Home / Browse projects / Pune, Maharashtra / Amanora Arbano Towers 73,74,75 and 76
Amanora Arbano Towers 73,74,75 and 76
RG-MH-78801 · RERA P52100052019 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amanora Arbano Towers 73,74,75 and 76 is a Residential / Group Housing project by City Corporation Limited in Pune, Maharashtra, registered with MahaRERA as P52100052019 on 19 Jul 2023. Possession is promised by 31 May 2028. 823 of the 843 units on this registration are recorded sold or booked, and 24 of 44 construction stages are filed complete.
At a glance
Project
- NameAmanora Arbano Towers 73,74,75 and 76
- TypeResidential / Group Housing
- Location
- Hadapsar Kharadi Byepass road
- Amanora Park Town
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052019
- ReraGenie IDRG-MH-78801
Builder
- NameCity Corporation Limited
- Entity typeCompany
- CINU45202PN2003PLC018435
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsAniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande, Aniruddha Pradyumna Deshpande
- Other registrations12 more →
- Completed9 of 13
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Jul 2023
- Promised completion31 May 2028
- Revised completionNone
- Buildings4 building records
- Documents filed132 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 73 | NA | 36 | 33 | 291 | 0 | 291 |
| Tower 74 | NA | 36 | 33 | 194 | 0 | 194 |
| Tower 75 | NA | 36 | 33 | 131 | 0 | 131 |
| Tower 76 | NA | 36 | 33 | 227 | 0 | 227 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 64%.
Tower 7372%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 52% |
| Sanitary Fittings within the flats / premises | 26% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 51% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 24% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Tower 7476%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 29% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 53% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 53% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 37% |
Tower 7577%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 64% |
| Sanitary Fittings within the flats / premises | 29% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 59% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 57% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 38% |
Tower 7676%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 61% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 53% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 38% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 10% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 10% |
| Solid Waste Management And Disposal | Yes | 10% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | No | Not applicable |
Parking filed1080
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower 73 | 301 | 301 |
| Tower 74 | 209 | 209 |
| Tower 75 | 327 | 327 |
| Tower 76 | 243 | 243 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 76 | NA | Rs 127.26 cr | Rs 77.10 cr |
| Tower 75 | NA | Rs 117.97 cr | Rs 72.29 cr |
| Tower 74 | NA | Rs 117.72 cr | Rs 73.19 cr |
| Tower 73 | NA | Rs 112.76 cr | Rs 64.07 cr |
| - | NA | Rs 12.63 cr | Rs 34.65 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GNA Architects |
| Engineer | Mr. Ankush Mahajan |
| Engineer | RAHUL KULKARNI |
| Chartered Accountant | SPCM & Associates |
| Chartered Accountant | SPCM and Associates |
| Chartered Accountant | A S Jinturkar and Company |
| Partner | Role in project |
|---|---|
| City Corporation Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2028
Documents filed132
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 2023-35-43 R18-1-B 73-76 Form 1 2026-07-02.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form2 - Amanora Arbano Towers 73 to 76 10072026.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T73 To T76 30062026.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form1- Arbano Towers 73 to 76 02062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Form2- Arbano Towers 73 to 76 04062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: Form 3- Amanora Arbano Towers 73 to 76 05062026.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Amanora Arbano Towers 73 to 76 06052026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2- Arbano Towers 73 to 76 06052026.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T73 To T76 as on 30042026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 - ArbanoTowers 73 to 76 03042026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Arbano Towers 73 to 76- Form 2- 31032026.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Amanora Arbano Tower T73 To T76 31032026.pdf | 15 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - Arbano Towers 73 to 76 2025-26.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Amanora Arbano Towers 73 to 76 02032026.pdf | 10 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 - Amanora Arbano Towers 73 to 76 05032026.pdf | 10 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 - Amanora Arbano Towers 73 to 76 06032026.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: Arbano Towers 73 to 76 - Form 1 - 04022026.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Arbano Towers 73 to 76- Form 2- 04022026.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower 73 to 76 as on 31012026.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: Arbano Towers 73 to 76- Form 1- 02012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Arbano Towers 73 to 76- Form 2- 06012026.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower T73 To T76 as on 31122025.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Arbano Tower 073-076-as on 30112025.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 - Arbano Tower 073-076- Dated 03122025.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower73 to 76 as on 30112025.pdf | 5 Dec 2025 |
| Withdrawal Update Form 1File: Form 1- Amanora Arbano Towers 73 to 76.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form 2- Amanora Arbano Towers 73 to 76.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Amanora Arbano Tower T73 To T76 31102025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 1File: Form1 - Arbano Towers - 73 to 76.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form2 - Arbano Towers - 73 to 76.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Arbano Towers - 73 to 76.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Arbano Tower 73 to 76 31-03-2025.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: T73-76-Withdrawal Application Form1 01092025.pdf | 12 Sep 2025 |
