NYATI EQUINOX I
RG-MH-42061 · RERA P52100047984 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 1 complaint at MahaRERA
- Completion date moved by 25 months
- 1 extension taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI EQUINOX I is a Others project by MIHIR HOMES ENTERPRISE LLP in Pune, Maharashtra, registered with MahaRERA as P52100047984 on 7 Dec 2022. Possession is promised by 30 Sep 2028. The completion date has moved by 25 months from the original filing. 873 of the 1,157 units on this registration are recorded sold or booked, and 23 of 121 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameNYATI EQUINOX I
- TypeOthers
- Location
- MULSHI
- BAVDHAN
- Bavdhan Kh.
- Haveli
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047984
- ReraGenie IDRG-MH-42061
Builder
- NameMIHIR HOMES ENTERPRISE LLP
- Entity typePartnership
- GSTIN27ABBFM8951G2Z0
- PartnersNITIN DWARKADAS NYATI, PIYUSH NITIN NYATI, PRANAV NITIN NYATI, MAHENDRA FAKIRCHAND SABADRA, MIHIR MAHENDRA SABADRA, VEDANT MAHENDRA SABADRA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Dec 2022
- Promised completion30 Sep 2028
- Revised completionRevised to 30 Sep 2028 (originally 31 Aug 2026)
- Buildings11 building records
- Documents filed177 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG 1B | NA | 32 | 28 | 110 | 0 | 110 |
| BLDG 1C | NA | 32 | 28 | 110 | 0 | 110 |
| BLDG 1D | NA | 32 | 28 | 110 | 0 | 110 |
| BLDG 2E | NA | 32 | 28 | 112 | 0 | 112 |
| BLDG 2F | NA | 32 | 28 | 112 | 0 | 112 |
| COMMERCIAL BLDG | NA | 7 | 3 | 0 | 104 | 104 |
| BLDG 1A | NA | 32 | 28 | 110 | 0 | 110 |
| BLDG 2A | NA | 32 | 28 | 111 | 0 | 111 |
| BLDG 2B | NA | 32 | 28 | 111 | 0 | 111 |
| BLDG 2C | NA | 32 | 28 | 111 | 0 | 111 |
| BLDG 2D | NA | 32 | 28 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building11
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
23 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Slabs of Super Structure, at 97%.
BLDG 1B75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 97% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 73% |
| Sanitary Fittings within the flats / premises | 48% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 82% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 52% |
BLDG 1C75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 97% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 77% |
| Sanitary Fittings within the flats / premises | 43% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 66% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 51% |
BLDG 1D76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 97% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 77% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 82% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BLDG 2E79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 97% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 52% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 72% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BLDG 2F76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 55% |
| Slabs of Super Structure | 97% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 77% |
| Sanitary Fittings within the flats / premises | 56% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 82% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 66% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 51% |
COMMERCIAL BLDG58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 32% |
| Sanitary Fittings within the flats / premises | 17% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 18% |
BLDG 1A25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 11% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLDG 2A24%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLDG 2B24%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLDG 2C24%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLDG 2D25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 14% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 12% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 30% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1347
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BLDG 1B | 1 | 60 | 61 |
| BLDG 1C | 1 | 60 | 61 |
| BLDG 1D | 1 | 60 | 61 |
| BLDG 2E | 1 | 60 | 61 |
| BLDG 2F | 1 | 60 | 61 |
| COMMERCIAL BLDG | 0 | 100 | 100 |
| BLDG 1A | 192 | 0 | 192 |
| BLDG 2A | 194 | 0 | 194 |
| BLDG 2B | 194 | 0 | 194 |
| BLDG 2C | 194 | 0 | 194 |
| BLDG 2D | 168 | 0 | 168 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 52.90 cr | Rs 8.20 cr |
| BLDG 2F | NA | Rs 45.93 cr | Rs 36.54 cr |
| BLDG 1D | NA | Rs 45.58 cr | Rs 35.74 cr |
| BLDG 2E | NA | Rs 45.39 cr | Rs 36.08 cr |
| BLDG 1B | NA | Rs 45.10 cr | Rs 35.38 cr |
| BLDG 1C | NA | Rs 44.82 cr | Rs 35.18 cr |
| BLDG 2D | NA | Rs 43.29 cr | Rs 4.16 cr |
| BLDG 2C | NA | Rs 43.08 cr | Rs 1.64 cr |
| BLDG 2B | NA | Rs 42.88 cr | Rs 2.15 cr |
| BLDG 2A | NA | Rs 42.64 cr | Rs 2.14 cr |
| BLDG 1A | NA | Rs 42.58 cr | Rs 3.15 cr |
| COMMERCIAL BLDG | NA | Rs 8.37 cr | Rs 2.39 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shirish Dasnurkar and Associates |
| Architect | Sanjeev Mukund Mehta |
| Engineer | JW Consultant LLP PMC LIC NO 20 |
| Engineer | Vishwanath Dhande |
| Engineer | RAJENDRA RUPNAR |
| Engineer | PRAMOD BHAT |
| Engineer | NITESH BINAWAT |
| Chartered Accountant | KUSHAL JAIN |
| Chartered Accountant | Milani Gattani & Co. |
| Partner | Role in project |
|---|---|
| MIHIR HOMES ENTERPRISE LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Ma’am, We had made an Extension Application as per Order 40/2022 dated 27/12/2022 and Order No. 40A/2023 dated 15/05/2023. The hearing with Honourable Chairperson was conducted on 06/10/2025 (Regulatory Case No. 411 of 2025). Honourable Chairperson has issued Order dated 14/10/2025 in our favour, and the same is attached herewith for your ready reference. We request you to kindly issue our Revised Registration Certificate with the updated date of completion. Thanking You, Mihir Homes Enterprise LLP
