Home / Browse projects / Pune, Maharashtra / RENUKA PANCHATATTVA
RENUKA PANCHATATTVA
By Renuka Realty Private Limited
RG-MH-61855 · RERA P52100048051 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Rs 77.00 crore secured on the land, in favour of State Bank of lndia
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RENUKA PANCHATATTVA is a Residential / Group Housing project by Renuka Realty Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100048051 on 8 Dec 2022. Possession is promised by 15 Dec 2030. 476 of the 901 units on this registration are recorded sold or booked, and 24 of 55 construction stages are filed complete.
At a glance
Project
- NameRENUKA PANCHATATTVA
- TypeResidential / Group Housing
- Location
- D P Road
- Tathawade
- Tathwade
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048051
- ReraGenie IDRG-MH-61855
Builder
- NameRenuka Realty Private Limited
- Entity typeCompany
- CINU45309PN2022PTC207788
- DirectorsAJAY BABU MEHETRE, BABU SAYBANNA MEHETRE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2022
- Promised completion15 Dec 2030
- Revised completionNone
- Buildings5 building records
- Documents filed183 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG TERRA | NA | 23 | 21 | 120 | 0 | 120 |
| BLDG MARINA | NA | 23 | 22 | 122 | 15 | 137 |
| BLDG IGNIS | NA | 23 | 22 | 160 | 34 | 194 |
| BLDG AURA | NA | 23 | 22 | 199 | 24 | 223 |
| BLDG CELESTA | NA | 23 | 22 | 195 | 32 | 227 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 90%.
BLDG TERRA23%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 6% |
BLDG MARINA28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 6% |
BLDG IGNIS59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 6% |
BLDG AURA89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BLDG CELESTA89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 40% |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 40% |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BLDG MARINA | 1 | 1 |
| BLDG IGNIS | 1 | 1 |
| BLDG AURA | 1 | 1 |
| BLDG CELESTA | 1 | 1 |
Land and ownership9
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Shivaji Somaji Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Ajay Shivaji Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Atul Shivaji Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Sanjay Dattatraya Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Pramod Dattatraya Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Balasaheb Dattatraya Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Rajendra Baban Dalvi | Pimpri Chinchawad (M Corp.) | Pune |
| Sunil Vitthal Yewale | Pimpri Chinchawad (M Corp.) | Pune |
| J N Builders | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLDG CELESTA | NA | Rs 98.60 cr | Rs 98.60 cr |
| BLDG IGNIS | NA | Rs 92.21 cr | Rs 64.55 cr |
| BLDG AURA | NA | Rs 85.35 cr | Rs 85.35 cr |
| BLDG MARINA | NA | Rs 49.69 cr | Rs 19.88 cr |
| BLDG TERRA | NA | Rs 48.03 cr | Rs 16.81 cr |
| - | NA | Rs 8.08 cr | Rs 2.42 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shashank Phadke |
| Engineer | Mayur Mansukh Manani |
| Engineer | Hanslal Parekh & Associates |
| Chartered Accountant | CA Pradnya Gandhi |
| Chartered Accountant | Kishor Gujar & Associates |
| Partner | Role in project |
|---|---|
| Renuka Realty Private Limited | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 15/2014 | CIVIL COURT PIMPRI | ISSUES |
| 20/2021 | PIMPRI CIVIL COURT | Unready Board |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Dec 2030
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Panchattava - Form 1 -Mar 26.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Panchattatva Form 2 -Mar 26.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Panchattva Form 3 -Mar 26_compressed.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Renuka Panchatattva as on Dec 2025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Renuka Panchatattva as on Dec 2025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Renuka Panchatattva as on Dec 2025.pdf | 3 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Renuka Panchatattva FY 2024-25.pdf | 24 Dec 2025 |
| Form 1File: Form 1 - Renuka Panchatattva as on Sep 2025.pdf | 12 Nov 2025 |
| Form 2File: Form 2 - Renuka Panchatattva as on Sep 2025.pdf | 12 Nov 2025 |
| Form 3File: Form 3 - Renuka Panchatattva as on Sep 2025_1_11zon.pdf | 12 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Renuka Panchatattva as on Sep 2025_2_11zon.pdf | 12 Nov 2025 |
| Form 1File: Form 1.pdf | 11 Nov 2025 |
| Form 2File: FORM - 2.pdf | 11 Nov 2025 |
| Form 3File: Form 3.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Inventory.pdf | 11 Nov 2025 |
| Form 1File: FORM -1.pdf | 21 Jun 2025 |
| Form 2File: Form - 2.pdf | 21 Jun 2025 |
| Form 3File: Renuka Realty- Form no 3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 21 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 dT 26-3-25.pdf | 16 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration.pdf | 16 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 16 Apr 2025 |
| Building plan approvalFile: 01-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 02-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 03-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 04-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 05-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 06-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 07-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 08-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 09-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 10-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 11-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 12-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 13-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 14-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 15-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 16-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 17-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 18-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 19-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 20-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 21-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 22-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 23-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 24-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 25-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 26-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 27-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 28-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 29-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 30-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 31-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 32-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 33-34.pdf | 15 Apr 2025 |
| Building plan approvalFile: 34-34.pdf | 15 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecment 03-25.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 26-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 18-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 19-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 20-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 21-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 22-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 23-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 24-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 25-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 34-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 27-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 28-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 29-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 30-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 31-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 32-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 33-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 01-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04-34.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 05-34.pdf | 15 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RENUKA PANCHATATTVA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tathawade13,700+ in Pune
Filed coordinates, straight-line distance. 231 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
LIFE REPUBLIC SECTOR R14/14TH AVENUE - QRIOUS/
KOLTE-PATIL DEVELOPERS LIMITED
Builder: Renuka Realty Private Limited
Renuka Realty Private Limited has 1 registration on MahaRERA, including RENUKA PANCHATATTVA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if RENUKA PANCHATATTVA is delayed beyond 15 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RENUKA PANCHATATTVA?
The registered promoter entity is Renuka Realty Private Limited, a company as per the filing. Its CIN U45309PN2022PTC207788 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RENUKA PANCHATATTVA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RENUKA PANCHATATTVA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RENUKA PANCHATATTVA?
The professionals named in the filing: Architect: Shashank Phadke; Engineer: Mayur Mansukh Manani; Engineer: Hanslal Parekh & Associates; Chartered Accountant: CA Pradnya Gandhi; Chartered Accountant: Kishor Gujar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RENUKA PANCHATATTVA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback