Home / Browse projects / Pune, Maharashtra / MAGNACITY - Tower A2

Registered Litigation declared Residential / Group Housing project

MAGNACITY - Tower A2

By Malnad Project (I) Pvt Ltd

RG-MH-53166 · RERA P52100054476 · Last updated on MahaRERA portal: 29 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 32.00 crore secured on the land, in favour of HDFC Capital Affordable Real Estate Fund
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 12 months from the original
19 of 99Construction stages doneacross 9 buildings; furthest along: Stilt Floor, 90%
389 of 1,080Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

MAGNACITY - Tower A2 is a Residential / Group Housing project by Malnad Project (I) Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100054476 on 25 Jan 2024. Possession is promised by 1 Dec 2029. The completion date has moved by 12 months from the original filing. 691 of the 1,080 units on this registration are recorded sold or booked, and 19 of 99 construction stages are filed complete.

At a glance

Project

  • NameMAGNACITY - Tower A2
  • TypeResidential / Group Housing
  • Location
    • Solapur Road
    • Manjari
    • MANJARI Bk
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054476
  • ReraGenie IDRG-MH-53166

Builder

  • NameMalnad Project (I) Pvt Ltd
  • Entity typeCompany
  • CINU45100PN2017PTC170130
  • GSTIN27AAGCK5660F1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsManish Vimalkumar Jain, Yogesh Yeshwant Bhave
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2024First promiseDec 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion1 Dec 2029
  • Revised completionRevised to 1 Dec 2029 (originally 2 Dec 2028)
  • Buildings9 building records
  • Documents filed118 files

Current status

64%691 of 1,080 units booked
16.3%Work done, per cost certificate

Figures as on 29 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2 - Wing ANA33301200120
A2 - Wing BNA33301200120
A2 - Wing CNA33301200120
A2 - Wing DNA33301200120
A2 - Wing ENA33301200120
A2 - Wing FNA33301200120
A2 - Wing GNA33301200120
A2 - Wing HNA33301200120
A2 - Wing JNA33301200120

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 29 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Stilt Floor, at 90%.

A2 - Wing A12%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing B12%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing C18%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing D18%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing E28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing F28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing G30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing H37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor90%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A2 - Wing J9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2484

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,484
Closed/Covered2,484
BuildingClosed/CoveredTotal
A2 - Wing A276276
A2 - Wing B276276
A2 - Wing C276276
A2 - Wing D276276
A2 - Wing E276276
A2 - Wing F276276
A2 - Wing G276276
A2 - Wing H276276
A2 - Wing J276276

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area47,613 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC Capital Affordable Real Estate Fund
Secured amountRs 32.00 crore
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI109417.45
Proposed, not sanctioned109,417 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMistry Bhavan EC Mumbai D Vacha Road 122 Backbay Reclamation Churchgate Mumbai
Estimated costRs 458.86 cr
Cost incurredRs 74.83 cr
Work done16.31%
BuildingWingEstimatedIncurred
-NARs 93.40 crRs 29.44 cr
A2 - Wing ANARs 40.61 crRs 2.03 cr
A2 - Wing BNARs 40.61 crRs 2.03 cr
A2 - Wing CNARs 40.61 crRs 3.92 cr
A2 - Wing DNARs 40.61 crRs 2.06 cr
A2 - Wing ENARs 40.61 crRs 6.09 cr
A2 - Wing FNARs 40.61 crRs 7.71 cr
A2 - Wing GNARs 40.61 crRs 10.57 cr
A2 - Wing HNARs 40.61 crRs 9.47 cr
A2 - Wing JNARs 40.61 crRs 1.51 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal Deshpande
EngineerRavindra Kukade
EngineerSuneel Kulkarni
EngineerAmit Nagpure
Chartered AccountantSPAK & Co.
Chartered AccountantGMKS & Co.
PartnerRole in project
Malnad Project (I) Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21072621816Dec 2028 → Dec 2029

Reason as filed by the promoterThe project "MAGNACITY - Tower A2" has experienced delays due to unforeseen circumstances beyond the control of the Promoter, including the ongoing geopolitical conflict in West Asia, disruptions in global supply chains, shortages and price escalation of construction materials, the Ready-Mix Concrete (RMC) suppliers' strike, labour shortages caused by elections,disruption in commercial LPG supply, and infrastructure constraints affecting labour welfare and productivity.

