Registered No litigation declared Others project

TANISH PARK

By TANISH DEVELOPERS

RG-MH-22245 · RERA P52100030766 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
112 of 126Construction stages doneacross 12 buildings; furthest along: Sanitary Fittings within the flats /..., 94%
64 of 1,682Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

TANISH PARK is a Others project by TANISH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100030766 on 13 Sep 2021. Possession is promised by 31 Dec 2027. 1,618 of the 1,682 units on this registration are recorded sold or booked, and 112 of 126 construction stages are filed complete.

At a glance

Project

  • NameTANISH PARK
  • TypeOthers
  • Location
    • CHARHOLI
    • Charoli
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030766
  • ReraGenie IDRG-MH-22245

Builder

  • NameTANISH DEVELOPERS
  • Entity typePartnership
  • PartnersSHRANIK DHANRAJ PARMAR, RAJU MOHANLAL MEHTA
  • PartnerDILIP SHANTILAL SOLANKI
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Sep 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings12 building records
  • Documents filed103 files

Current status

96%1618 of 1,682 units booked
100.0%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TANISH PARK ANA17141660166
TANISH PARK BNA17141660166
TANISH PARK CNA17141660166
TANISH PARK DNA17141660166
TANISH PARK ENA171416610176
TANISH PARK FNA17141660166
TANISH PARK GNA17141660166
TANISH PARK HNA17141660166
TANISH PARK INA17141660166
TANISH PARK JNA19161580158
WING K1NA1101010
WING K2NA1101010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building12

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

112 of 126 construction stages are filed complete across 12 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 94%.

TANISH PARK A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK I100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TANISH PARK J98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises94%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks94%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
WING K144%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING K244%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,228
Closed/Covered964
Open Space2,223
Stilt / Ground41
BuildingClosed/CoveredOpen SpaceStilt / GroundTotal
TANISH PARK A861810267
TANISH PARK B932500343
TANISH PARK C932440337
TANISH PARK D932430336
TANISH PARK E702420312
TANISH PARK F912530344
TANISH PARK G932430336
TANISH PARK H932470340
TANISH PARK I841840268
TANISH PARK J1681360304
WING K1002121
WING K2002020

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area30,904 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI111733.53
Proposed, not sanctioned111,734 sq m
Buildings approved13
Buildings sanctioned12

