Home / Browse projects / Pune, Maharashtra / NYATI EQUINOX I

Registered Litigation declared Others project

NYATI EQUINOX I

By MIHIR HOMES ENTERPRISE LLP

RG-MH-42061 · RERA P52100047984 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 25 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedmoved 25 months from the original
23 of 121Construction stages doneacross 11 buildings; furthest along: Slabs of Super Structure, 97%
284 of 1,157Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

NYATI EQUINOX I is a Others project by MIHIR HOMES ENTERPRISE LLP in Pune, Maharashtra, registered with MahaRERA as P52100047984 on 7 Dec 2022. Possession is promised by 30 Sep 2028. The completion date has moved by 25 months from the original filing. 873 of the 1,157 units on this registration are recorded sold or booked, and 23 of 121 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNYATI EQUINOX I
  • TypeOthers
  • Location
    • MULSHI
    • BAVDHAN
    • Bavdhan Kh.
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047984
  • ReraGenie IDRG-MH-42061

Builder

  • NameMIHIR HOMES ENTERPRISE LLP
  • Entity typePartnership
  • GSTIN27ABBFM8951G2Z0
  • PartnersNITIN DWARKADAS NYATI, PIYUSH NITIN NYATI, PRANAV NITIN NYATI, MAHENDRA FAKIRCHAND SABADRA, MIHIR MAHENDRA SABADRA, VEDANT MAHENDRA SABADRA
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2022First promiseAug 2026Revised toSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion30 Sep 2028
  • Revised completionRevised to 30 Sep 2028 (originally 31 Aug 2026)
  • Buildings11 building records
  • Documents filed177 files

Current status

75%873 of 1,157 units booked
40.3%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG 1BNA32281100110
BLDG 1CNA32281100110
BLDG 1DNA32281100110
BLDG 2ENA32281120112
BLDG 2FNA32281120112
COMMERCIAL BLDGNA730104104
BLDG 1ANA32281100110
BLDG 2ANA32281110111
BLDG 2BNA32281110111
BLDG 2CNA32281110111
BLDG 2DNA322856056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Slabs of Super Structure, at 97%.

BLDG 1B75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises48%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%
BLDG 1C75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises43%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.51%
BLDG 1D76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor60%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BLDG 2E79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor90%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises52%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BLDG 2F76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor55%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises56%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.51%
COMMERCIAL BLDG58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor50%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises32%
Sanitary Fittings within the flats / premises17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%
BLDG 1A25%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure11%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG 2A24%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG 2B24%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG 2C24%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG 2D25%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes12%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1347

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,347
Closed/Covered947
Open Space400
BuildingClosed/CoveredOpen SpaceTotal
BLDG 1B16061
BLDG 1C16061
BLDG 1D16061
BLDG 2E16061
BLDG 2F16061
COMMERCIAL BLDG0100100
BLDG 1A1920192
BLDG 2A1940194
BLDG 2B1940194
BLDG 2C1940194
BLDG 2D1680168

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,103 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Feb 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI137042.19
Proposed, not sanctioned137,042 sq m
Buildings approved11
Buildings sanctioned11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE
Estimated costRs 502.56 cr
Cost incurredRs 202.74 cr
Work done40.34%
BuildingWingEstimatedIncurred
-NARs 52.90 crRs 8.20 cr
BLDG 2FNARs 45.93 crRs 36.54 cr
BLDG 1DNARs 45.58 crRs 35.74 cr
BLDG 2ENARs 45.39 crRs 36.08 cr
BLDG 1BNARs 45.10 crRs 35.38 cr
BLDG 1CNARs 44.82 crRs 35.18 cr
BLDG 2DNARs 43.29 crRs 4.16 cr
BLDG 2CNARs 43.08 crRs 1.64 cr
BLDG 2BNARs 42.88 crRs 2.15 cr
BLDG 2ANARs 42.64 crRs 2.14 cr
BLDG 1ANARs 42.58 crRs 3.15 cr
COMMERCIAL BLDGNARs 8.37 crRs 2.39 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Dasnurkar and Associates
ArchitectSanjeev Mukund Mehta
EngineerJW Consultant LLP PMC LIC NO 20
EngineerVishwanath Dhande
EngineerRAJENDRA RUPNAR
EngineerPRAMOD BHAT
EngineerNITESH BINAWAT
Chartered AccountantKUSHAL JAIN
Chartered AccountantMilani Gattani & Co.
PartnerRole in project
MIHIR HOMES ENTERPRISE LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024352Aug 2026 → Sep 2028

Reason as filed by the promoterRespected Sir/Ma’am, We had made an Extension Application as per Order 40/2022 dated 27/12/2022 and Order No. 40A/2023 dated 15/05/2023. The hearing with Honourable Chairperson was conducted on 06/10/2025 (Regulatory Case No. 411 of 2025). Honourable Chairperson has issued Order dated 14/10/2025 in our favour, and the same is attached herewith for your ready reference. We request you to kindly issue our Revised Registration Certificate with the updated date of completion. Thanking You, Mihir Homes Enterprise LLP

Litigation declared6

CaseCourtStatus
RTS NO 257/2019SDO MAVALClosed
SCS NO 878/2019Civil Judge Senior Division PuneClosed
RCS NO 592/2020Civil Judge Junior Division PMCOngoing
KULKAYDA/70B/SR/07/2020/2020TAHASILDAR PAUD MULSHIClosed
2494/2021BOMBAY HIGH COURTClosed
592/2020CIVIL COURT SENIOR DIVISIONOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600446Ram GawaliMIHIR HOMES ENTERPRISE LLP29/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Nyati Equinox I Q4.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Nyati Equinox I Form 2A 2025-2026.pdf23 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A.pdf25 Mar 2026
Form 2A (FY 2023-2024)File: FORM 2A.pdf25 Mar 2026
Form 2A (FY 2024-2025)File: Nyati Equinox I Form 2A.pdf25 Mar 2026
Form 1File: FORM 1.pdf17 Feb 2026
Form 2File: FORM 2.pdf17 Feb 2026
Form 3File: FORM 3.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Feb 2026
Form 1File: FORM 1.pdf23 Jan 2026
Form 2File: FORM 2.pdf23 Jan 2026
Form 3File: FORM 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf23 Jan 2026
Form 1File: FORM 1.pdf23 Jan 2026
Form 2File: FORM 2.pdf23 Jan 2026
Form 3File: FORM 3.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf23 Jan 2026
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf23 Jul 2025
Form 1File: FORM 1.pdf23 Jul 2025
Form 2File: FORM 2.pdf23 Jul 2025
Form 3File: FORM 3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nyati Equinox I.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2025
Copy of the legal title reportFile: Legal Title Report dt 30042024.pdf21 Feb 2025
Layout approvalFile: Layout.pdf23 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Equinox I - Form 5.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Equinox I Form 3.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Jul 2024
Layout approvalFile: Nyati Equinox I Layout_compressed (1) (2).pdf1 Jul 2024
Copy of Layout Approval (in case of layout)File: Nyati Equinox I Layout_compressed (1) (2).pdf1 Jul 2024
Declaration about Commencement CertificateFile: FORM D Sign.pdf1 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Estimate Cost Details.pdf1 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Declaration- Form 5 -Equinox I Sign.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf18 May 2024
Proforma of Agreement for saleFile: EQUINOX I AGREE FLATS REVISED 030524 CLEAN.pdf16 May 2024
Building plan approvalFile: Commercial Bldg Mezz.pdf6 May 2024
Building plan approvalFile: Commercial Bldg P2.pdf6 May 2024
Building plan approvalFile: Commercial Bldg P1.pdf6 May 2024
Building plan approvalFile: Commercial Bldg P3.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg Mezz.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P2.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P1.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg P3.pdf6 May 2024
Building plan approvalFile: 2E Section Bldg.pdf29 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2E Section Bldg.pdf29 Apr 2024
Proforma of Agreement for saleFile: EQUINOX I AGREE FLATS 281123 CLEAN Revised 2642024 CLEAN.pdf26 Apr 2024
Layout approvalFile: Layout.pdf23 Apr 2024
Building plan approvalFile: 1B 1C 1D Elevation.pdf23 Apr 2024
Building plan approvalFile: 1B 1C 1D Section.pdf23 Apr 2024
Building plan approvalFile: 1B Building plan.pdf23 Apr 2024
Building plan approvalFile: 1C Building plan.pdf23 Apr 2024
Building plan approvalFile: 1D Building plan.pdf23 Apr 2024
Building plan approvalFile: 2E Building plan.pdf23 Apr 2024
Building plan approvalFile: 2E Elevation.pdf23 Apr 2024
Building plan approvalFile: 2E Section.pdf23 Apr 2024
Building plan approvalFile: 2F Building plan.pdf23 Apr 2024
Building plan approvalFile: 2F Elevation.pdf23 Apr 2024
Building plan approvalFile: 2F Section.pdf23 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1B 1C 1D Elevation.pdf23 Apr 2024

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 25 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EQUINOX I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAVDHAN13,700+ in Pune

2 kmNYATI EQUINOX ICompleted 69Lapsed / revoked 45Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 172 registered projects within 2 km.

Builder: MIHIR HOMES ENTERPRISE LLP

MIHIR HOMES ENTERPRISE LLP has 2 registrations on MahaRERA, including NYATI EQUINOX I and NYATI EQUINOX II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EQUINOX I is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EQUINOX I?

The registered promoter entity is MIHIR HOMES ENTERPRISE LLP, a partnership as per the filing. Its GSTIN 27ABBFM8951G2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EQUINOX I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI EQUINOX I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI EQUINOX I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EQUINOX I?

The professionals named in the filing: Architect: Shirish Dasnurkar and Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP PMC LIC NO 20; Engineer: Vishwanath Dhande; Engineer: RAJENDRA RUPNAR; Engineer: PRAMOD BHAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EQUINOX I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EQUINOX I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EQUINOX I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.