Ray Nagar Housing Project Phase 2

By Vasant Vihar Realty Pvt Ltd

RG-MH-36762 · RERA P52600017956 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
1108 of 4686Construction stages doneacross 427 buildings; furthest along: Slabs of Super Structure, 83%
7,463 of 7,882Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 205 documents Report an error

Ray Nagar Housing Project Phase 2 is a Mixed project by Vasant Vihar Realty Pvt Ltd in Solapur, Maharashtra, registered with MahaRERA as P52600017956 on 28 Sep 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 419 of the 7,882 units on this registration are recorded sold or booked, and 1108 of 4686 construction stages are filed complete.

At a glance

Project

  • NameRay Nagar Housing Project Phase 2
  • TypeMixed
  • Location
    • KUMBHARI TO DARGANHALLI ROAD
    • Kumbhari
    • Solapur South
    • Solapur
    • 413007
  • Pincode413007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600017956
  • ReraGenie IDRG-MH-36762

Builder

  • NameVasant Vihar Realty Pvt Ltd
  • Entity typeCompany
  • DirectorNILIMA ANIL JADHAV
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredSep 2018First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Sep 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
  • Buildings426 building records
  • Documents filed205 files

Current status

5%419 of 7,882 units booked

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gat No-845/7, Bldg No-1NA3036036
Gat No-845/7, Bldg No-2NA3036036
Gat No-845/7, Bldg No-3NA3036036
Gat No-845/7, Bldg No-4NA3036036
Gat No-845/7, Bldg No-5NA3036036
Gat No-845/7, Bldg No-6NA3036036
Gat No-845/7, Bldg No-7NA3036036
Gat No-1039/4, 1041/1, Bldg No-1NA3036036
Gat No-1039/4, 1041/1, Bldg No-2NA3036036
Gat No-1039/4, 1041/1, Bldg No-3NA3036036
Gat No-1039/4, 1041/1, Bldg No-4NA3036036
Gat No-1039/4, 1041/1, Bldg No-5NA3036036
Gat No-1039/4, 1041/1, Bldg No-6NA3036036
Gat No-1039/4, 1041/1, Bldg No-7NA3036036
Gat No-1039/4, 1041/1, Bldg No-8NA3036036
Gat No-1039/4, 1041/1, Bldg No-9NA3036036
Gat No-1039/4, 1041/1 Bldg No-10NA3036036
Gat No-1039/4, 1041/1, Bldg No-11NA3036036
Gat No-1039/4, 1041/1, Bldg No-12NA3036036
Gat No-1039/4, 1041/1, Bldg No-13NA3036036
Gat No-1039/4, 1041/1, Bldg No-14NA3036036
Gat No-1039/4, 1041/1, Bldg No-15NA6036036
Gat No-1039/4, 1041/1, Bldg No-16NA3036036
Gat No-1039/4, 1041/1, Bldg No-17NA3036036
Gat No-1039/4, 1041/1, Bldg No-18NA3036036
Gat No-1039/4, 1041/1, Bldg No-19NA3036036
Gat No-1038/A/6, Bldg No-1NA3336036
Gat No-1038/A/6, Bldg No-2NA3036036
Gat No-1038/A/6, Bldg No-3NA3036036
Gat No-1038/A/6, Bldg No-4NA3036036
Gat No-1038/A/6, Bldg No-5NA3036036
Gat No-1038/A/6, Bldg No-6NA3036036
Gat No-1038/A/6, Bldg No-7NA3036036
Gat No-1038/A/6, Bldg No-8NA3036036
Gat No-1038/A/6, Bldg No-9NA3036036
Gat No-1038/A/6, Bldg No-10NA3036036
Gat No-1038/A/6, Bldg No-11NA3036036
Gat No-1038/A/6, Bldg No-12NA3036036
Gat No-1038/A/6, Bldg No-13NA3036036
Gat No-1038/A/6, Bldg No-14NA3036036
Gat No-58/1, Bldg No-1NA3336036
Gat No-58/1, Bldg No-2NA3336036
Gat No-58/1, Bldg No-3NA3036036
Gat No-58/1, Bldg No-4NA3036036
Gat No-58/1, Bldg No-5NA3036036
Gat No-58/1, Bldg No-6NA3036036
Gat No-58/1, Bldg No-7NA3036036
Gat No-58/1, Bldg No-8NA3036036
Gat No-58/1, Bldg No-9NA3036036
Gat No-58/1, Bldg No-10NA3036036
Gat No-58/1, Bldg No-11NA3036036
Gat No-58/1, Bldg No-12NA3036036
Gat No-59, Bldg No-1NA3036036
Gat No-59, Bldg No-2NA3036036
Gat No-59, Bldg No-3NA3036036
Gat No-59, Bldg No-4NA3036036
Gat No-59, Bldg No-5NA3036036
Gat No-59, Bldg No-6NA3036036
Gat No-59, Bldg No-7NA3036036
Gat No-59, Bldg No-8NA3036036
Gat No-59, Bldg No-9NA3036036
Gat No-59, Bldg No-10NA3036036
Gat No-59, Bldg No-11NA3036036
Gat No-985/1, Bldg No-1NA3036036
Gat No-985/1, Bldg No-2NA3036036
Gat No-985/1, Bldg No-3NA3036036
Gat No-985/1, Bldg No-4NA3036036
Gat No-985/1, Bldg No-5NA3036036
Gat No-985/1, Bldg No-6NA3036036
Gat No-985/1, Bldg No-7NA3036036
Gat No-985/1, Bldg No-8NA3036036
Gat No-985/1, Bldg No-9NA3036036
Gat No-985/1, Bldg No-10NA3036036
Gat No-985/1, Bldg No-11NA3036036
Gat No-985/1, Bldg No-12NA3036036
Gat No-985/1, Bldg No-13NA3036036
Gat No-985/1, Bldg No-14NA3036036
Gat No-985/1, Bldg No-15NA3036036
Gat No-985/2, Bldg No-1NA3036036
Gat No-985/2, Bldg No-2NA3036036
Gat No-985/2, Bldg No-3NA3036036
Gat No-985/2, Bldg No-4NA3036036
Gat No-985/2, Bldg No-5NA3036036
Gat No-985/2, Bldg No-6NA3036036
Gat No-985/2, Bldg No-7NA3036036
Gat No-985/2, Bldg No-8NA3036036
Gat No-985/2, Bldg No-9NA3036036
Gat No-985/2, Bldg No-10NA3036036
Gat No-985/2, Bldg No-11NA3036036
Gat No-985/2, Bldg No-12NA3036036
Gat No-985/2, Bldg No-13NA3036036
Gat No-985/2, Bldg No-14NA3036036
Gat No-1087/2, Bldg No-1NA3036036
Gat No-1087/2, Bldg No-2NA3036036
Gat No-1087/2, Bldg No-3NA3036036
Gat No-1087/2, Bldg No-4NA3036036
Gat No-56/2, Bldg No-1NA3036036
Gat No-56/2, Bldg No-2NA3036036
Gat No-56/2, Bldg No-3NA3036036
Gat No-56/2, Bldg No-4NA3036036
Gat No-56/2, Bldg No-5NA3036036
Gat No-56/2, Bldg No-6NA3036036
Gat No-56/2, Bldg No-7NA3036036
Gat No-56/2, Bldg No-8NA3036036
Gat No-56/2, Bldg No-9NA3036036
Gat No-56/2, Bldg No-10NA3036036
Gat No-56/2, Bldg No-11NA3036036
Gat No-56/2, Bldg No-12NA3036036
Gat No-56/2, Bldg No-13NA3036036
Gat No-56/2, Bldg No-14NA3036036
Gat No-56/2, Bldg No-15NA3036036
Gat No-56/1/A, Bldg No-1NA3036036
Gat No-56/1/A, Bldg No-2NA3036036
Gat No-56/1/A, Bldg No-3NA3036036
Gat No-56/1/A, Bldg No-4NA3036036
Gat No-56/1/A, Bldg No-5NA3036036
Gat No-56/1/A, Bldg No-6NA3036036
Gat No-56/1/A, Bldg No-7NA3036036
Gat No-56/1/A, Bldg No-8NA3036036
Gat No-56/1/A, Bldg No-9NA3036036
Gat No-56/1/A, Bldg No-10NA3036036
Gat No-56/1/A, Bldg No-11NA3036036
Gat No-56/1/A, Bldg No-12NA3036036
Gat No-56/1/A, Bldg No-13NA3036036
Gat No-56/1/A, Bldg No-14NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-1NA3336036
Gat No-57/1/A, 57/1/B/2, Bldg No-2NA3336036
Gat No-57/1/A, 57/1/B/2, Bldg No-3NA3336036
Gat No-57/1/A, 57/1/B/2, Bldg No-4NA3336036
Gat No-57/1/A, 57/1/B/2, Bldg No-5NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-6NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-7NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-8NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-9NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-10NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-11NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-12NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-13NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-14NA3036036
Gat No-57/1/A, 57/1/B/2, Bldg No-15NA3036036
Gat No-57/2, Bldg No-1NA3036036
Gat No-57/2, Bldg No-2NA3036036
Gat No-57/2, Bldg No-3NA3036036
Gat No-57/2, Bldg No-4NA3036036
Gat No-57/2, Bldg No-5NA3036036
Gat No-57/2, Bldg No-6NA3036036
Gat No-57/2, Bldg No-7NA3036036
Gat No-57/2, Bldg No-8NA3036036
Gat No-57/2, Bldg No-9NA3036036
Gat No-57/2, Bldg No-10NA3036036
Gat No-57/2, Bldg No-11NA3036036
Gat No-57/2, Bldg No-12NA3036036
Gat No-57/2, Bldg No-13NA3036036
Gat No-57/2, Bldg No-14NA3036036
Gat No-1055, Bldg No-1NA3336036
Gat No-1055, Bldg No-2NA3036036
Gat No-1055, Bldg No-3NA3036036
Gat No-1055, Bldg No-4NA3036036
Gat No-1055, Bldg No-5NA3036036
Gat No-1055, Bldg No-6NA3036036
Gat No-1055, Bldg No-7NA3036036
Gat No-1055, Bldg No-8NA3036036
Gat No-1055, Bldg No-9NA3036036
Gat No-1055, Bldg No-10NA3036036
Gat No-1056/2, Bldg No-1NA3036036
Gat No-1056/2, Bldg No-2NA3036036
Gat No-1056/2, Bldg No-3NA3036036
Gat No-1056/2, Bldg No-4NA3036036
Gat No-1056/2, Bldg No-5NA3036036
Gat No-1056/2, Bldg No-6NA3036036
Gat No-1056/2, Bldg No-7NA3036036
Gat No-1056/2, Bldg No-8NA3036036
Gat No-1056/2, Bldg No-9NA3036036
Gat No-1056/2, Bldg No-10NA3036036
Gat No-1056/2, Bldg No-11NA3036036
Gat No-1057/2, Bldg No-1NA3336036
Gat No-1057/2, Bldg No-2NA3036036
Gat No-1057/2, Bldg No-3NA3036036
Gat No-1057/2, Bldg No-4NA3036036
Gat No-1057/2, Bldg No-5NA3036036
Gat No-1057/2, Bldg No-6NA3036036
Gat No-1057/2, Bldg No-7NA3036036
Gat No-1057/2, Bldg No-8NA3036036
Gat No-1104/3, 1104/4, Bldg No-1NA3036036
Gat No-1104/3, 1104/4, Bldg No-2NA3036036
Gat No-1104/3, 1104/4, Bldg No-3NA3036036
Gat No-1104/3, 1104/4, Bldg No-4NA3036036
Gat No-1104/3, 1104/4, Bldg No-5NA3036036
Gat No-1104/3, 1104/4, Bldg No-6NA3036036
Gat No-1104/3, 1104/4, Bldg No-7NA3036036
Gat No-1104/3, 1104/4, Bldg No-8NA3036036
Gat No-1104/3, 1104/4, Bldg No-9NA3036036
Gat No-1104/3, 1104/4, Bldg No-10NA3036036
Gat No-1104/3, 1104/4, Bldg No-11NA3036036
Gat No-1104/3, 1104/4, Bldg No-12NA3036036
Gat No-1104/3, 1104/4, Bldg No-13NA3036036
Gat No-1104/3, 1104/4, Bldg No-14NA3036036
Gat No-1104/3, 1104/4, Bldg No-15NA3036036
Gat No-1104/2, Bldg No-1NA3336036
Gat No-1104/2, Bldg No-2NA3036036
Gat No-1104/2, Bldg No-3NA3036036
Gat No-1104/2, Bldg No-4NA3036036
Gat No-1104/2, Bldg No-5NA3036036
Gat No-1104/2, Bldg No-6NA3036036
Gat No-1104/2, Bldg No-7NA3036036
Gat No-1104/2, Bldg No-8NA3036036
Gat No-1104/2, Bldg No-9NA3036036
Gat No-1104/2, Bldg No-10NA3036036
Gat No-1104/2, Bldg No-11NA3036036
Gat No-1104/2, Bldg No-12NA3036036
Gat No-1104/2, Bldg No-13NA3036036
Gat No-1104/2, Bldg No-14NA3036036
Gat No-1104/2, Bldg No-15NA3036036
L10-214NA30101
L10-215NA30101
L10-216NA30101
L10-217NA30101
L10-218NA30101
L10-219NA30101
L10-220NA30101
L10-221NA30101
L10-222NA30101
L10-223NA30101
L10-224NA30101
L10-225NA30101
L10-226NA30101
L10-227NA30101
L10-228NA30101
L10-229NA30101
L10-230NA30101
L10-231NA30101
L10-232NA30101
L10-233NA30101
L10-234NA30101
L11-235NA30101
L11-236NA30101
L11-237NA30101
L11-238NA30101
L11-239NA30101
L11-240NA30101
L11-241NA30101
L11-242NA30101
L11-243NA30101
L11-244NA30101
L11-245NA30101
L11-246NA30101
L11-247NA30101
L11-248NA30101
L11-249NA30101
L11-250NA30101
L11-251NA30101
L11-252NA30101
L11-253NA30101
L11-254NA30101
L11-255NA30101
L11-256NA30101
L11-257NA30101
L11-258NA30101
L11-259NA30101
L11-260NA30101
L12-261NA30101
L12-262NA30101
L12-263NA30101
L12-264NA30101
L12-265NA30101
L12-266NA30101
L12-267NA30101
L12-268NA30101
L12-269NA30101
L13-270NA30101
L13-271NA30101
L13-272NA30101
L13-273NA30101
L13-274NA30101
L13-275NA30101
L13-276NA30101
L13-277NA30101
L13-278NA30101
L13-279NA30101
L13-280NA30101
L13-281NA30101
L13-282NA30101
L13-283NA30101
L13-284NA30101
L13-285NA30101
L13-286NA30101
L13-287NA30101
L13-288NA30101
L13-290NA30101
L13-291NA30101
L13-292NA30202
L13-292-1NA30000
L13-293NA30101
L13-294NA30101
L13-295NA30101
L13-296NA30101
L13-297NA30101
L13-298NA30101
L13-299NA30101
L14-300NA30101
L14-301NA30101
L14-302NA30101
L14-303NA30101
L14-304NA30101
L14-305NA30101
L14-306NA30101
L14-307NA30101
L14-308NA30101
L14-309NA30101
L14-310NA30101
L14-311NA30101
L14-312NA30101
L14-313NA30101
L14-314NA30101
L14-315NA30101
L14-316NA30101
L14-317NA30101
L14-318NA30101
L14-319NA30101
L14-320NA30101
L14-321NA30101
L14-322NA30101
L14-323NA30101
L14-324NA30101
L14-325NA30101
L14-326NA30101
L14-327NA30101
L14-328NA30101
L14-329NA30101
L15-330NA30101
L15-331NA30101
L15-332NA30101
L15-333NA30101
L15-334NA30101
L15-335NA30101
L15-336NA30101
L15-337NA30101
L15-338NA30101
L15-339NA30101
L15-340NA30101
L15-341NA30101
L15-342NA30101
L15-343NA30101
L15-344NA30101
L15-345NA30101
L15-346NA30101
L15-347NA30101
L15-348NA30101
L15-349NA30101
L15-350NA30101
L15-351NA30101
L15-352NA30101
L15-353NA30101
L15-354NA30101
L15-355NA30101
L15-356NA30101
L15-357NA30101
L15-358NA30101
L15-359NA30101
L16-360NA30101
L16-361NA30101
L16-362NA30101
L16-363NA30101
L16-364NA30101
L16-365NA30101
L16-366NA30101
L16-367NA30101
L16-368NA30101
L16-369NA30101
L16-370NA30101
L16-371NA30101
L16-372NA30101
L16-373NA30101
L16-374NA30101
L16-375NA30101
L16-376NA30101
L16-377NA30101
L16-378NA30101
L16-379NA30101
L16-380NA30101
L16-381NA30101
L16-382NA30101
L16-383NA30101
L16-384NA30101
L16-385NA30101
L16-386NA30101
L16-387NA30101
L16-388NA30101
L16-389NA30101
L17-390NA30101
L17-391NA30101
L17-392NA30101
L17-393NA30101
L17-394NA30101
L17-395NA30101
L17-396NA30101
L17-397NA30101
L17-398NA30101
L17-399NA30101
L17-400NA30101
L17-401NA30101
L17-402NA30101
L17-403NA30101
L17-404NA30101
L17-405NA30101
L17-406NA30101
L17-407NA30101
L17-408NA30101
L17-409NA30101
L17-410NA30101
L17-411NA30101
L17-412NA30101
L17-413NA30101
L17-414NA30101
L17-415NA30101
L17-416NA30101
L17-417NA30101
L17-418NA30101
L17-419NA30101
L17-420NA30101
L18-421NA30101
L18-422NA30101
L18-423NA30101
L18-424NA30101
L18-425NA30101
L18-426NA33101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 427 buildings; the table lists the first 20.

1108 of 4686 construction stages are filed complete across 427 buildings. The stage furthest along is Slabs of Super Structure, at 83%.

Gat No-845/7, Bldg No-173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-373%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-455%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-573%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-673%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-845/7, Bldg No-764%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-364%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-464%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-564%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-664%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-755%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-845%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-955%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1 Bldg No-1055%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-1145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-1245%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Gat No-1039/4, 1041/1, Bldg No-1355%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingYes0%

Parking filed15120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15,120
Open Space15,120
BuildingOpen SpaceTotal
Gat No-845/7, Bldg No-13636
Gat No-845/7, Bldg No-23636
Gat No-845/7, Bldg No-33636
Gat No-845/7, Bldg No-43636
Gat No-845/7, Bldg No-53636
Gat No-845/7, Bldg No-63636
Gat No-845/7, Bldg No-73636
Gat No-1039/4, 1041/1, Bldg No-13636
Gat No-1039/4, 1041/1, Bldg No-23636
Gat No-1039/4, 1041/1, Bldg No-33636
Gat No-1039/4, 1041/1, Bldg No-43636
Gat No-1039/4, 1041/1, Bldg No-53636
Gat No-1039/4, 1041/1, Bldg No-63636
Gat No-1039/4, 1041/1, Bldg No-73636
Gat No-1039/4, 1041/1, Bldg No-83636
Gat No-1039/4, 1041/1, Bldg No-93636
Gat No-1039/4, 1041/1 Bldg No-103636
Gat No-1039/4, 1041/1, Bldg No-113636
Gat No-1039/4, 1041/1, Bldg No-123636
Gat No-1039/4, 1041/1, Bldg No-133636
Gat No-1039/4, 1041/1, Bldg No-143636
Gat No-1039/4, 1041/1, Bldg No-153636
Gat No-1039/4, 1041/1, Bldg No-163636
Gat No-1039/4, 1041/1, Bldg No-173636
Gat No-1039/4, 1041/1, Bldg No-183636
Gat No-1039/4, 1041/1, Bldg No-193636
Gat No-1038/A/6, Bldg No-13636
Gat No-1038/A/6, Bldg No-23636
Gat No-1038/A/6, Bldg No-33636
Gat No-1038/A/6, Bldg No-43636
Gat No-1038/A/6, Bldg No-53636
Gat No-1038/A/6, Bldg No-63636
Gat No-1038/A/6, Bldg No-73636
Gat No-1038/A/6, Bldg No-83636
Gat No-1038/A/6, Bldg No-93636
Gat No-1038/A/6, Bldg No-103636
Gat No-1038/A/6, Bldg No-113636
Gat No-1038/A/6, Bldg No-123636
Gat No-1038/A/6, Bldg No-133636
Gat No-1038/A/6, Bldg No-143636
Gat No-58/1, Bldg No-13636
Gat No-58/1, Bldg No-23636
Gat No-58/1, Bldg No-33636
Gat No-58/1, Bldg No-43636
Gat No-58/1, Bldg No-53636
Gat No-58/1, Bldg No-63636
Gat No-58/1, Bldg No-72424
Gat No-58/1, Bldg No-82424
Gat No-58/1, Bldg No-92424
Gat No-58/1, Bldg No-103636
Gat No-58/1, Bldg No-113636
Gat No-58/1, Bldg No-123636
Gat No-59, Bldg No-13636
Gat No-59, Bldg No-23636
Gat No-59, Bldg No-33636
Gat No-59, Bldg No-43636
Gat No-59, Bldg No-53636
Gat No-59, Bldg No-63636
Gat No-59, Bldg No-73636
Gat No-59, Bldg No-83636
Gat No-59, Bldg No-93636
Gat No-59, Bldg No-103636
Gat No-59, Bldg No-113636
Gat No-985/1, Bldg No-13636
Gat No-985/1, Bldg No-23636
Gat No-985/1, Bldg No-33636
Gat No-985/1, Bldg No-43636
Gat No-985/1, Bldg No-53636
Gat No-985/1, Bldg No-63636
Gat No-985/1, Bldg No-73636
Gat No-985/1, Bldg No-83636
Gat No-985/1, Bldg No-93636
Gat No-985/1, Bldg No-103636
Gat No-985/1, Bldg No-113636
Gat No-985/1, Bldg No-123636
Gat No-985/1, Bldg No-133636
Gat No-985/1, Bldg No-143636
Gat No-985/1, Bldg No-153636
Gat No-985/2, Bldg No-13636
Gat No-985/2, Bldg No-23636
Gat No-985/2, Bldg No-33636
Gat No-985/2, Bldg No-43636
Gat No-985/2, Bldg No-53636
Gat No-985/2, Bldg No-63636
Gat No-985/2, Bldg No-73636
Gat No-985/2, Bldg No-83636
Gat No-985/2, Bldg No-93636
Gat No-985/2, Bldg No-103636
Gat No-985/2, Bldg No-113636
Gat No-985/2, Bldg No-123636
Gat No-985/2, Bldg No-133636
Gat No-985/2, Bldg No-143636
Gat No-1087/2, Bldg No-13636
Gat No-1087/2, Bldg No-23636
Gat No-1087/2, Bldg No-33636
Gat No-1087/2, Bldg No-43636
Gat No-56/2, Bldg No-13636
Gat No-56/2, Bldg No-23636
Gat No-56/2, Bldg No-33636
Gat No-56/2, Bldg No-43636
Gat No-56/2, Bldg No-53636
Gat No-56/2, Bldg No-63636
Gat No-56/2, Bldg No-73636
Gat No-56/2, Bldg No-83636
Gat No-56/2, Bldg No-93636
Gat No-56/2, Bldg No-103636
Gat No-56/2, Bldg No-113636
Gat No-56/2, Bldg No-123636
Gat No-56/2, Bldg No-133636
Gat No-56/2, Bldg No-143636
Gat No-56/2, Bldg No-153636
Gat No-56/1/A, Bldg No-13636
Gat No-56/1/A, Bldg No-23636
Gat No-56/1/A, Bldg No-33636
Gat No-56/1/A, Bldg No-43636
Gat No-56/1/A, Bldg No-53636
Gat No-56/1/A, Bldg No-63636
Gat No-56/1/A, Bldg No-73636
Gat No-56/1/A, Bldg No-82424
Gat No-56/1/A, Bldg No-93636
Gat No-56/1/A, Bldg No-103636
Gat No-56/1/A, Bldg No-113636
Gat No-56/1/A, Bldg No-123636
Gat No-56/1/A, Bldg No-133636
Gat No-56/1/A, Bldg No-143636
Gat No-57/1/A, 57/1/B/2, Bldg No-13636
Gat No-57/1/A, 57/1/B/2, Bldg No-23636
Gat No-57/1/A, 57/1/B/2, Bldg No-33636
Gat No-57/1/A, 57/1/B/2, Bldg No-43636
Gat No-57/1/A, 57/1/B/2, Bldg No-53636
Gat No-57/1/A, 57/1/B/2, Bldg No-63636
Gat No-57/1/A, 57/1/B/2, Bldg No-73636
Gat No-57/1/A, 57/1/B/2, Bldg No-83636
Gat No-57/1/A, 57/1/B/2, Bldg No-93636
Gat No-57/1/A, 57/1/B/2, Bldg No-103636
Gat No-57/1/A, 57/1/B/2, Bldg No-113636
Gat No-57/1/A, 57/1/B/2, Bldg No-123636
Gat No-57/1/A, 57/1/B/2, Bldg No-132424
Gat No-57/1/A, 57/1/B/2, Bldg No-142424
Gat No-57/1/A, 57/1/B/2, Bldg No-153636
Gat No-57/2, Bldg No-13636
Gat No-57/2, Bldg No-23636
Gat No-57/2, Bldg No-33636
Gat No-57/2, Bldg No-43636
Gat No-57/2, Bldg No-53636
Gat No-57/2, Bldg No-63636
Gat No-57/2, Bldg No-73636
Gat No-57/2, Bldg No-83636
Gat No-57/2, Bldg No-93636
Gat No-57/2, Bldg No-103636
Gat No-57/2, Bldg No-113636
Gat No-57/2, Bldg No-123636
Gat No-57/2, Bldg No-133636
Gat No-57/2, Bldg No-143636
Gat No-1055, Bldg No-13636
Gat No-1055, Bldg No-23636
Gat No-1055, Bldg No-33636
Gat No-1055, Bldg No-43636
Gat No-1055, Bldg No-53636
Gat No-1055, Bldg No-63636
Gat No-1055, Bldg No-73636
Gat No-1055, Bldg No-83636
Gat No-1055, Bldg No-93636
Gat No-1055, Bldg No-103636
Gat No-1056/2, Bldg No-13636
Gat No-1056/2, Bldg No-23636
Gat No-1056/2, Bldg No-32424
Gat No-1056/2, Bldg No-43636
Gat No-1056/2, Bldg No-53636
Gat No-1056/2, Bldg No-63636
Gat No-1056/2, Bldg No-73636
Gat No-1056/2, Bldg No-83636
Gat No-1056/2, Bldg No-93636
Gat No-1056/2, Bldg No-103636
Gat No-1056/2, Bldg No-113636
Gat No-1057/2, Bldg No-13636
Gat No-1057/2, Bldg No-23636
Gat No-1057/2, Bldg No-33636
Gat No-1057/2, Bldg No-43636
Gat No-1057/2, Bldg No-53636
Gat No-1057/2, Bldg No-63636
Gat No-1057/2, Bldg No-73636
Gat No-1057/2, Bldg No-83636
Gat No-1104/3, 1104/4, Bldg No-13636
Gat No-1104/3, 1104/4, Bldg No-23636
Gat No-1104/3, 1104/4, Bldg No-33636
Gat No-1104/3, 1104/4, Bldg No-43636
Gat No-1104/3, 1104/4, Bldg No-53636
Gat No-1104/3, 1104/4, Bldg No-63636
Gat No-1104/3, 1104/4, Bldg No-73636
Gat No-1104/3, 1104/4, Bldg No-83636
Gat No-1104/3, 1104/4, Bldg No-93636
Gat No-1104/3, 1104/4, Bldg No-103636
Gat No-1104/3, 1104/4, Bldg No-112424
Gat No-1104/3, 1104/4, Bldg No-122424
Gat No-1104/3, 1104/4, Bldg No-132424
Gat No-1104/3, 1104/4, Bldg No-143636
Gat No-1104/3, 1104/4, Bldg No-153636
Gat No-1104/2, Bldg No-13636
Gat No-1104/2, Bldg No-22424
Gat No-1104/2, Bldg No-32424
Gat No-1104/2, Bldg No-43636
Gat No-1104/2, Bldg No-53636
Gat No-1104/2, Bldg No-63636
Gat No-1104/2, Bldg No-73636
Gat No-1104/2, Bldg No-83636
Gat No-1104/2, Bldg No-93636
Gat No-1104/2, Bldg No-103636
Gat No-1104/2, Bldg No-113636
Gat No-1104/2, Bldg No-123636
Gat No-1104/2, Bldg No-133636
Gat No-1104/2, Bldg No-143636
Gat No-1104/2, Bldg No-153636
L10-2143636
L10-2153636
L10-2163636
L10-2173636
L10-2183636
L10-2193636
L10-2203636
L10-2213636
L10-2223636
L10-2233636
L10-2243636
L10-2253636
L10-2263636
L10-2273636
L10-2283636
L10-2293636
L10-2303636
L10-2313636
L10-2323636
L10-2333636
L10-2343636
L11-2353636
L11-2363636
L11-2373636
L11-2383636
L11-2393636
L11-2403636
L11-2413636
L11-2423636
L11-2433636
L11-2443636
L11-2453636
L11-2463636
L11-2473636
L11-2483636
L11-2493636
L11-2503636
L11-2513636
L11-2523636
L11-2533636
L11-2543636
L11-2553636
L11-2563636
L11-2573636
L11-2583636
L11-2593636
L11-2603636
L12-2613636
L12-2623636
L12-2633636
L12-2643636
L12-2653636
L12-2663636
L12-2673636
L12-2683636
L12-2693636
L13-2703636
L13-2713636
L13-2723636
L13-2733636
L13-2743636
L13-2753636
L13-2763636
L13-2773636
L13-2783636
L13-2793636
L13-2803636
L13-2813636
L13-2823636
L13-2833636
L13-2843636
L13-2853636
L13-2863636
L13-2873636
L13-2883636
L13-2903636
L13-2913636
L13-2923636
L13-2933636
L13-2943636
L13-2953636
L13-2963636
L13-2973636
L13-2983636
L13-2993636
L14-3003636
L14-3013636
L14-3023636
L14-3033636
L14-3043636
L14-3053636
L14-3063636
L14-3073636
L14-3083636
L14-3093636
L14-3103636
L14-3113636
L14-3123636
L14-3133636
L14-3143636
L14-3153636
L14-3163636
L14-3173636
L14-3183636
L14-3193636
L14-3203636
L14-3213636
L14-3223636
L14-3233636
L14-3243636
L14-3253636
L14-3263636
L14-3273636
L14-3283636
L14-3293636
L15-3303636
L15-3313636
L15-3323636
L15-3333636
L15-3343636
L15-3353636
L15-3363636
L15-3373636
L15-3383636
L15-3393636
L15-3403636
L15-3413636
L15-3423636
L15-3433636
L15-3443636
L15-3453636
L15-3463636
L15-3473636
L15-3483636
L15-3493636
L15-3503636
L15-3513636
L15-3523636
L15-3533636
L15-3543636
L15-3553636
L15-3563636
L15-3573636
L15-3583636
L15-3593636
L16-3603636
L16-3613636
L16-3623636
L16-3633636
L16-3643636
L16-3653636
L16-3663636
L16-3673636
L16-3683636
L16-3693636
L16-3703636
L16-3713636
L16-3723636
L16-3733636
L16-3743636
L16-3753636
L16-3763636
L16-3773636
L16-3783636
L16-3793636
L16-3803636
L16-3813636
L16-3823636
L16-3833636
L16-3843636
L16-3853636
L16-3863636
L16-3873636
L16-3883636
L16-3893636
L17-3903636
L17-3913636
L17-3923636
L17-3933636
L17-3943636
L17-3953636
L17-3963636
L17-3973636
L17-3983636
L17-3993636
L17-4003636
L17-4013636
L17-4023636
L17-4033636
L17-4043636
L17-4053636
L17-4063636
L17-4073636
L17-4083636
L17-4093636
L17-4103636
L17-4113636
L17-4123636
L17-4133636
L17-4143636
L17-4153636
L17-4163636
L17-4173636
L17-4183636
L17-4193636
L17-4203636
L18-4213636
L18-4223636
L18-4233636
L18-4243636
L18-4253636

