Home / Browse projects / Pune, Maharashtra / Yashwin Urbo Centro Phase 2

Registered No litigation declared Others project

Yashwin Urbo Centro Phase 2

By Vilas Javdekar Infinitee Developers Pvt. Ltd.

RG-MH-18857 · RERA P52100077674 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Rs 125.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
12 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 55%
226 of 1,039Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 387 documents Report an error

Yashwin Urbo Centro Phase 2 is a Others project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100077674 on 21 Oct 2024. Possession is promised by 30 Jun 2029. 813 of the 1,039 units on this registration are recorded sold or booked, and 12 of 44 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameYashwin Urbo Centro Phase 2
  • TypeOthers
  • Location
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077674
  • ReraGenie IDRG-MH-18857

Builder

  • NameVilas Javdekar Infinitee Developers Pvt. Ltd.
  • Entity typeCompany
  • CINU70109PN2020PTC195347
  • GSTIN27AAHCV6956A1Z5
  • DirectorsAditya Vilas Javdekar, Aditya Vilas Javdekar
  • Other registrations10 more →
  • Completed4 of 11

Key dates

this monthRegisteredOct 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed387 files

Current status

78%813 of 1,039 units booked
18.4%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A1 - A2NA373425626282
Wing E1 - E2NA38342590259
Wing F1 - F2NA38342560256
Wing G1 - G2NA383422814242

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 55%.

Wing A1 - A247%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E1 - E237%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing F1 - F228%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing G1 - G29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1784

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,784
Closed/Covered1,740
Open Space44
BuildingClosed/CoveredOpen SpaceTotal
Wing A1 - A24740474
Wing E1 - E238944433
Wing F1 - F24650465
Wing G1 - G24120412

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,477 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTATA CAPITAL HOUSING FINANCE LIMITED
Secured amountRs 125.00 crore
CERSAI search filedYes
Declared on20 May 2025
LandownerVillageDistrict
Forrestar Dwellings Pvt. Ltd.Pune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI123000.0
Proposed, not sanctioned113,870 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 1, S. No. 15/1, Sarthak Terraces, Opp. Gandhi Lawns, Kothrud, Pune.411038
Estimated costRs 368.86 cr
Cost incurredRs 68.03 cr
Work done18.44%
BuildingWingEstimatedIncurred
Wing A1 - A2NARs 85.07 crRs 24.00 cr
Wing F1 - F2NARs 84.95 crRs 6.33 cr
Wing G1 - G2NARs 79.52 crRs 2.69 cr
Wing E1 - E2NARs 62.11 crRs 6.60 cr
-NARs 57.21 crRs 28.41 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSammer Valimbe
ArchitectAsad Ahmed
ArchitectNeha Bagayatkar
ArchitectPriya Honmute
ArchitectDeepali Patidar
EngineerSagar Kale
Chartered AccountantSunil Nimbalkar
Chartered AccountantAbhijit Mundada
PartnerRole in project
Vilas Javdekar Infinitee Developers Pvt. Ltd.-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12500525Anil Ramsing PatilVilas Javdekar Infinitee Developers Pvt. Ltd.15/02/2025
CC12501570AMBIKA ATUL KARANJKARVilas Javdekar Infinitee Developers Pvt. Ltd.13/05/2025
CC12601734Dnyaaneshwar Sitaraam KaraaleVilas Javdekar Infinitee Developers Pvt. Ltd.26/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed387

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 387 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate YUC PH 2 11-05-26 .pdf12 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate YUC PH 2 02-06-26.pdf12 Jun 2026
Withdrawal Update Form 3File: CA Certificate YUC PH-2_LO 03-06-26 compressed.pdf12 Jun 2026
Withdrawal Update Form 1File: Architect Certificate YUC PH 2 11-05-26 .pdf22 May 2026
Withdrawal Update Form 2File: Engineer certificate YUC PH 2 11-05-2026.pdf22 May 2026
Withdrawal Update Form 3File: CA certificate YUC PH-2 11-05-2026.pdf22 May 2026
Form 2A (FY 2025-2026)File: Form 2 A YUC PH 2.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate YUC PH 2 31-03-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Engg certi_YUC Ph-2_30032026 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Scanned Copy of YUC ph-2 Compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect CertificateYUC PH 2 05-03-26.pdf21 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate YUC PH 2 05-03-26 .pdf21 Mar 2026
Withdrawal Update Form 3File: CA Certificate YUC PH 2 06-03-2026_compressed.pdf21 Mar 2026
Withdrawal Update Form 1File: Architect Certificate YUC PH 2 31-12-25.pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer certiifcate YUC PH 2 .pdf20 Jan 2026
Withdrawal Update Form 3File: CA Certificate_YUC Ph-2.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect certificate YUC PH 2 30-09-25.pdf17 Oct 2025
Withdrawal Update Form 2File: Engineer certificate YUC PH 2 30-09-25.pdf17 Oct 2025
Withdrawal Update Form 3File: CA Certificate YUC PH 2 30-09-25.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: VJIDPL - Form 5 P52100077674 - YUC2.pdf30 Sep 2025
Withdrawal Update Form 1File: Architech Certificate YUC 2 30-06-25.pdf14 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate YUC 2 30-06-25.pdf14 Aug 2025
Withdrawal Update Form 3File: CA Certificate YUC 2.pdf14 Aug 2025
Layout approvalFile: YUC_sanctioned layout dated 25072025_highlighted_compressed.pdf7 Aug 2025
Building plan approvalFile: 02- BASEMENT- 2 FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 03- BASEMENT - 1 FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 04- GROUND FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 05- 1ST FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 06- 2ND FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 07- 3RD FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 08- 4TH FLOOR PLAN_compressed.pdf7 Aug 2025
Building plan approvalFile: 09- WING A1-A2_compressed.pdf7 Aug 2025
Building plan approvalFile: 10- WING A1-A2_compressed.pdf7 Aug 2025
Building plan approvalFile: 12- WING A1-A2_compressed.pdf7 Aug 2025
Building plan approvalFile: 13- WING A1-A2_compressed.pdf7 Aug 2025
Building plan approvalFile: 14- WING A1-A2_compressed.pdf7 Aug 2025
Building plan approvalFile: 33- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 34- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 35- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 36- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 37- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 38- WING E1-E2_compressed.pdf7 Aug 2025
Building plan approvalFile: 39- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 40- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 41- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 42- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 43- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 45- WING G1-G2_compressed.pdf7 Aug 2025
Building plan approvalFile: 40- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 41- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 42- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 43- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 44- WING F1-F2_compressed.pdf7 Aug 2025
Building plan approvalFile: 45- WING G1-G2_compressed.pdf7 Aug 2025
Building plan approvalFile: 46- WING G1-G2_compressed.pdf7 Aug 2025
Building plan approvalFile: 47- WING G1-G2_compressed.pdf7 Aug 2025
Building plan approvalFile: 48- WING G1-G2_compressed.pdf7 Aug 2025
Building plan approvalFile: 49- WING G1-G2_compressed.pdf7 Aug 2025
Form 2A (FY 2024-2025)File: YUC2_Form2A_31032025_Signed.pdf26 Jun 2025
Layout approvalFile: 01- Layout.pdf5 Jun 2025
Building plan approvalFile: 02- BASEMENT 2 FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 03- BASEMENT 1 FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 04- GROUND FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 05- 1ST FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 06- 2ND FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 07- 3RD FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 08- 4TH FLOOR PLAN.pdf5 Jun 2025
Building plan approvalFile: 09- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 10- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 11- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 12- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 13- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 14- WING A1-A2.pdf5 Jun 2025
Building plan approvalFile: 33- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 34- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 35- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 36- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 37- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 38- WING E1-E2.pdf5 Jun 2025
Building plan approvalFile: 39- WING F1-F2.pdf5 Jun 2025

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashwin Urbo Centro Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmYashwin Urbo Centro PhasCompleted 138Lapsed / revoked 50Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.

Vilas Javdekar Infinitee Developers Pvt. Ltd. has 11 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashwin Urbo Centro Phase 2 is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashwin Urbo Centro Phase 2?

The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashwin Urbo Centro Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Yashwin Urbo Centro Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Yashwin Urbo Centro Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashwin Urbo Centro Phase 2?

The professionals named in the filing: Architect: Sammer Valimbe; Architect: Asad Ahmed; Architect: Neha Bagayatkar; Architect: Priya Honmute; Architect: Deepali Patidar; Engineer: Sagar Kale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashwin Urbo Centro Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashwin Urbo Centro Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashwin Urbo Centro Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.