Red flags
- Litigation declared, 5 cases
- 11 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
- Rs 490.00 crore secured on the land, in favour of Kotak Alternate Asset Management Ltd
Clear
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAHA TRADE MARKET PH- 2 is a Commercial project by JAIRAJ REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100022645 on 9 Oct 2019. Possession is promised by 30 Jun 2027. The completion date has moved by 18 months from the original filing. 756 of the 1,317 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 11 complaints are on record with the regulator.
At a glance
Project
- NameMAHA TRADE MARKET PH- 2
- TypeCommercial
- Location
- MUNJERI PARISHAR
- BIBWEWADI
- Pune (M Corp.)
- Pune City
- Pune
- 411037
- Pincode411037
- RERA no.P52100022645
- ReraGenie IDRG-MH-14518
Builder
- NameJAIRAJ REALTY LLP
- Entity typePartnership
- PartnersATUL ASHOK CHORDIA, ASHOK DHANRAJ CHORDIA, MALAV JAYANT SHAH, JAYANT HIRALAL SHAH
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Oct 2019
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed423 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building Zone A B C D E2 | NA | 10 | 6 | 0 | 1317 | 1317 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 88%.
Building Zone A B C D E2: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 88% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 23% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 4% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed2817
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| JAIRAJ REALTY UNIT 9 | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building Zone A B C D E2 | NA | Rs 377.23 cr | Rs 171.46 cr |
| - | NA | Rs 50.30 cr | Rs 36.80 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK:a Architecture |
| Architect | Vishal Deshpande |
| Engineer | G.A. Bhilare Consultants Private Limited |
| Engineer | Rohan Naik |
| Engineer | Pravin Gurav |
| Chartered Accountant | SPAK & Co |
| Chartered Accountant | RSVA & Co. |
| Chartered Accountant | GMKS & Co. |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| JAIRAJ REALTY LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 05/02/2026 we request you kindly to grant us extension till 30/06/2027.
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 837/2022 | Shri. Patil | Ongoing |
| 35/2024 | Shri. Pawar | Ongoing |
| 1495/2024 | Shri. Patil | Ongoing |
| 1329/2024 | Shri. Pawar | Ongoing |
| 918/2024 | Shri. Dongare | Ongoing |
Complaints filed with MahaRERA11
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000290269 | Sandeep Subhash Bafna | JAIRAJ REALTY LLP | 31/01/2024 |
| CC005000000370966 | Jairaj Realty Unit 9 LLP | IBICON PRIVATE LIMITED | 20/05/2024 |
| CC005000000370967 | Jairaj Realty Unit 9 LLP | Parihar Mehanti Munnalal | 20/05/2024 |
| CC005000000411088 | Jairaj Realty Unit 9 LLP | Ibicon Private Limited | 10/06/2024 |
| CC12500127 | Jairaj Realty Unit 9 LLP | Mr Sandeep Subhash Bafna (Allottee) | 13/01/2025 |
| CC12501651 | sandeep kharbanda | JAIRAJ REALTY LLP | 21/05/2025 |
| CC12501617 | Anil Udaysingh Tanwar | JAIRAJ REALTY LLP | 17/05/2025 |
| CC12501944 | Jairaj Realty Unit 9 LLP | Mr Yashwant Balaso Ghorpade | 13/06/2025 |
| CC12501945 | Jairaj Realty Unit 9 LLP | Mr Yash Mathuria | 13/06/2025 |
| CC12503414 | pooja sumeet malhotra | JAIRAJ REALTY LLP | 24/09/2025 |
| CC12601104 | Anil Udaysingh Tanwar | JAIRAJ REALTY LLP | 28/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed423
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 423 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - MTM PH -II - Jun 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 MTM PH - II - Jun 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - MTM PH - II - Jun 26.pdf | 20 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - MTM PH II- Mar 2026.pdf | 8 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - MTM PH II- Mar 2026.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: Form 2 - MTM PH II- Mar 2026.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Form 3 - MTM PH II- Mar 2026 - Compress.pdf | 2 May 2026 |
| Form 1File: Form 1 - MTM PH II - Mar 23.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - March 23.pdf | 9 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Mar 23-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH - II - Mar 23.pdf | 9 Feb 2026 |
| Form 1File: Form - 1 MTM PH - II- Jun 22.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - June 23.pdf | 9 Feb 2026 |
| Form 3File: Form 3_CA MTM Ph 2-June 23.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure -MTM-PH-2- Jun22.pdf | 9 Feb 2026 |
| Form 1File: Form -1 MTM PH - II Sept 2023.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Sep 23.pdf | 9 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Sept 23-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure-MTM PH - II Sept 23 .pdf | 9 Feb 2026 |
| Form 1File: Form 1 - MTM Ph - II Dec 23.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Dec 23.pdf | 9 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Dec 23-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure -MTM Ph II Dec 23 .pdf | 9 Feb 2026 |
| Form 1File: Form-1 - MTM PH II - Mar 24.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - March 24.pdf | 9 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Mar 24-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure -MTM PH - II - Mar 24.pdf | 9 Feb 2026 |
| Form 1File: Form 1- MTM PH II - Jun 2024.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - June 24.pdf | 9 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Jun 24-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH II - Jun 24.pdf | 9 Feb 2026 |
| Form 1File: Form 1 - MTM PH II - Sept 24-.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Sep 24.pdf | 9 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Sept 24.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH - II - Sept 24.pdf | 9 Feb 2026 |
| Form 1File: Form -1 - MTM PH II - Dec -24.pdf | 9 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Dec 24.pdf | 9 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Dec 24-.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclsoure - MTM PH II - Dec 24.pdf | 9 Feb 2026 |
| Form 1File: Form 1- MTM-PH-II _ Mar 2025.pdf | 9 Feb 2026 |
| Form 2File: Form 2_MTM PH 2_March 2025..pdf | 9 Feb 2026 |
| Form 3File: Form 3_MTM PH 2_March 2025 Signed.pdf | 9 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH II - Mar 25.pdf | 9 Feb 2026 |
| Form 1File: Form 1 -MTM PH II - Jun 21.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - June 21.pdf | 7 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Jun 21.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH - II- Jun 21.pdf | 7 Feb 2026 |
| Form 1File: Form 1 -MTM PH II - Sept 21.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Sep 21.pdf | 7 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Sept 21.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure -MTM PH-2- Sept-21 .pdf | 7 Feb 2026 |
| Form 1File: Form-1 MTM PH-II - Dec 21.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Dec 21.pdf | 7 Feb 2026 |
| Form 3File: Form 3_CA MTM Ph 2_Dec 21.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure -MTM PH - II - Dec 21.pdf | 7 Feb 2026 |
| Form 1File: Form 1- MTM - Ph II - Mar 22.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - March 22.pdf | 7 Feb 2026 |
| Form 3File: Form 3-MTM PH -2 - Mar 22.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH - II - Mar 22.pdf | 7 Feb 2026 |
| Form 1File: Form 1 - MTM PH II - Jun 22.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - June 22.pdf | 7 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Jun 22.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - MTM PH II Jun 2022 .pdf | 7 Feb 2026 |
| Form 1File: Form-1 MTM PH-II - Sep 22.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Sep 22.pdf | 7 Feb 2026 |
| Form 3File: Form 3 - MTM PH II - Sept 22.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold_Disclosure-MTM Phase-2- Sept 22.pdf | 7 Feb 2026 |
| Form 1File: Form 1 -MTM PH II - Dec 22.pdf | 7 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - Dec 22.pdf | 7 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Dec 22.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold_Disclosure_MTM_Phase_2_Dec_22.pdf | 7 Feb 2026 |
| Form 1File: Form 1 -MTM PH II - Mar 21.pdf | 4 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - March 21.pdf | 4 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Mar 21.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure - Mar 21.pdf | 4 Feb 2026 |
| Form 1File: Form-1 MTM PH-II - March 20.pdf | 3 Feb 2026 |
| Form 2File: Form-2 MTM PH-II - March 20.pdf | 3 Feb 2026 |
| Form 3File: Form 3 -MTM PH II - Mar 20.pdf | 3 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure MTM PH II - Mar 20.pdf | 3 Feb 2026 |
| Form 1File: Form 1 -MTM PH II - Jun 20.pdf | 3 Feb 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 423 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAHA TRADE MARKET PH- 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BIBWEWADI13,700+ in Pune
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
WORLD THREE - SOLITAIRE WORLD
Classic Promoters and Builders Private Lim
Builder: JAIRAJ REALTY LLP
JAIRAJ REALTY LLP has 2 registrations on MahaRERA, including MAHA TRADE MARKET PH- 1 and MAHA TRADE MARKET PH- 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MAHA TRADE MARKET PH- 2 is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAHA TRADE MARKET PH- 2?
The registered promoter entity is JAIRAJ REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAHA TRADE MARKET PH- 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MAHA TRADE MARKET PH- 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MAHA TRADE MARKET PH- 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAHA TRADE MARKET PH- 2?
The professionals named in the filing: Architect: VK:a Architecture; Architect: Vishal Deshpande; Engineer: G.A. Bhilare Consultants Private Limited; Engineer: Rohan Naik; Engineer: Pravin Gurav; Chartered Accountant: SPAK & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAHA TRADE MARKET PH- 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback