ReraGenieLog inGet a buyer report

Home / Areas / Nashik

New projects and RERA data in Nashik district, Maharashtra

4172 projects are registered in Nashik district: 74,846 units across them, 210 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

4172Projects covered
210Registered, last 12 months
74,846Units declared
52,655Units not yet booked
437Completion dates revised
17With declared litigation

Of the 4172 covered registrations, 437 have revised their promised completion date and 17 declare litigation. The median project here is 17% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Free · a new edition every month

Nashik monthly RERA report

What registered month by month, this city against its own twelve-month run and against the other six, with the possession pipeline, the taluka split and the busiest pincodes. Built from the same filings as this page.

September 2026: 20 new registrations, 883 homes and units.

When Nashik projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 4,171 projects with a promised date, 2,286 are recorded delivered, 1,090 are still on the register and 795 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

02505007501,000today2017: 40 projects, delivered2017: 2 projects, registration lapsed or cancelled’172018: 176 projects, delivered2018: 8 projects, registration lapsed or cancelled’182019: 172 projects, delivered2019: 28 projects, registration lapsed or cancelled’192020: 105 projects, delivered2020: 33 projects, registration lapsed or cancelled’202021: 96 projects, delivered2021: 20 projects, registration lapsed or cancelled’212022: 186 projects, delivered2022: 78 projects, registration lapsed or cancelled’222023: 351 projects, delivered2023: 134 projects, registration lapsed or cancelled’232024: 451 projects, delivered2024: 153 projects, registration lapsed or cancelled’242025: 356 projects, delivered2025: 230 projects, registration lapsed or cancelled’252026: 248 projects, delivered2026: 245 projects, on the register2026: 100 projects, registration lapsed or cancelled’262027: 74 projects, delivered2027: 312 projects, on the register2027: 5 projects, registration lapsed or cancelled’272028: 22 projects, delivered2028: 219 projects, on the register2028: 3 projects, registration lapsed or cancelled’282029: 4 projects, delivered2029: 157 projects, on the register2029: 1 projects, registration lapsed or cancelled’292030: 3 projects, delivered2030: 104 projects, on the register’302031: 1 projects, delivered2031: 27 projects, on the register’312032: 1 projects, delivered2032: 20 projects, on the register’322033: 5 projects, on the register’332035: 1 projects, on the register’35

1,552 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05,00010k15k20ktoday’172018: 89 flats, delivered (only 4 of 184 projects filed a flat count)’182019: 53 flats, delivered (only 3 of 200 projects filed a flat count)2019: 50 flats, registration lapsed or cancelled (only 3 of 200 projects filed a flat count)’192020: 16 flats, delivered (only 1 of 138 projects filed a flat count)’202021: 82 flats, delivered (only 3 of 116 projects filed a flat count)’212022: 462 flats, delivered (only 14 of 264 projects filed a flat count)2022: 87 flats, registration lapsed or cancelled (only 14 of 264 projects filed a flat count)’222023: 706 flats, delivered (only 16 of 485 projects filed a flat count)2023: 311 flats, registration lapsed or cancelled (only 16 of 485 projects filed a flat count)’232024: 491 flats, delivered (only 31 of 604 projects filed a flat count)2024: 931 flats, registration lapsed or cancelled (only 31 of 604 projects filed a flat count)’242025: 4,084 flats, delivered (only 104 of 586 projects filed a flat count)2025: 2,806 flats, registration lapsed or cancelled (only 104 of 586 projects filed a flat count)’252026: 2,342 flats, delivered (only 258 of 593 projects filed a flat count)2026: 9,834 flats, on the register (only 258 of 593 projects filed a flat count)2026: 1,922 flats, registration lapsed or cancelled (only 258 of 593 projects filed a flat count)’262027: 1,405 flats, delivered2027: 13,867 flats, on the register’272028: 636 flats, delivered2028: 13,716 flats, on the register’282029: 58 flats, delivered2029: 9,336 flats, on the register2029: 56 flats, registration lapsed or cancelled’292030: 196 flats, delivered2030: 6,169 flats, on the register’302031: 23 flats, delivered2031: 1,684 flats, on the register’312032: 2,547 flats, on the register’322033: 803 flats, on the register’332035: 84 flats, on the register’35