Litigation declared6
| Case | Court | Status |
|---|---|---|
| RTS NO 257/2019 | SDO MAVAL | Closed |
| SCS NO 878/2019 | Civil Judge Senior Division Pune | Closed |
| RCS NO 592/2020 | Civil Judge Junior Division PMC | Ongoing |
| KULKAYDA/70B/SR/07/2020/2020 | TAHASILDAR PAUD MULSHI | Closed |
| 2494/2021 | BOMBAY HIGH COURT | Closed |
| 592/2020 | CIVIL COURT SENIOR DIVISION | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600446 | Ram Gawali | MIHIR HOMES ENTERPRISE LLP | 29/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2028
Documents filed177
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Nyati Equinox I Q4.pdf | 16 Jun 2026 |
| Form 2A (FY 2025-2026)File: Nyati Equinox I Form 2A 2025-2026.pdf | 23 Apr 2026 |
| Form 2A (FY 2022-2023)File: Form 2A.pdf | 25 Mar 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A.pdf | 25 Mar 2026 |
| Form 2A (FY 2024-2025)File: Nyati Equinox I Form 2A.pdf | 25 Mar 2026 |
| Form 1File: FORM 1.pdf | 17 Feb 2026 |
| Form 2File: FORM 2.pdf | 17 Feb 2026 |
| Form 3File: FORM 3.pdf | 17 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 17 Feb 2026 |
| Form 1File: FORM 1.pdf | 23 Jan 2026 |
| Form 2File: FORM 2.pdf | 23 Jan 2026 |
| Form 3File: FORM 3.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 23 Jan 2026 |
| Form 1File: FORM 1.pdf | 23 Jan 2026 |
| Form 2File: FORM 2.pdf | 23 Jan 2026 |
| Form 3File: FORM 3.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 23 Jan 2026 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 23 Jul 2025 |
| Form 1File: FORM 1.pdf | 23 Jul 2025 |
| Form 2File: FORM 2.pdf | 23 Jul 2025 |
| Form 3File: FORM 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 23 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 9 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nyati Equinox I.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Apr 2025 |
| Copy of the legal title reportFile: Legal Title Report dt 30042024.pdf | 21 Feb 2025 |
| Layout approvalFile: Layout.pdf | 23 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Equinox I - Form 5.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Equinox I Form 3.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 17 Jul 2024 |
| Layout approvalFile: Nyati Equinox I Layout_compressed (1) (2).pdf | 1 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Nyati Equinox I Layout_compressed (1) (2).pdf | 1 Jul 2024 |
| Declaration about Commencement CertificateFile: FORM D Sign.pdf | 1 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Estimate Cost Details.pdf | 1 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Declaration- Form 5 -Equinox I Sign.pdf | 1 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 18 May 2024 |
| Proforma of Agreement for saleFile: EQUINOX I AGREE FLATS REVISED 030524 CLEAN.pdf | 16 May 2024 |
| Building plan approvalFile: Commercial Bldg Mezz.pdf | 6 May 2024 |
| Building plan approvalFile: Commercial Bldg P2.pdf | 6 May 2024 |
| Building plan approvalFile: Commercial Bldg P1.pdf | 6 May 2024 |
| Building plan approvalFile: Commercial Bldg P3.pdf | 6 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg Mezz.pdf | 6 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P2.pdf | 6 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P1.pdf | 6 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P3.pdf | 6 May 2024 |
| Building plan approvalFile: 2E Section Bldg.pdf | 29 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2E Section Bldg.pdf | 29 Apr 2024 |
| Proforma of Agreement for saleFile: EQUINOX I AGREE FLATS 281123 CLEAN Revised 2642024 CLEAN.pdf | 26 Apr 2024 |
| Layout approvalFile: Layout.pdf | 23 Apr 2024 |
| Building plan approvalFile: 1B 1C 1D Elevation.pdf | 23 Apr 2024 |
| Building plan approvalFile: 1B 1C 1D Section.pdf | 23 Apr 2024 |
| Building plan approvalFile: 1B Building plan.pdf | 23 Apr 2024 |
| Building plan approvalFile: 1C Building plan.pdf | 23 Apr 2024 |
| Building plan approvalFile: 1D Building plan.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2E Building plan.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2E Elevation.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2E Section.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2F Building plan.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2F Elevation.pdf | 23 Apr 2024 |
| Building plan approvalFile: 2F Section.pdf | 23 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 23 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1B 1C 1D Elevation.pdf | 23 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 177 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NYATI EQUINOX I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BAVDHAN13,700+ in Pune
Filed coordinates, straight-line distance. 172 registered projects within 2 km.
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
ORIZZONTE PHASE - I
GALAXY VENTURES
Builder: MIHIR HOMES ENTERPRISE LLP
MIHIR HOMES ENTERPRISE LLP has 2 registrations on MahaRERA, including NYATI EQUINOX I and NYATI EQUINOX II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NYATI EQUINOX I is delayed beyond 30 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI EQUINOX I?
The registered promoter entity is MIHIR HOMES ENTERPRISE LLP, a partnership as per the filing. Its GSTIN 27ABBFM8951G2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI EQUINOX I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NYATI EQUINOX I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NYATI EQUINOX I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI EQUINOX I?
The professionals named in the filing: Architect: Shirish Dasnurkar and Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP PMC LIC NO 20; Engineer: Vishwanath Dhande; Engineer: RAJENDRA RUPNAR; Engineer: PRAMOD BHAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI EQUINOX I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback