New projects and RERA data in Thane district, Maharashtra

7631 projects are registered in Thane district: 506,591 units across them, 618 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

7631Projects covered
618Registered, last 12 months
506,591Units declared
307,988Units not yet booked
1841Completion dates revised
390With declared litigation

Of the 7631 covered registrations, 1841 have revised their promised completion date and 390 declare litigation. The median project here is 26% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Free · a new edition every month

Thane monthly RERA report

What registered month by month, this city against its own twelve-month run and against the other six, with the possession pipeline, the taluka split and the busiest pincodes. Built from the same filings as this page.

September 2026: 52 new registrations, 5,920 homes and units, 2 complaints filed.

When Thane projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 7,631 projects with a promised date, 2,659 are recorded delivered, 3,142 are still on the register and 1,830 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

05001,0001,5002,000today2017: 57 projects, delivered2017: 3 projects, registration lapsed or cancelled’172018: 376 projects, delivered2018: 38 projects, registration lapsed or cancelled’182019: 314 projects, delivered2019: 78 projects, registration lapsed or cancelled’192020: 133 projects, delivered2020: 52 projects, registration lapsed or cancelled’202021: 242 projects, delivered2021: 118 projects, registration lapsed or cancelled’212022: 355 projects, delivered2022: 214 projects, registration lapsed or cancelled’222023: 380 projects, delivered2023: 313 projects, registration lapsed or cancelled’232024: 334 projects, delivered2024: 341 projects, registration lapsed or cancelled’242025: 272 projects, delivered2025: 432 projects, registration lapsed or cancelled’252026: 161 projects, delivered2026: 623 projects, on the register2026: 232 projects, registration lapsed or cancelled’262027: 28 projects, delivered2027: 846 projects, on the register2027: 4 projects, registration lapsed or cancelled’272028: 4 projects, delivered2028: 700 projects, on the register2028: 1 projects, registration lapsed or cancelled’282029: 2 projects, delivered2029: 449 projects, on the register2029: 2 projects, registration lapsed or cancelled’292030: 271 projects, on the register2030: 1 projects, registration lapsed or cancelled’302031: 150 projects, on the register2031: 1 projects, registration lapsed or cancelled’312032: 58 projects, on the register’322033: 21 projects, on the register’332034: 1 projects, delivered2034: 9 projects, on the register’342035: 8 projects, on the register’35

3,572 projects promise possession in 2026 or later. Years outside 2017 to 2035 hold 7 further projects and are not shown. Facts as per filings on RERA website.

025k50k75k100ktoday’172018: 2 flats, delivered (only 5 of 414 projects filed a flat count)2018: 113 flats, registration lapsed or cancelled (only 5 of 414 projects filed a flat count)’182019: 205 flats, delivered (only 6 of 392 projects filed a flat count)2019: 372 flats, registration lapsed or cancelled (only 6 of 392 projects filed a flat count)’192020: 53 flats, delivered (only 2 of 185 projects filed a flat count)2020: 32 flats, registration lapsed or cancelled (only 2 of 185 projects filed a flat count)’202021: 107 flats, delivered (only 12 of 360 projects filed a flat count)2021: 379 flats, registration lapsed or cancelled (only 12 of 360 projects filed a flat count)’212022: 788 flats, delivered (only 21 of 569 projects filed a flat count)2022: 1,208 flats, registration lapsed or cancelled (only 21 of 569 projects filed a flat count)’222023: 426 flats, delivered (only 37 of 693 projects filed a flat count)2023: 6,144 flats, registration lapsed or cancelled (only 37 of 693 projects filed a flat count)’232024: 124 flats, delivered (only 35 of 675 projects filed a flat count)2024: 1,147 flats, registration lapsed or cancelled (only 35 of 675 projects filed a flat count)’242025: 8,448 flats, delivered (only 186 of 704 projects filed a flat count)2025: 15,150 flats, registration lapsed or cancelled (only 186 of 704 projects filed a flat count)’252026: 14,038 flats, delivered2026: 63,605 flats, on the register2026: 16,350 flats, registration lapsed or cancelled’262027: 2,387 flats, delivered2027: 96,734 flats, on the register’272028: 105 flats, delivered2028: 98,154 flats, on the register’282029: 66,493 flats, on the register2029: 1 flats, registration lapsed or cancelled’292030: 46,969 flats, on the register’302031: 37,769 flats, on the register2031: 4 flats, registration lapsed or cancelled’312032: 17,066 flats, on the register’322033: 7,911 flats, on the register’332034: 2,293 flats, on the register’342035: 1,209 flats, on the register’35

471,088 flats are promised in 2026 or later, across the 82% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Years outside 2017 to 2035 hold 7 further projects and are not shown. Facts as per filings on RERA website.

How far Thane possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 1,832 of 7,630 projects (24%) have moved at least once; the median move is 18 months and the longest is 120 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

02505007501,000Originally due 2017: 60 projects kept the original date, 75% of the yearOriginally due 2017: 16 projects moved by under 2 years, 20% of the yearOriginally due 2017: 4 projects moved by 2 years or more, 5% of the year’17Originally due 2018: 385 projects kept the original date, 68% of the yearOriginally due 2018: 117 projects moved by under 2 years, 21% of the yearOriginally due 2018: 63 projects moved by 2 years or more, 11% of the year’18Originally due 2019: 296 projects kept the original date, 59% of the yearOriginally due 2019: 73 projects moved by under 2 years, 15% of the yearOriginally due 2019: 134 projects moved by 2 years or more, 27% of the year’19Originally due 2020: 103 projects kept the original date, 54% of the yearOriginally due 2020: 41 projects moved by under 2 years, 21% of the yearOriginally due 2020: 48 projects moved by 2 years or more, 25% of the year’20Originally due 2021: 269 projects kept the original date, 64% of the yearOriginally due 2021: 67 projects moved by under 2 years, 16% of the yearOriginally due 2021: 86 projects moved by 2 years or more, 20% of the year’21Originally due 2022: 440 projects kept the original date, 71% of the yearOriginally due 2022: 93 projects moved by under 2 years, 15% of the yearOriginally due 2022: 91 projects moved by 2 years or more, 15% of the year’22Originally due 2023: 543 projects kept the original date, 72% of the yearOriginally due 2023: 81 projects moved by under 2 years, 11% of the yearOriginally due 2023: 131 projects moved by 2 years or more, 17% of the year’23Originally due 2024: 518 projects kept the original date, 67% of the yearOriginally due 2024: 122 projects moved by under 2 years, 16% of the yearOriginally due 2024: 136 projects moved by 2 years or more, 18% of the year’24Originally due 2025: 502 projects kept the original date, 63% of the yearOriginally due 2025: 200 projects moved by under 2 years, 25% of the yearOriginally due 2025: 89 projects moved by 2 years or more, 11% of the year’25Originally due 2026: 607 projects kept the original date, 80% of the yearOriginally due 2026: 115 projects moved by under 2 years, 15% of the yearOriginally due 2026: 35 projects moved by 2 years or more, 5% of the year’26Originally due 2027: 607 projects kept the original date, 94% of the yearOriginally due 2027: 29 projects moved by under 2 years, 4% of the yearOriginally due 2027: 9 projects moved by 2 years or more, 1% of the year’27Originally due 2028: 595 projects kept the original date, 96% of the yearOriginally due 2028: 19 projects moved by under 2 years, 3% of the yearOriginally due 2028: 6 projects moved by 2 years or more, 1% of the year’28Originally due 2029: 403 projects kept the original date, 96% of the yearOriginally due 2029: 12 projects moved by under 2 years, 3% of the yearOriginally due 2029: 3 projects moved by 2 years or more, 1% of the year’29Originally due 2030: 235 projects kept the original date, 98% of the yearOriginally due 2030: 4 projects moved by under 2 years, 2% of the yearOriginally due 2030: 1 projects moved by 2 years or more, 0% of the year’30Originally due 2031: 137 projects kept the original date, 98% of the yearOriginally due 2031: 3 projects moved by under 2 years, 2% of the year’31Originally due 2032: 53 projects kept the original date, 93% of the yearOriginally due 2032: 4 projects moved by under 2 years, 7% of the year’32Originally due 2033: 19 projects kept the original date, 100% of the year’33Originally due 2034: 11 projects kept the original date, 100% of the year’34Originally due 2035: 8 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

025k50k75k100kOriginally due 2017: 42 flats moved by 2 years or more, 5% of the year (only 2 of 80 projects filed a flat count)’17Originally due 2018: 115 flats kept the original date, 68% of the year (only 13 of 565 projects filed a flat count)Originally due 2018: 700 flats moved by 2 years or more, 11% of the year (only 13 of 565 projects filed a flat count)’18Originally due 2019: 577 flats kept the original date, 59% of the year (only 23 of 503 projects filed a flat count)Originally due 2019: 32 flats moved by under 2 years, 15% of the year (only 23 of 503 projects filed a flat count)Originally due 2019: 2,410 flats moved by 2 years or more, 27% of the year (only 23 of 503 projects filed a flat count)’19Originally due 2020: 53 flats kept the original date, 54% of the year (only 17 of 192 projects filed a flat count)Originally due 2020: 21 flats moved by under 2 years, 21% of the year (only 17 of 192 projects filed a flat count)Originally due 2020: 2,292 flats moved by 2 years or more, 25% of the year (only 17 of 192 projects filed a flat count)’20Originally due 2021: 458 flats kept the original date, 64% of the year (only 44 of 422 projects filed a flat count)Originally due 2021: 22 flats moved by under 2 years, 16% of the year (only 44 of 422 projects filed a flat count)Originally due 2021: 4,076 flats moved by 2 years or more, 20% of the year (only 44 of 422 projects filed a flat count)’21Originally due 2022: 1,954 flats kept the original date, 71% of the year (only 64 of 624 projects filed a flat count)Originally due 2022: 286 flats moved by under 2 years, 15% of the year (only 64 of 624 projects filed a flat count)Originally due 2022: 6,584 flats moved by 2 years or more, 15% of the year (only 64 of 624 projects filed a flat count)’22Originally due 2023: 5,011 flats kept the original date, 72% of the year (only 136 of 755 projects filed a flat count)Originally due 2023: 444 flats moved by under 2 years, 11% of the year (only 136 of 755 projects filed a flat count)Originally due 2023: 14,415 flats moved by 2 years or more, 17% of the year (only 136 of 755 projects filed a flat count)’23Originally due 2024: 680 flats kept the original date, 67% of the year (only 198 of 776 projects filed a flat count)Originally due 2024: 9,392 flats moved by under 2 years, 16% of the year (only 198 of 776 projects filed a flat count)Originally due 2024: 17,086 flats moved by 2 years or more, 18% of the year (only 198 of 776 projects filed a flat count)’24Originally due 2025: 12,474 flats kept the original date, 63% of the year (only 378 of 791 projects filed a flat count)Originally due 2025: 23,459 flats moved by under 2 years, 25% of the year (only 378 of 791 projects filed a flat count)Originally due 2025: 15,109 flats moved by 2 years or more, 11% of the year (only 378 of 791 projects filed a flat count)’25Originally due 2026: 47,405 flats kept the original date, 80% of the yearOriginally due 2026: 25,878 flats moved by under 2 years, 15% of the yearOriginally due 2026: 5,959 flats moved by 2 years or more, 5% of the year’26Originally due 2027: 55,382 flats kept the original date, 94% of the yearOriginally due 2027: 7,097 flats moved by under 2 years, 4% of the yearOriginally due 2027: 1,893 flats moved by 2 years or more, 1% of the year’27Originally due 2028: 75,997 flats kept the original date, 96% of the yearOriginally due 2028: 3,238 flats moved by under 2 years, 3% of the yearOriginally due 2028: 1,757 flats moved by 2 years or more, 1% of the year’28Originally due 2029: 55,960 flats kept the original date, 96% of the yearOriginally due 2029: 2,981 flats moved by under 2 years, 3% of the yearOriginally due 2029: 274 flats moved by 2 years or more, 1% of the year’29Originally due 2030: 39,101 flats kept the original date, 98% of the yearOriginally due 2030: 975 flats moved by under 2 years, 2% of the yearOriginally due 2030: 895 flats moved by 2 years or more, 0% of the year’30Originally due 2031: 34,387 flats kept the original date, 98% of the yearOriginally due 2031: 542 flats moved by under 2 years, 2% of the year’31Originally due 2032: 15,917 flats kept the original date, 93% of the yearOriginally due 2032: 1,133 flats moved by under 2 years, 7% of the year’32Originally due 2033: 7,361 flats kept the original date, 100% of the year’33Originally due 2034: 2,526 flats kept the original date, 100% of the year’34Originally due 2035: 1,435 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Thane

Who sanctions building in Thane

3,219 of the 7,631 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Kalyan Dombivli Municipal Corporation691
Thane Municipal Corporation574
Kulgaon Badlapur Municipal Council237
Mira Bhayandar Municipal Corporation207
318 other bodies1,510

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 7,631 registrations on this page answers this: on 3,775 the promoter is the only owner named; on 3,314 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 542 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Thane: projects by taluka

7,631 of the 7,631 registrations on this page name their taluka.

TalukaProjectsShare
Thane2,71836%
Kalyan2,14228%
Ambarnath1,65122%
Bhiwandi4856%
Shahapur2503%
4 other talukas3855%

Projects in Thane

Showing 1 to 60 of 7,631 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
CHADHA RESIDENCYSHIL AND KARAV, 421501CHADHA DEVELOPERS AND PROMOTERS82280%5 Apr 2021Registered
Plot No -1A,Sector -19, Vashi Truck TerminalVashi Node, 400703CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED31790%31 Jul 2021Registered
GODREJ UPAVANBHADVAD & TEMGHAR, 421302PRAKHHYAT DWELLINGS LLP297819%10 Dec 2020Registered
Constrcution of 2557 EWS tenements at S.No.157/1,village Gotheghar,Tal . Dist.-Thane PMAY ProjectNEAR MSETCL RECIEVING STATION,UTTARSHIV VILLAGE ROAD, 421204ARUN SHANKARRAO BORGAVE25910%4 Jun 2021Registered
PRADHAN MANTRI AWAS YOJANA - URBANBADLAPUR EAST, 421503KULGAON BADLAPUR MUNICIPAL COUNCIL23520%12 Jan 2023Registered
Runwal Gardens Phase IDombivli, 421204Runwal Residency Private Limited193797%12 Oct 2019Registration lapsed
Hiranandani Westgate Phase 1Kavesar, 400607SHODEN DEVELOPERS PRIVATE LIMITED184440%2 Aug 2024Registered
DGT - Sector 3A - Cluster 2 - Phase 1Kalher Junction, 421302ADRIKA DEVELOPERS PRIVATE LIMITED183674%26 Dec 2022Registered
DOSTI GREATER THANE - PHASE 1NEAR UMIYA COMPLEX AND S S HOSPITAL, 421302ADRIKA DEVELOPERS PRIVATE LIMITED180699%12 Mar 2020Registration lapsed
RUNWAL EIRENE - PART IThane, 400608Runwal Developers Private Limited157297%9 Aug 2017Completed
Codename StarLifeBhayander East, 401107JP Infra Realty Private Limited153961%15 Jan 2024Registered
Prestige Garden TrailsMira-Bhayandar (M Corp.), 401107PRESTIGE ESTATES PROJECTS LIMITED136459%13 Oct 2025Registered
KALAS DARSHANTitwala, 421605JAY GANESH DEVELOPERS135778%17 Mar 2022Registered
DOSTI PLANET NORTH - SECTOR 3NEAR SHILPHATA, 400612CHALAMA INFRAPROPERTIES PRIVATE LIMITED134544%28 Apr 2022Registered
Birla Taranya - Phase 1Ground Floor, Hindalco Industries, 400605Ekamaya Properties Private Limited13390%3 Feb 2026Registered
Forestville - Phase 1Kolshet, 400607Oberoi Realty Limited125726%1 Apr 2023Registered
Runwal Garden City Cluster 6 Tower 6 to 9Dombivali, 421204HORIZON PROJECTS PVT LTD118629%11 Sep 2023Registered
Godrej Emerald ThaneGhodbunder, 400615Godrej Greenview Housing Private Limited118397%5 Jul 2017Completed
NIFT City - BKC II Building ATTC Industrial Area, MIDC Kalwa, Navi Mumbai, 400708DELTA VENUS INFRA LLP10620%17 Mar 2026Registered
ASHAR PULSEMAJIWADA, 400601Ms ASHAR VENTURES104768%31 Oct 2022Registered
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2MIRA ROAD EAST, 401107PNK SPACE DEVELOPMENT PVT LTD102864%24 Aug 2017Registered
Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1Kalher Junction, Bhiwandi, 421302ADRIKA DEVELOPERS PRIVATE LIMITED102549%12 Oct 2023Registered
Godrej Riviera Phase 1Kalyan, 421102GODREJ PROPERTIES LIMITED102187%11 Jan 2022Registered
USHA RESIDENCYBHIWANDI, 421302SHREE BUDHDEV INFRA102091%27 Oct 2023Registered
NORTH IMPERIAL GREENS -TOWER 2GHODBUNDER ROAD, 400615Skylark Buildspace Private Limited101650%15 Feb 2024Registered
Kamdhenu 23 West GrandeKhairane, 400709Accura Developers LLP100837%2 Apr 2024Registered
VIHANG MARINABHAYENDERPADA, 400615BALAJI ENTERPRISES9840%28 Apr 2022Registered
Dosti West County - Dosti Nest - Phase 1Balkum Thane, 400608DOSTI ENTERPRISES95095%2 Mar 2022Registered
BELLA VISTA PHASE 8SHAHAPUR, 421601INDO ASIAN BUILDCON PVT LTD9460%26 Dec 2017Registration lapsed
The Palace Tower BVinay Nagar, 401107JP Infra Realty Private Limited94270%22 Feb 2022Registered
OGC Thane Phase 1Thane (M Corp.), 400610Oberoi Realty Limited93455%8 Oct 2024Registered
KAMDHENU SHARAYUBonsari, Turbhe, 400703Arpee Consultants LLP9090%8 Jul 2026Registered
Sai World One CommercialShirvane, 410706Paradise Green-spaces LLP9070%12 Aug 2026Registered
Runwal Gardens Phase 6A Bldg No. 53-54Dombivali, 421204Runwal Residency Private Limited90324%8 Jun 2023Registered
DOSTI WEST COUNTY - PHASE 4- DOSTI PINEBALKUM, 400607DOSTI ENTERPRISES90196%19 Jul 2020Registered
Mahindra Happinest Kalyan-2 Project ARanjnoli, 421311Mahindra Lifespace Developers limited89963%2 Feb 2022Registered
Raheja Prime-2TTC Industrial Area, 400705Raheja Universal (Pvt.) Ltd.89541%16 Jun 2025Registered
Puranik City Reserva Phase 1Near Puranik City, 400615Puranik Builders Limited87989%25 Jul 2017Registered
NARAYANI DHAM BUILDING NO 2A AND 2BBHIWANDI, 421302MAYA DEVELOPER86998%1 Oct 2018Registered
North Westend Tower 1Bhayander, 401101JP Infra Realty Private Limited86530%8 Nov 2023Registered
NMS Gami Palm AmoreNERUL NAVI MUMBAI, 400706VISION INFRA LLP86142%21 Aug 2023Registered
NORTH IMPERIAL GREENS - TOWER 1VILLAGE - OWALE, 400615Skylark Buildspace Private Limited84532%29 Oct 2024Registered
REGENCY ANANTAM NXT PHASE IDombivli, 421203REGENCY NIRMAN LTD83258%23 Apr 2024Registered
DGT - Sector 3A - Cluster 2 - Phase 2Kalher Junction, 421302ADRIKA DEVELOPERS PRIVATE LIMITED83070%26 Dec 2022Registered
RGC Runwal My City EWS - LIG BuildingDombivali, 421204HORIZON PROJECTS PVT LTD82553%3 Feb 2025Registered
SAI WORLD DREAMS PHASE 1Dombivali East, 421205Out N Out Infotech India LLP82280%10 May 2022Registered
Kamdhenu Synergy SquarePawne, 400703Krsna Dynasty8190%15 Jul 2026Registered
THE GOLDEN MILEMOHARAI, 420421GRACELANDS HABITATS8050%15 Feb 2018Registration lapsed
DELTA PALMBEACHNerul, 400706BALAJI CORPORATION80329%24 Jul 2023Registered
Cyber Square - 1LP, NERUL, 400706GREENSCAPE IT PARK LLP7977%10 May 2022Registered
BALAJI ESTATE PHASE 2KHONI UMBROLI ROAD, 421204M/S SAI BALAJI BUILDCON78962%3 Dec 2021Registered
Y SQUAREDhokali, 400607SHREE MALLINATH ENTERPRISE LLP78648%15 Mar 2018Registered
Crown Dombivli 2Mangaon, 421203LODHA DEVELOPERS LIMITED778100%1 Feb 2023Registered
Mohan Alcoves IValivali, 421503MOHAN LIFESPACES LLP77120%10 Nov 2023Registered
Runwal Gardens Phase 2 Bldg no 13-17DOMBIVLI, 421204Runwal Residency Private Limited76194%1 Jul 2020Completed
Raheja Lunaris-2MIDC Industrial Area, 400705Raheja Universal (Pvt.) Ltd.7600%15 Dec 2025Registered
RAUNAK 108OWALE VILLAGE, 400615UNNATHI ASSOCIATES76073%2 Mar 2021Registered
Charms Padamavati Royal Phase 2S No 89 1A, 95 1A 95 2 and 95 10, 421605Charms Developers74613%18 May 2022Registered
USHA GREENSNarpoli, 421302Navdeep Realtors7460%7 Aug 2026Registered
VIHANG LUXURIAMIRE VILLAGE, 401105REYANSHP REALTY LLP74473%1 Feb 2023Registered
Planning a launch in Thane? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Thane

LODHA DEVELOPERS LIMITED (91), MACROTECH DEVELOPERS LIMITED (83), Palava Dwellers Private Limited (55), Nirmal Lifestyle (Kalyan) Private Limited (30), ROMA BUILDERS PRIVATE LIMITED (29), REGENCY NIRMAN LTD (28). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Thane projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 26% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Thane project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Thane district?

Within the municipal corporation areas of Thane district the rate is 7 percent for men and joint buyers and 6 percent for a woman buying in her sole name (metro cess and local body tax included). Municipal council areas pay 4 percent and gram panchayat areas 3 percent. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Thane registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Thane project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.