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area798,012 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 May 2026
LandownerVillageDistrict
RAY NAGARHOUSING CO OP SOCIETIES FEDERATION LTDKumbhariSolapur

Approvals and building plan

Sanctioning authorityBuilding Permission PMAY Cell Maharashtra Housing and area Development Authority MHADA MUMBAI
Permissible FSI510671.5
Proposed, not sanctioned1,202 sq m
Buildings approved425
Buildings sanctioned425

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSOLAPUR

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SANTOSH MOTE
ArchitectParag Rane
ArchitectPravin Deodhar
EngineerER SHRINIVAS MOHALKAR
EngineerVitarag Associates
EngineerAnant Chaitanya Consultancy services
Chartered AccountantG M Pawle and Associates
Chartered AccountantDinesh Anand Tulshigar
PartnerRole in project
Vasant Vihar Realty Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17012619483Dec 2025 → Dec 2027

Reason as filed by the promoterमा.श्री. नरेंद्र मोदीजी, पंतप्रधान, भारत सरकार यांच्या शुभहस्ते सदरील प्रकल्पाची पायाभरणी दिनांक ०९ जानेवारी २०१९ रोजी करण्यात आली. त्यानंतर प्रकल्पाचे काम चालू करण्यात आले. परंतु, मार्च २०२० मध्ये COVID मुळे प्रकल्पातील काम बंद करण्यात आले. सदरील प्रकल्प विहित वेळेत पूर्ण करण्याच्या दृष्टीकोनातून दि.१७.०७.२०२१ व १८.०७.२०२१ रोजी श्री. अनिल डिग्गीकर (भा.प्र.से.), उपाध्यक्ष, म्हाडा, पंतप्रधान कार्यालय, नवी दिल्ली येथील उपसचिव श्री.मंगेश घिलदियाल (भा.प्र.से.), श्री.मिलिद शंभरकर (भा.प्र.से.) जिल्हाधिकारी, सोलापूर, श्री.एस.के. बब्बर, उपसचिव, गृहनिर्माण व शहरी व्यवहार मंत्रालय, केंद्र शासन, श्रीमती

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed205

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 205 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE 30JUNE2026.pdf5 Aug 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE 30JUNE2026.pdf5 Aug 2026
Withdrawal Update Form 2File: RERA ENGINEERS CERTIFICATE-FORM-2.pdf5 Aug 2026
Withdrawal Update Form 2File: RERA ENGINEERS CERTIFICATE-FORM-2.pdf5 Aug 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE 30JUNE2026.pdf5 Aug 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE 30JUNE2026.pdf5 Aug 2026
Withdrawal Update Form 1File: Form_1 Ray Nagar.pdf15 May 2026
Withdrawal Update Form 1File: Form_1 Ray Nagar.pdf15 May 2026
Withdrawal Update Form 2File: RERA ENGINEERS CERTIFICATE-FORM-2.pdf15 May 2026
Withdrawal Update Form 2File: RERA ENGINEERS CERTIFICATE-FORM-2.pdf15 May 2026
Withdrawal Update Form 3File: Form_3 Ray Nagar Project.pdf15 May 2026
Withdrawal Update Form 3File: Form_3 Ray Nagar Project.pdf15 May 2026
Form 2A (FY 2024-2025)File: RAY NAGAR FORM 2A_2024-25.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: RAY NAGAR FORM-5 31 MARCH 2025.pdf9 Dec 2025
Form 1File: FORM 1 RAY NAGAR ARCHITECT CERTIFICATE 30 SEP 2025.pdf1 Dec 2025
Form 2File: FORM 2 RAY NAGAR ENGINEER CERTIFICATE 30 SEP 2025.pdf1 Dec 2025
Form 3File: FORM 3 RAY NAGAR CA CERTIFICATE 30 SEP 2025.pdf1 Dec 2025
Disclosure of Sold and Booked InventoryFile: RAY NAGAR SOLD UNSOLD INVENTORY 30 SEP 2025.pdf1 Dec 2025
Form 1File: FORM 1 RAY NAGAR ARCHITECT CERTIFICATE 30 JUNE 2025.pdf25 Jul 2025
Form 2File: FORM 2 RAY NAGAR ENGINEER CERTIFICATE 30 JUNE 2025.pdf25 Jul 2025
Form 3File: FORM 3 RAY NAGAR CA CERTIFICATE 30 JUNE 2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: RAY NAGAR SOLD UNSOLD INVENTORY 30 JUNE 2025.pdf25 Jul 2025
Certificates of CA (Form 3)File: RAY NAGAR RERA FORM,-3 March 25.pdf17 May 2025
Disclosure of sold/ booked inventoryFile: RAY NAGAR SOLD UNSOLD 31 March 25.pdf17 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA RAYNAGAR ARCHITECT CERTIFICATE MARCH 25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA RAY NAGAR ENGG CERTIFICATE MARCH25.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA RAY NAGAR ENGG CERTIFICATE QAC MARCH25.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAY NAGAR ARCHITECT CERTIFICATE 31 DEC 2024.pdf18 Jan 2025
Certificates of CA (Form 3)File: RAY NAGAR CA CERTIFICATE 31 DEC 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RAY NAGAR ENGINEER CERTIFICATE 31 DEC 2024.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: RAY NAGAR SOLD UNSOLD 31 DEC 2024.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: PLINTHCCLETTERGATNO1056.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAY NAGAR ARCHITECTS CERTIFICATE SEP 24.pdf26 Nov 2024
Certificates of CA (Form 3)File: RERA CA CERTIFICATE SEP 24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RAY NAGAR ENGINEERS CERTIFICATE SEP 24.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: RAY NAGAR SOLD UNSOLD SEP 24.pdf26 Nov 2024
Declaration about Commencement CertificateFile: DECLERATION ABOUT CC FORMAT D.PDF26 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD-UNSOLD INVENTORY.PDF26 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1ANNEXURE_A.pdf26 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 ANNEXURE_A.pdf26 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLERATION ABOUT BANK ACCOUNT FORMAT A.PDF26 Jul 2024
Layout approvalFile: LAYOUT APPROVAL DWG GAT NO 1055.pdf25 Jul 2024
Layout approvalFile: LAYOUT APPROVAL DWG GAT NO 1056-2.pdf25 Jul 2024
Layout approvalFile: LAYOUT APPROVAL DWG GAT NO 1057-2 Compressed.pdf25 Jul 2024
Layout approvalFile: LAYOUT APPROVAL DWG GAT NO 1104-3 - 1104-4 Compressed.pdf25 Jul 2024
Building plan approval or NA orderFile: BUILDING PERMISSION DWG GAT NO 1055 Compressed.pdf25 Jul 2024
Building plan approval or NA orderFile: BUILDING PERMISSION DWG GAT NO 1056-2 Compressed.pdf25 Jul 2024
Building plan approval or NA orderFile: BUILDING PERMISSION DWG GAT NO 1057-2 Compressed.pdf25 Jul 2024
Building plan approval or NA orderFile: BUILDING PERMISSION DWG GAT NO 1104-3 - 1104-4 Compressed.pdf25 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL DWG GAT NO 1055.pdf25 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL DWG GAT NO 1056-2.pdf25 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL DWG GAT NO 1057-2 Compressed.pdf25 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL DWG GAT NO 1104-3 - 1104-4 Compressed.pdf25 Jul 2024
Building Plan Approval (IOD)File: BUILDING PERMISSION DWG GAT NO 1055 Compressed.pdf25 Jul 2024
Building Plan Approval (IOD)File: BUILDING PERMISSION DWG GAT NO 1056-2 Compressed.pdf25 Jul 2024
Building Plan Approval (IOD)File: BUILDING PERMISSION DWG GAT NO 1057-2 Compressed.pdf25 Jul 2024
Building Plan Approval (IOD)File: BUILDING PERMISSION DWG GAT NO 1104-3 - 1104-4 Compressed.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC LETTER GAT NO 1055.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION DWG GAT NO 1056-2 Compressed.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC LETTER GAT NO 1057-2.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH C C LETTER Gat no 1104-2.pdf25 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC LETTER GAT NO 1104-3 - 1104-4.pdf25 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200314730455_For_Asset_Based_Search_25_07_2024_09_30_52_257.pdf25 Jul 2024
Certificates of CA (Form 3)File: FORM 3_March 24 Phase II_CA signed_.PDF25 Jul 2024
Certificates of CA (Form 3)File: RAYNAGAR RERA II FORM 3_JUNE 24.PDF25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 March 24 Phase II.PDF25 Jul 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: 1 Status of Formation of Legal Entity.pdf25 Jul 2024
Layout approvalFile: GAT NO 1038-A-6 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: LAYOUT APPROVAL DWG GAT NO 1039-4- 1041-1 Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO -58-1 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 59 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 1087-2 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 56-1-A LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 56-2 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: IOA LETTER GAT NO 57-1 A - 57-1 B Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 57-2 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 845-7 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 985-1 LAYOUT Compressed.pdf24 Jul 2024
Layout approvalFile: GAT NO 985-2 LAYOUT Compressed.pdf24 Jul 2024
Building plan approval or NA orderFile: BUILDING PERMISSION DWG 1038-A-6 Compressed.pdf24 Jul 2024

How this compares with Solapur

5%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 24 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Ray Nagar Housing Project Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KUMBHARI TO DARGANHALLI ROAD550+ in Solapur

Builder: Vasant Vihar Realty Pvt Ltd

Vasant Vihar Realty Pvt Ltd has 2 registrations on MahaRERA, including Ray Nagar Housing Project and Ray Nagar Housing Project Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Ray Nagar Housing Project Phase 2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ray Nagar Housing Project Phase 2?

The registered promoter entity is Vasant Vihar Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ray Nagar Housing Project Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ray Nagar Housing Project Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ray Nagar Housing Project Phase 2?

The professionals named in the filing: Architect: AR SANTOSH MOTE; Architect: Parag Rane; Architect: Pravin Deodhar; Engineer: ER SHRINIVAS MOHALKAR; Engineer: Vitarag Associates; Engineer: Anant Chaitanya Consultancy services. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ray Nagar Housing Project Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ray Nagar Housing Project Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ray Nagar Housing Project Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.