| Withdrawal Update Form 2File: T73-76 Withdrawal Application Form2 31082025.pdf | 12 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 Amanora Arbano Tower T73 To T76 31-08-2025.pdf | 12 Sep 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Arbano Tower- T73 to T76.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T73 To T76 31-03-2025.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73 to 76 31032025.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73, 74, 75 and 76- 31032025.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T73 To T76 31122024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73 74 75 and 76-31122024.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73 74 75 and 76- 31122024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73 74 75 and 76 30062024.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3_Amanora Arbano Tower T73 To T76 30-09-2024.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73, 74, 75 and 76 30092024.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arbano 73-76 Form-5.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T73 To T76 30-09-2024.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73 74 75 and 76 30092024.pdf | 9 Oct 2024 |
| Layout approvalFile: 2.pdf | 14 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 14 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter - R18.pdf | 14 Aug 2024 |
| Declaration about Commencement CertificateFile: Final Letterhead DECLARATION ABOUT COMMENCEMNT CERTIFICATE Amanora Arbano Towers 73 to 76. | 14 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Arbano Towers 73 to 76 Disclosure of Inventory 30062024.pdf | 10 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower (T73 To T76) 30062024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73, 74, 75 and 76 30062024.pdf | 8 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T73 To T76 31032024.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A- Amanora Arbano Tower 73, 74, 75 and 76- 31032024.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73, 74, 75 and 76 31032024.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Amanora Arbano Tower 73, 74, 75 and 76- 31032024.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Arbano Tower 73, 74, 75 and 76- 31032024.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Amanora Arbano Tower 73, 74, 75 and 76- 31032024.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73, 74, 75 and 76 31032024.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Amanora Arbano Tower T73 To T76 31122023.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73 74 75 and 76 - 3112023.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73, 74, 75 and 76 - 31122023.pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arbano 73 to 76_30092023.pdf | 11 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Amanora Arbano Towers 73, 74, 75 and 76 (2)- 30092023.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Amanora Arbano Towers 73, 74, 75 and 76 (2)-30092023.pdf | 18 Oct 2023 |
| Proforma of Agreement for saleFile: Final Agreement to Lease Arbano Towers 73 to 76 14072023.pdf | 14 Jul 2023 |
| Proforma of Agreement for saleFile: Final Deed of Lease Arbano Towers 73 to 76 14072023.pdf | 14 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Final Deviation report with Agreement to Lease Amanora Arbano Towers 73 to 76 14072023.pdf | 14 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Final Finance Encumbrance Amanora Arbano Towers 73 to 76.pdf | 13 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Final Finance Encumbrance Amanora Arbano Towers 73 to 76.pdf | 13 Jul 2023 |
| CERSAI detailsFile: Final CERSAI Encumbrance Amanora Arbano Towers 73 to 76.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Aniruddha Deshpande.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Aditya Deshpande.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Bimal Parekh.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Jagdish Deshpande.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Lalit Adani.pdf | 13 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Neelam Pipada.pdf | 13 Jul 2023 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Amanora Ascent Towers 48 and 49P52100030032 | Amanora Park Town, Pune | - | Jul 2021 | Completed | Sep 2025 | Oct 2024 |
| Amanora Gold Towers 44, 45 and 46P52100017962 | Amanora Park Town, Pune | - | Oct 2018 | Completed | May 2024 | May 2024 |
| Amanora Gold Towers 42 and 43P52100017612 | Amanora Park Town, Pune | - | Aug 2018 | Completed | Dec 2023 | Jun 2023 |
| Amanora Gateway Tower 100P52100000380 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Apr 2022Registered original: Apr 2020 | Apr 2022 |
| Amanora Adreno TowersP52100001822 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Mar 2022 | Jan 2022 |
| Amanora Gateway Towers 98 and 99P52100000321 | Amanora Park Town, Pune | - | Jul 2017 | Completed | Dec 2018 | Dec 2018 |
| Amanora Future Tower, Sector R11 | Sector R11 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 1,117 | - | Completed | Mar 2017 | Feb 2017 |
| Amanora Aspire Towers, Sector R3 | Plot No 68 Sector R3 Amanora Park Town Hadapsar Kharadi Bypass Hadapsar Pune 411028 | 400 | - | Completed | Nov 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 132 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Amanora Arbano Towers 73,74,75 and 76 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amanora Park Town13,700+ in Pune
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Amanora Gateway Towers 2 - Towers 102 and 103
City Corporation Limited
Builder: City Corporation Limited
City Corporation Limited has 13 registrations on MahaRERA, including Amanora Gateway Towers 98 and 99 and Amanora Gateway Tower 100. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Amanora Arbano Towers 73,74,75 and 76 is delayed beyond 31 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amanora Arbano Towers 73,74,75 and 76?
The registered promoter entity is City Corporation Limited, a company as per the filing. Its CIN U45202PN2003PLC018435 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amanora Arbano Towers 73,74,75 and 76?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Amanora Arbano Towers 73,74,75 and 76?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amanora Arbano Towers 73,74,75 and 76?
The professionals named in the filing: Architect: GNA Architects; Engineer: Mr. Ankush Mahajan; Engineer: RAHUL KULKARNI; Chartered Accountant: SPCM & Associates; Chartered Accountant: SPCM and Associates; Chartered Accountant: A S Jinturkar and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amanora Arbano Towers 73,74,75 and 76?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback