018
Mahaveer CornerS.no. 2 kondhwa bk. Pune 4816CompletedMar 2017Mar 2017
Mahaveer ParkS.no 4 kondhwa bk. Pune 4887CompletedDec 2016Late, Mar 2017
Mahaveer ResidencySn. No. 2 kondhwa bk. Pune 48158CompletedMar 2015Mar 2015
DevgiriS.no. 50 wadgaon sheri pune18CompletedSep 2012Sep 2012
Durva ResidencyS.no. 17 katraj pune 4818CompletedMar 2012Late, Jun 2012

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dwarikadham on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa BK.13,700+ in Pune

2 kmDwarikadhamCompleted 73Lapsed / revoked 42Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 174 registered projects within 2 km.

Builder: Yashodhan Affordable Landmark LLP

Yashodhan Affordable Landmark LLP has 1 registration on MahaRERA, including Dwarikadham. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dwarikadham is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dwarikadham?

The registered promoter entity is Yashodhan Affordable Landmark LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dwarikadham?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dwarikadham?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dwarikadham?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dwarikadham?

The professionals named in the filing: Architect: Samyak C2 Infra Pvt Ltd Ganeshkumar Wable; Engineer: Parag Chopda; Engineer: ARJUN KANOJI; Chartered Accountant: SANJAYS SOMANICO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dwarikadham?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dwarikadham. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dwarikadham to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.