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAKURDI PRADHIKARAN PUNE 411044
Estimated costRs 321.24 cr
Cost incurredRs 321.18 cr
Work done99.98%
BuildingWingEstimatedIncurred
TANISH PARK JNARs 38.84 crRs 38.84 cr
TANISH PARK ANARs 31.36 crRs 31.36 cr
TANISH PARK BNARs 31.36 crRs 31.36 cr
TANISH PARK CNARs 31.36 crRs 31.36 cr
TANISH PARK DNARs 31.36 crRs 31.36 cr
TANISH PARK ENARs 31.36 crRs 31.36 cr
TANISH PARK FNARs 31.36 crRs 31.36 cr
TANISH PARK GNARs 31.36 crRs 31.36 cr
TANISH PARK HNARs 31.36 crRs 31.36 cr
TANISH PARK INARs 31.36 crRs 31.36 cr
WING K1NARs 6.00 lakhRs 3.00 lakh
WING K2NARs 6.00 lakhRs 3.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDREAM SPACE ARCHITECTS
ArchitectMAHENDRA THAKUR
EngineerSATISH DESHPANDE
EngineerRK RANDHAVE
EngineerRAVINDRA DISALE
Chartered AccountantPGMJ and ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
TANISH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 Final.pdf17 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 Final.pdf17 Jun 2026
Form 5 (FY 2022-2023)File: Form-5 Signed.pdf16 Jun 2026
Layout approvalFile: Layout Approval.pdf28 May 2026
Building plan approvalFile: Sanction Plan 1.pdf28 May 2026
Building plan approvalFile: Sanction Plan 2.pdf28 May 2026
Building plan approvalFile: Sanction Plan 3.pdf28 May 2026
Building plan approvalFile: Sanction Plan 4.pdf28 May 2026
Building plan approvalFile: Sanction Plan 5.pdf28 May 2026
Building plan approvalFile: Sanction Plan 6.pdf28 May 2026
Building plan approvalFile: Sanction Plan 7.pdf28 May 2026
Withdrawal Update Form 1File: FORM 1 FINAL.pdf26 May 2026
Withdrawal Update Form 1File: FORM 1.pdf26 May 2026
Withdrawal Update Form 1File: FORM 1.pdf26 May 2026
Withdrawal Update Form 1File: FORM 1.pdf26 May 2026
Withdrawal Update Form 2File: FORM 2 FINAL.pdf26 May 2026
Withdrawal Update Form 2File: FORM 2.pdf26 May 2026
Withdrawal Update Form 2File: FORM 2.pdf26 May 2026
Withdrawal Update Form 2File: FORM 2.pdf26 May 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf26 May 2026
Withdrawal Update Form 3File: FORM 3.pdf26 May 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf26 May 2026
Withdrawal Update Form 3File: FORM 3.pdf26 May 2026
Form 1File: FORM 1.pdf25 May 2026
Form 2File: FORM 2.pdf25 May 2026
Form 3File: FORM 3.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR.pdf25 May 2026
Form 1File: FORM 1.pdf25 May 2026
Form 2File: FORM 2.pdf25 May 2026
Form 3File: FORM 3.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR.pdf25 May 2026
Form 2A (FY 2022-2023)File: Form 2A Final 2023.pdf8 May 2026
Form 2A (FY 2023-2024)File: Form 2A Final 2024.pdf8 May 2026
Form 2A (FY 2024-2025)File: Form 2A Final 2025.pdf8 May 2026
Form 2A (FY 2025-2026)File: Form 2A Final 2026.pdf8 May 2026
Layout approvalFile: Layout Upload.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 1.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 2.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 3.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 4.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 5.pdf12 Sep 2025
Building plan approvalFile: Sanction Plan 6.pdf12 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Jun 2023_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Sep 2024_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Jun 2024_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Mar 2024_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Dec 2023_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Sep 2023_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Mar 2023_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Jun 2022_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Dec 2021_11zon.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tanish Park F3 Sep 2021_11zon.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 PARK ARCHITECT 30 03 23.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 PARK ARCHITECT 30 06 23.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 PARK ARCHITECT 30 09 23.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 PARK ARCHITECT 30 12 23.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 PARK ARCHITECT 30 03 24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 PARK ARCHITECT 30 06 24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 ENGINEERS CERTIFICATE 29 03 2023.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 ENGINEERS CERTIFICATE 28 06 2023.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 ENGINEERS CERTIFICATE 29 09 2023.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 ENGINEERS CERTIFICATE 29 12 2023.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 ENGINEERS CERTIFICATE 29 03 2024.pdf25 Oct 2024
Layout approvalFile: PARK PLAN.pdf9 Oct 2024
Copy of Layout Approval (in case of layout)File: PARK PLAN.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 21.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 21.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR 22.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUN 22.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 22.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 22.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1.pdf24 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Tanish Park 2021-22.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 27-09-2021.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 28-03-2022.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 28-12-2021.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 30-06-2022.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 30-09-2022.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC 31-12-2022.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned_compressed-1-3.pdf3 Sep 2021

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANISH PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

2 kmTANISH PARKCompleted 57Lapsed / revoked 21Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: TANISH DEVELOPERS

TANISH DEVELOPERS has 8 registrations on MahaRERA, including TANISH SANKALP and Tanish Bhakti. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TANISH PARK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANISH PARK?

The registered promoter entity is TANISH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANISH PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANISH PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANISH PARK?

The professionals named in the filing: Architect: DREAM SPACE ARCHITECTS; Architect: MAHENDRA THAKUR; Engineer: SATISH DESHPANDE; Engineer: RK RANDHAVE; Engineer: RAVINDRA DISALE; Chartered Accountant: PGMJ and ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANISH PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANISH PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANISH PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.