64,678 flats are promised in 2026 or later, across the 64% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Nashik possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 437 of 4,171 projects (10%) have moved at least once; the median move is 17 months and the longest is 153 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

02505007501,000Originally due 2017: 42 projects kept the original date, 78% of the yearOriginally due 2017: 10 projects moved by under 2 years, 19% of the yearOriginally due 2017: 2 projects moved by 2 years or more, 4% of the year’17Originally due 2018: 170 projects kept the original date, 71% of the yearOriginally due 2018: 43 projects moved by under 2 years, 18% of the yearOriginally due 2018: 28 projects moved by 2 years or more, 12% of the year’18Originally due 2019: 168 projects kept the original date, 79% of the yearOriginally due 2019: 13 projects moved by under 2 years, 6% of the yearOriginally due 2019: 33 projects moved by 2 years or more, 15% of the year’19Originally due 2020: 114 projects kept the original date, 86% of the yearOriginally due 2020: 9 projects moved by under 2 years, 7% of the yearOriginally due 2020: 9 projects moved by 2 years or more, 7% of the year’20Originally due 2021: 98 projects kept the original date, 78% of the yearOriginally due 2021: 7 projects moved by under 2 years, 6% of the yearOriginally due 2021: 21 projects moved by 2 years or more, 17% of the year’21Originally due 2022: 238 projects kept the original date, 91% of the yearOriginally due 2022: 10 projects moved by under 2 years, 4% of the yearOriginally due 2022: 13 projects moved by 2 years or more, 5% of the year’22Originally due 2023: 454 projects kept the original date, 93% of the yearOriginally due 2023: 15 projects moved by under 2 years, 3% of the yearOriginally due 2023: 18 projects moved by 2 years or more, 4% of the year’23Originally due 2024: 569 projects kept the original date, 89% of the yearOriginally due 2024: 40 projects moved by under 2 years, 6% of the yearOriginally due 2024: 29 projects moved by 2 years or more, 5% of the year’24Originally due 2025: 531 projects kept the original date, 86% of the yearOriginally due 2025: 76 projects moved by under 2 years, 12% of the yearOriginally due 2025: 12 projects moved by 2 years or more, 2% of the year’25Originally due 2026: 481 projects kept the original date, 94% of the yearOriginally due 2026: 22 projects moved by under 2 years, 4% of the yearOriginally due 2026: 10 projects moved by 2 years or more, 2% of the year’26Originally due 2027: 343 projects kept the original date, 98% of the yearOriginally due 2027: 3 projects moved by under 2 years, 1% of the yearOriginally due 2027: 3 projects moved by 2 years or more, 1% of the year’27Originally due 2028: 226 projects kept the original date, 97% of the yearOriginally due 2028: 6 projects moved by under 2 years, 3% of the year’28Originally due 2029: 148 projects kept the original date, 99% of the yearOriginally due 2029: 1 projects moved by under 2 years, 1% of the year’29Originally due 2030: 101 projects kept the original date, 97% of the yearOriginally due 2030: 3 projects moved by under 2 years, 3% of the year’30Originally due 2031: 26 projects kept the original date, 100% of the year’31Originally due 2032: 20 projects kept the original date, 95% of the yearOriginally due 2032: 1 projects moved by under 2 years, 5% of the year’32Originally due 2033: 4 projects kept the original date, 100% of the year’33Originally due 2035: 1 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05,00010k15k20kOriginally due 2017: 12 flats moved by under 2 years, 19% of the year (only 1 of 54 projects filed a flat count)’17Originally due 2018: 77 flats kept the original date, 71% of the year (only 3 of 241 projects filed a flat count)’18Originally due 2019: 103 flats kept the original date, 79% of the year (only 12 of 214 projects filed a flat count)Originally due 2019: 614 flats moved by 2 years or more, 15% of the year (only 12 of 214 projects filed a flat count)’19Originally due 2020: 16 flats kept the original date, 86% of the year (only 4 of 132 projects filed a flat count)Originally due 2020: 262 flats moved by 2 years or more, 7% of the year (only 4 of 132 projects filed a flat count)’20Originally due 2021: 82 flats kept the original date, 78% of the year (only 8 of 126 projects filed a flat count)Originally due 2021: 456 flats moved by 2 years or more, 17% of the year (only 8 of 126 projects filed a flat count)’21Originally due 2022: 537 flats kept the original date, 91% of the year (only 22 of 261 projects filed a flat count)Originally due 2022: 51 flats moved by under 2 years, 4% of the year (only 22 of 261 projects filed a flat count)Originally due 2022: 782 flats moved by 2 years or more, 5% of the year (only 22 of 261 projects filed a flat count)’22Originally due 2023: 857 flats kept the original date, 93% of the year (only 28 of 487 projects filed a flat count)Originally due 2023: 57 flats moved by under 2 years, 3% of the year (only 28 of 487 projects filed a flat count)Originally due 2023: 1,164 flats moved by 2 years or more, 4% of the year (only 28 of 487 projects filed a flat count)’23Originally due 2024: 955 flats kept the original date, 89% of the year (only 69 of 638 projects filed a flat count)Originally due 2024: 1,303 flats moved by under 2 years, 6% of the year (only 69 of 638 projects filed a flat count)Originally due 2024: 1,216 flats moved by 2 years or more, 5% of the year (only 69 of 638 projects filed a flat count)’24Originally due 2025: 5,131 flats kept the original date, 86% of the year (only 157 of 619 projects filed a flat count)Originally due 2025: 4,773 flats moved by under 2 years, 12% of the year (only 157 of 619 projects filed a flat count)Originally due 2025: 1,128 flats moved by 2 years or more, 2% of the year (only 157 of 619 projects filed a flat count)’25Originally due 2026: 7,542 flats kept the original date, 94% of the year (only 195 of 513 projects filed a flat count)Originally due 2026: 1,560 flats moved by under 2 years, 4% of the year (only 195 of 513 projects filed a flat count)Originally due 2026: 1,157 flats moved by 2 years or more, 2% of the year (only 195 of 513 projects filed a flat count)’26Originally due 2027: 12,562 flats kept the original date, 98% of the yearOriginally due 2027: 1,135 flats moved by under 2 years, 1% of the yearOriginally due 2027: 389 flats moved by 2 years or more, 1% of the year’27Originally due 2028: 11,517 flats kept the original date, 97% of the yearOriginally due 2028: 415 flats moved by under 2 years, 3% of the year’28Originally due 2029: 7,738 flats kept the original date, 99% of the yearOriginally due 2029: 36 flats moved by under 2 years, 1% of the year’29Originally due 2030: 5,995 flats kept the original date, 97% of the yearOriginally due 2030: 148 flats moved by under 2 years, 3% of the year’30Originally due 2031: 1,642 flats kept the original date, 100% of the year’31Originally due 2032: 2,547 flats kept the original date, 95% of the yearOriginally due 2032: 64 flats moved by under 2 years, 5% of the year’32Originally due 2033: 739 flats kept the original date, 100% of the year’33Originally due 2035: 84 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Nashik

