Aalaap - I at Nanded City

By Nanded City Development & Construction Co. Ltd.

RG-MH-79903 · RERA P52100055134 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 19 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 77Construction stages doneacross 7 buildings; furthest along: Basement (if any), 50%
63 of 936Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 138 documents Report an error

Aalaap - I at Nanded City is a Residential / Group Housing project by Nanded City Development & Construction Co. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100055134 on 4 Mar 2024. Possession is promised by 31 Dec 2027. 873 of the 936 units on this registration are recorded sold or booked, and 3 of 77 construction stages are filed complete.

At a glance

Project

  • NameAalaap - I at Nanded City
  • TypeResidential / Group Housing
  • Location
    • Sinhagad Road
    • Nanded Phata
    • Nanded
    • Haveli
    • Pune
    • 411068
  • Pincode411068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055134
  • ReraGenie IDRG-MH-79903

Builder

  • NameNanded City Development & Construction Co. Ltd.
  • Entity typeCompany
  • GSTIN27AACCN2613H1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorSatish Dattatray Magar
  • Other registrations20 more →
  • Completed12 of 21
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed138 files

Current status

93%873 of 936 units booked

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA21181440144
BNA21181440144
CNA21181440144
DNA21181440144
ENA21181080108
FNA21181080108
GNA21181440144

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 50%.

A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B2%
ActivityProgress
Excavation20%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities27

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Town level Water Treatment systemYes100%
Town level Roads Jogging Cycling tracks Footpath as per Proposed Land use PlanYes100%
Town level restricted facilities like swimming pool Tennis Courts Gymnasium Skating Rink Badminton CYes100%
Town level Public Assembly Facilities like AmphitheatreYes100%
Town level Primary and High Schools ICSE and CBSE BoardYes100%
Town level Playgrounds excluding School PlaygroundYes0%
Town level Gardens and ParksYes100%
Town level Exclusive Fire Fighting SystemYes100%
Town level Efficient Waste Management SystemYes100%
Town level Community MarketYes100%
Town level Community Healthcare FacilitiesYes0%
Town level 24x7 Centralized Security System with CCTV CoverageYes100%

Parking filed3046

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,046
Closed/Covered6
Open Space3,040
BuildingClosed/CoveredOpen SpaceTotal
A0587587
B1444445
C1374375
D1516517
E1266267
F1266267
G1587588

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,771 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority Pune
Permissible FSI107769.9
Proposed, not sanctioned107,770 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Solapur Bazar Road Off East Street Poolgate Pune 411001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAssociated Space Designers
EngineerJW Consultants LLP
EngineerPrashant Kanikdale
Chartered AccountantD R B S V & Associates
Chartered AccountantSDB & Company
PartnerRole in project
Nanded City Development & Construction Co. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed138

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - June 2026.pdf17 Jul 2026
Form 2File: Form 2 - June 2026.pdf17 Jul 2026
Form 3File: Form 3 - June 2026.pdf17 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - June 2026.pdf17 Jul 2026
Form 1File: Form 1 - March 2026.pdf6 Apr 2026
Form 2File: Form 2 - March 2026.pdf6 Apr 2026
Form 3File: Form 3 - March 2026.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked inventory - March 2026.pdf6 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf3 Apr 2026
Form 1File: Form 1 - Dec 2025.pdf16 Jan 2026
Form 2File: Form 2 - Dec 2025.pdf16 Jan 2026
Form 3File: Form 3 - Dec 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Dec 2025.pdf16 Jan 2026
Form 1File: Form 1 - Sep 2025.pdf18 Oct 2025
Form 2File: Form 2 - Sep 2025.pdf18 Oct 2025
Form 3File: Form 3 - Sep 2025.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Sep 2025.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Form 1File: Form 1 - June 2025.pdf18 Jul 2025
Form 2File: Form 2 - June 2025.pdf18 Jul 2025
Form 3File: Form 3 - June 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory - June 2025.pdf18 Jul 2025
Form 1File: Form 1 - March 2025.pdf11 Jun 2025
Form 2File: Form 2 - March 2025.pdf11 Jun 2025
Form 3File: Form 3 - March 2025.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf11 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf8 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024-2025.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2025.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan 2025.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 - Dec 2024.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Dec 2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2024.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 2024.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Oct 2024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Jun 2024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - September 2024.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - March 2024.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale - Deviation Report.pdf28 Feb 2024
Other - TechnicalFile: Declaration cum Undertaking.pdf28 Feb 2024
Proforma of Agreement for saleFile: Agreement For Sale.pdf27 Feb 2024
Building plan approvalFile: 2-27.pdf26 Feb 2024
Building plan approvalFile: 3-27.pdf26 Feb 2024
Building plan approvalFile: 5-27.pdf26 Feb 2024
Building plan approvalFile: 5-27.pdf26 Feb 2024
Building plan approvalFile: 6-27.pdf26 Feb 2024
Building plan approvalFile: 7-27.pdf26 Feb 2024
Building plan approvalFile: 8-27.pdf26 Feb 2024
Building plan approvalFile: 9-27.pdf26 Feb 2024
Building plan approvalFile: 10-27.pdf26 Feb 2024
Building plan approvalFile: 11-27.pdf26 Feb 2024
Building plan approvalFile: 12-27.pdf26 Feb 2024
Building plan approvalFile: 13-27.pdf26 Feb 2024
Building plan approvalFile: 14-27.pdf26 Feb 2024
Building plan approvalFile: 15-27.pdf26 Feb 2024
Building plan approvalFile: 16-27.pdf26 Feb 2024
Building plan approvalFile: 17-27.pdf26 Feb 2024
Building plan approvalFile: 18-27.pdf26 Feb 2024
Building plan approvalFile: 19-27.pdf26 Feb 2024
Building plan approvalFile: 20-27.pdf26 Feb 2024
Building plan approvalFile: 21-27.pdf26 Feb 2024
Building plan approvalFile: 22-27.pdf26 Feb 2024
Building plan approvalFile: 23-27.pdf26 Feb 2024
Building plan approvalFile: 24-27.pdf26 Feb 2024
Building plan approvalFile: 25-27.pdf26 Feb 2024
Building plan approvalFile: 26-27.pdf26 Feb 2024
Building plan approvalFile: 27-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-27.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 7-27.pdf26 Feb 2024

Promoter's earlier projects21

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

19 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Destination Center - IIP52100079788Nanded Phata, Pune56Mar 2025OngoingDec 2026Not due yet
Bahaar at Nanded CityP52100049984Nanded Phata, Pune608Mar 2023OngoingDec 2026Not due yet
Janaranjani - D Phase II at Nanded CityP52100047078Nanded Phata, Pune-Sep 2022CompletedDec 2025Apr 2025
Sur at Nanded CityP52100032686Nanded Phata, Pune-Jan 2022CompletedAug 2025Apr 2025
Rhythm III at Nanded CityP52100028650Nanded Phata, Pune121Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm II at Nanded CityP52100028623Nanded Phata, Pune87Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm I at Nanded CityP52100028606Nanded Phata, Pune79Mar 2021Certificate SignedSep 2024Feb 2024
Kalashree at Nanded CityP52100021483Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Bageshree at Nanded CityP52100021465Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Pancham Phase II at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedApr 2021Jan 2021
Janaranjani 5B at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedNov 2020Jun 2020
Pancham Phase I at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedOct 2019Apr 2019
Janaranjani 5A at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedAug 2019Aug 2019
Sargam at Nanded CityNanded City Sinhagad Road Pune 4110681,736-CompletedMar 2019Jul 2018
Madhuvanti at Nanded CityNanded City Sinhagad Road Pune 4110681,012-CompletedAug 2016Mar 2016
Mangal Bhairav at Nanded CityNanded City Sinhagad Road Pune 4110681,672-CompletedDec 2015Oct 2015
Sarang at Nanded CityNanded City Sinhagad Road Pune 4110681,144-CompletedNov 2015Oct 2015
Asawari at Nanded CityNanded City Sinhagad Road Pune 4110681,936-CompletedOct 2015Aug 2015
Shubhkalyan at Nanded CityNanded City Sinhagad Road Pune 411068528-CompletedSep 2015Mar 2015
Lalit at Nanded CityNanded City Sinhagad Road Pune 411068792-CompletedApr 2015Dec 2014
Destination Center I at Nanded CityNanded City Sinhagad Road Pune 411068272-CompletedApr 2015Mar 2015

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aalaap - I at Nanded City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nanded Phata13,700+ in Pune

Builder: Nanded City Development & Construction Co. Ltd.

Nanded City Development & Construction Co. Ltd. has 21 registrations on MahaRERA, including Sargam at Nanded City and Pancham Phase I at Nanded City. Its filings disclose 22 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aalaap - I at Nanded City is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aalaap - I at Nanded City?

The registered promoter entity is Nanded City Development & Construction Co. Ltd., a company as per the filing. Its GSTIN 27AACCN2613H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aalaap - I at Nanded City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aalaap - I at Nanded City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aalaap - I at Nanded City?

The professionals named in the filing: Architect: Associated Space Designers; Engineer: JW Consultants LLP; Engineer: Prashant Kanikdale; Chartered Accountant: D R B S V & Associates; Chartered Accountant: SDB & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aalaap - I at Nanded City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aalaap - I at Nanded City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aalaap - I at Nanded City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.