Litigation declared2

CaseCourtStatus
271/2017Civil Judge Senior Division PunePending
271/2017Civil Judge SeniorOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2029

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5_MAGNA_A2_Signed.pdf29 Sep 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf18 Jul 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf18 Jul 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf18 Jul 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf20 Apr 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf20 Apr 2026
Withdrawal Update Form 3File: 3_CA Certificate (1).pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A_March 2026_signed copy.pdf20 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate signed.pdf17 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf17 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf17 Jan 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf15 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf15 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf15 Jan 2026
Layout approvalFile: 1_Layout.pdf31 Dec 2025
Building plan approvalFile: 2_250618_A1 & A2_Parking_compressed.pdf2 Dec 2025
Building plan approvalFile: 3_250618_A1 & A2_UG Parking_compressed.pdf2 Dec 2025
Building plan approvalFile: 4_250618_A1 & A2_LG Parking_compressed.pdf2 Dec 2025
Building plan approvalFile: 8_250618_A2_Sec-Ele_compressed.pdf2 Dec 2025
Building plan approvalFile: 9_250618_A2_Sec-Ele_compressed.pdf2 Dec 2025
Building plan approvalFile: A1 and A2 Parking Plan.pdf5 Nov 2025
Building plan approvalFile: A1 and A2UG Parking 8.pdf5 Nov 2025
Building plan approvalFile: A1 and A2 LG Parking 9.pdf5 Nov 2025
Building plan approvalFile: A2 Bldg refuge fl Plan 12_rotated.pdf5 Nov 2025
Building plan approvalFile: A2 Bldg Typ fl Plan 13_rotated.pdf5 Nov 2025
Building plan approvalFile: A2 Bldg All fl Plan 14_rotated_compressed 1.pdf5 Nov 2025
Building plan approvalFile: A2Sec-Ele 15.pdf5 Nov 2025
Building plan approvalFile: 9A2 Sec-Ele 16_rotated.pdf5 Nov 2025
Layout approvalFile: Layout magna city (1).pdf4 Nov 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf31 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf30 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf30 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf30 Oct 2025
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf29 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf29 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_MAGNACITY_A2_Signed.pdf22 Sep 2025
Layout approvalFile: 1_250618_Sector 1B_Layout.pdf22 Jul 2025
Building plan approvalFile: 6_250618_A2_Bldg Typ fl Plan.pdf22 Jul 2025
Building plan approvalFile: 5_250618_A2_Bldg refuge fl Plan.pdf22 Jul 2025
Building plan approvalFile: 7_250618_A2_Bldg All fl Plan.pdf22 Jul 2025
Commencement certificateFile: 250618 RS 1 _CC.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_compressed.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_compressed (1).pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_compressed.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory_compressed.pdf28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MAGNACITY Tower A2_compressed.pdf17 Oct 2024
Proforma of Agreement for saleFile: 240809_A2_AFS_R6.pdf12 Aug 2024
Proforma of Agreement for saleFile: 240812_A2_AFS_R7.pdf12 Aug 2024
Proforma of Agreement for saleFile: 240812_A2_AFS_R7_1.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory_compressed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rera_008-compressed.pdf20 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 240605_Declaration of Separate Bank Account.pdf7 Jun 2024
Other - FinanceFile: 240605_Annexure A_Declaration cum Undertaking.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: MAGNACITY - Tower A2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240326_Decl about Grievance Redressal Cell.pdf26 Mar 2024
Proforma of Agreement for saleFile: 240208_A2_AFS_R4.pdf12 Feb 2024
Proforma of Agreement for saleFile: 240123_AFS_R3.pdf23 Jan 2024
Building plan approvalFile: 240105_Layout.pdf6 Jan 2024
Copy of the legal title reportFile: 240105_Legal Title Report_Pg 1 to 30.pdf6 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAGNACITY - Tower A3P52100052096Manjari, Pune480Jul 2023OngoingMay 2028Not due yet

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAGNACITY - Tower A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari13,700+ in Pune

2 kmMAGNACITY - Tower A2Completed 36Lapsed / revoked 14Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: Malnad Project (I) Pvt Ltd

Malnad Project (I) Pvt Ltd has 3 registrations on MahaRERA, including MAGNACITY - Tower A3 and MAGNACITY - Tower A2. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAGNACITY - Tower A2 is delayed beyond 1 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAGNACITY - Tower A2?

The registered promoter entity is Malnad Project (I) Pvt Ltd, a company as per the filing. Its CIN U45100PN2017PTC170130 and GSTIN 27AAGCK5660F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAGNACITY - Tower A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAGNACITY - Tower A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAGNACITY - Tower A2?

The professionals named in the filing: Architect: Vishal Deshpande; Engineer: Ravindra Kukade; Engineer: Suneel Kulkarni; Engineer: Amit Nagpure; Chartered Accountant: SPAK & Co.; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAGNACITY - Tower A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAGNACITY - Tower A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAGNACITY - Tower A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.