Who sanctions building in Nashik

1,163 of the 4,172 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Nashik Municipal Corporation920
84 other bodies243

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 4,172 registrations on this page answers this: on 2,691 the promoter is the only owner named; on 1,338 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 143 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Nashik: projects by taluka

4,172 of the 4,172 registrations on this page name their taluka.

TalukaProjectsShare
Nashik3,89793%
12 other talukas2757%

Projects in Nashik

Showing 1 to 60 of 4,172 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
SHREE SATYANARAYAN ROONGTA FORUMNASHIK, 422010ROONGTA HOMES LLP100982%4 Dec 2020Completed
LIFE 360PATHARDI SHIWAR, 422010VELOCITY INFRA PROJECTS98524%31 Jul 2023Registered
THE PLATINUM MALL BY PARKSYDEPANCHWATI ANNEX, 422003JAIKUMAR CONSTRUCTIONS LTD75653%5 Oct 2023Registered
GLOBAL VILLEMORADE MALA, 422004SHRADDHA INFRA70025%29 Aug 2022Registered
AVADH UTOPIAMAKHMALABAD ROAD PANCHVATI, 422003DHATRAK CONSTRUWELL53447%21 Oct 2020Registered
Samraat AmOzonSerene Meadows, 422013M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.52875%2 Dec 2019Completed
The ExchangeNear Durga Garden, Besides NMC Building, Deolali, 422101Viraj Estates Pvt. Ltd. & Others51433%12 Nov 2021Completed
PEACOCK HILLSMHASRUL, 422004PEACOCK HILLS BUILDTECH LLP5130%23 Mar 2020Completed
Jivan Ganga Phase IINagare Mala, Pimpalgaon Bahula, 422213S & O Infra50114%1 Dec 2022Registered
ARYAN'S LIFEONEAMBAD KURD, 422010SHREE ARYAN BUILDERS AND DEVELOPERS4619%25 Jul 2025Registered
HARI SANSKRUTI PHASE IINashik, 422101KBC GLOBAL LIMITED41858%18 Jul 2017Registration lapsed
ARRPAN HOUSINGVIHITGAON, 422101A C JAIN BUILDERS AND DEVELOPERS LLP41567%9 Oct 2019Registered
Meru HeritageVihitgaon, 422401Amit Builders and Developers36622%29 Nov 2024Registered
STAR WORLDGOVIND NAGAR, 422009DEEPAK KALYANJI CHANDE36660%1 Sep 2021Registered
ROONGTA ELEGANTE APARTMENTNASHIK, 422003ROONGTA LANDMARKS LLP36240%14 Mar 2022Completed
LOTUS CAPITALASHOK STAMBH, 422001BORA REALTY LLP36054%22 Feb 2022Registration lapsed
SHREEJI EXCELENCIASERENE MEADOWS, 422005SHREEJI DEVELOPERS35681%21 Oct 2020Completed
Siddhivinayak Trade CenterNashik, 422003Dhatrak Constructions35640%20 Sep 2021Registered
VRAJ CENTRAL VISTARajiv Nagar, 422009DHAIRYA DEVELOPERS35633%24 Jan 2023Registered
G SQUAREVRINDAVAN NAGAR, ADGAON SHIVAR, 422003GIRI ASSOCIATE CONSTRUCTION35322%12 Aug 2020Registered
ROONGTA TECHONE APARTMENTRD CIRCLE, 422009SHREE TIRUMALA BUILDCON3480%23 Feb 2026Registered
SUNFLOWER CITYNEAR PATHARDI CIRCLE, 422010DEEPAK KALYANJI CHANDE33955%22 Feb 2021Registered
VRAJ CAPITALNEAR SAMARTH HOSPITAL, 422009KAPILAVASTU CREATORS33114%10 Nov 2023Registered
Shilpa MadhuvanNashik Road East, 422101Shilpa Estate32613%26 Sep 2022Registered
ELYSIANNirmala Convent Road, 422013ROONGTA HOMES LLP31323%2 Feb 2024Registered
SHREE KALIKA PLAZAOPPOSITE KALIKA MANDIR,NASHIK, 422001DEEPAK KALYANJI CHANDE30550%20 Dec 2019Registered
Anandvan Housing ComplexVithoba Nagar, 422011Ravi Mahajan Buildcon LLP29166%14 Jan 2020Registered
BHAGYALAXMI PLAZASATANA, 423301BHARAT PROPERTIES2906%15 Dec 2025Registered
HAPPY LIFE AT APNA GHAR PHASE IIINASHIK, 422013M/S Shweta Infrastructure & Housing (I) Pvt. Ltd.2808%7 Oct 2024Registered
STAR PLUS BNASHIK ROAD, 422101DEEPAK KALYANJI CHANDE27647%15 Jun 2022Registered
MAA BHAGWATI RESIDENCY APARTMENTNASHIK, 422009ROONGTA LANDMARKS LLP26625%8 Mar 2022Registered
SIGNIFICANTWADALA, 422006IND DEVELOPERS26656%14 Jan 2021Registered
SADGURU HOMESHIRAWADI, 422003SHREE SADGURU HOMES26546%9 Sep 2019Registered
SKY ONENEAR MASOBA MANDIR, 422101OM SAI OM BUILDERS26525%9 Nov 2021Registered
THREE LEAVES PHASE ONEGOVIND NAGAR, 422009DEEPAK INFRA AND HOMES PRIVATE LIMITED25647%21 Nov 2022Registered
Shilpa SolitaireNear Hotel Red Rose, 422003Shilpa Estate2540%23 Jul 2024Registered
SHYAM ANANTANashik Shiwar Rane Nagar Indira Nagar, 422009SHREE SHYAM INFRA25443%31 May 2024Registered
ATTAL HIGHSTREET PHASE AYEOLA, 423401ATTAL BUILDERS2520%29 Feb 2024Registered
Laxminarayan HeavenWarkarai Chowk, Opposite SSK World Club, Pathardi, 422010Sahajanand Builders And Developers24644%21 Feb 2024Registered
SHREEJI INFINIANear Metro Mall, 422011SHREEJI LIFE SPACE24251%8 Nov 2021Completed
ARIHANT BUSINESS CENTERPimpalgaon Baswant, 422209BHANDARI INFRA2400%1 Jul 2026Registered
Shreeji CelestiaNashik, 422001SHREEJI LIFE SPACE23872%20 Apr 2022Registered
Shreeji The CrownNear Prakash Petrol Pump, 422009SHREEJI LIFE SPACE23035%11 Apr 2022Registered
The Northland by Madhu VitthalMhasrul, 422004Northland Realty22921%17 Jan 2023Registered
Neelkamal Sarita Phase 2Next to Unnati School, 422202Shree Neelkamal Housing & Infrastructure2240%6 Jun 2022Registration lapsed
Neelkamal Sarita Phase 3Next to Unnati School, 422202Shree Neelkamal Housing & Infrastructure2244%31 Jan 2024Registered
Flora AvenueAdhav Nagar, 422101Unity Developers22231%8 Sep 2021Registration lapsed
JEEVAN BAUGMOTIWALA NAGAR, 422222DIVINE BUILDERS22058%19 Sep 2019Registration lapsed
ANANDGRAMNEAR TARWALA NAGAR OPP SHIVNAGAR JOGGING TRACK AND SPORT GROUND PANCHAVATI NASHIK, 422004MAP INFRA21850%23 Jun 2023Registered
SWASTIK MANGAL APARTMENTKAMATWADE, 422010SHREEMANGAL CONSTRUCTION21858%13 Jul 2023Registered
Mahalaxmi City CentrePanchvati, 422003Metro Properties21515%24 Jan 2023Registered
SHREE GANESH SRUSHTISatpur, 422007JYK NIRMITI INFRA LLP2100%16 Oct 2025Registered
VRINDAVAN DHAMNASHIK, 422010RAJMUDRA CONSTRUCTIONS21046%3 Feb 2023Registered
DAKSH SKYWAYGangapur Road, 422222R K CONSTRUCTION20517%10 Jan 2023Registered
HARI VASANTGANGAPUR ROAD, 422005Hari Vasant Association of Allottees20445%18 Jul 2017Registered
NATHSEETA YEOLEKAR COMPLEXBEHIND EASY DAY MALL, 422005DEEPAK INFRA AND HOMES PRIVATE LIMITED20438%29 Sep 2021Registered
SAI ANAND PRIDE-BNEAR NAVJIVAN SCHOOL, 422103DEEPAK KALYANJI CHANDE20113%29 Jul 2020Registered
Shivalik SkygreenDnyaneshwar Nagar, Pathardi Phata, 422010Yogeshwar Realty19847%3 Feb 2022Registered
Quillion Residencies at Quillion Park - Phase 2Govind Nagar, 422009Viraj Estates Private Limited1960%1 Oct 2026Registered
Waterwaystapovan road, 422011Sanklecha Construction Private Limited19260%19 Aug 2017Registered
Planning a launch in Nashik? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Nashik

ROONGTA HOMES LLP (26), SUN INFRASTRUCTURES PVT LTD (24), KBC GLOBAL LIMITED (20), Jay Developers (18), M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. (15), Sanklecha Construction Private Limited (12). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Nashik projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 17% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Nashik project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Nashik district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Nashik registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Nashik project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Nashik district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.