Home / Browse projects / Pune, Maharashtra / AISHWARYAM INSIGNIA

Registered No litigation declared Others project

AISHWARYAM INSIGNIA

By VIKSAK VINODE INFRATECH LLP

RG-MH-27447 · RERA P52100033510 · Last updated on MahaRERA portal: 22 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 10 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedmoved 10 months from the original
21 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 98%
78 of 952Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 173 documents Report an error

AISHWARYAM INSIGNIA is a Others project by VIKSAK VINODE INFRATECH LLP in Pune, Maharashtra, registered with MahaRERA as P52100033510 on 22 Feb 2022. Possession is promised by 30 Oct 2027. The completion date has moved by 10 months from the original filing. 874 of the 952 units on this registration are recorded sold or booked, and 21 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAISHWARYAM INSIGNIA
  • TypeOthers
  • Location
    • KATEWASTI
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033510
  • ReraGenie IDRG-MH-27447

Builder

  • NameVIKSAK VINODE INFRATECH LLP
  • Entity typePartnership
  • GSTIN27AAUFV8582G1Z8
  • PartnersSATISH BHIMSEN AGARWAL, NARENDRA BHIMSEN AGARWAL, SURENDRA BHIMSEN AGARWAL, NITIN BHIMSEN AGARWAL, ANANDA GANPAT VINODE, AMOL ANANDA VINODE, RAHUL ANANDA VINODE, TUKARAM GANPAT VINODE, VIKRAM BALASAHEB VINODE

Key dates

this monthRegisteredFeb 2022First promiseDec 2026Revised toOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2022
  • Promised completion30 Oct 2027
  • Revised completionRevised to 30 Oct 2027 (originally 31 Dec 2026)
  • Buildings5 building records
  • Documents filed173 files

Current status

92%874 of 952 units booked
93.3%Work done, per cost certificate

Figures as on 22 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA28253310331
BNA27241790179
CNA27243170317
DNA131247047
ENA88443478

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 22 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 98%.

A71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises73%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
B77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.86%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
C67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises54%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes35%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1792

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,792
Closed/Covered1,765
Open Space27
BuildingClosed/CoveredOpen SpaceTotal
A6060606
B3280328
C5830583
D8827115
E1600160

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Oct 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI74530.4
Proposed, not sanctioned74,515 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIGDI, PUNE
Estimated costRs 193.13 cr
Cost incurredRs 180.23 cr
Work done93.32%
BuildingWingEstimatedIncurred
ANARs 65.03 crRs 63.73 cr
CNARs 63.01 crRs 56.71 cr
BNARs 40.55 crRs 40.55 cr
-NARs 9.39 crRs 9.20 cr
ENARs 8.24 crRs 3.13 cr
DNARs 6.90 crRs 6.90 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ TATOOSKAR
EngineerShrikant Shinde
EngineerSNEHA SAWANT
EngineerChetan V Kamate
EngineerG.A. Bhilare Consultants Pvt Ltd.
Chartered AccountantOSWAL SOLANKI
Chartered AccountantSheetal Jindal
Chartered AccountantAkshay Oswal
Chartered AccountantOswal Solanki & Associates
PartnerRole in project
VIKSAK VINODE INFRATECH LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100033510/WarDec 2026 → Oct 2027

Reason as filed by the promoterNA

EA29122519115Dec 2026 → Jun 2027

Reason as filed by the promoterTo, The Secretary, Maharashtra Real Estate Regulatory Authority (MahaRERA), Mumbai. Subject: Application for Extension of Registration under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016 for the Project AISHWARYAM INSIGNIA (RERA No. P52100033510) Respected Sir/Madam, We, the promoters of the project AISHWARYAM INSIGNIA, registered with the Authority under Registration No. P52100033510, humbly submit this application seeking an extension of the project registration. The current registration for Wings A and B is valid till 31st December 2025, and we request an extension

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604780Ashish Sukhadeo GaikwadVIKSAK VINODE INFRATECH LLP29/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2027

Documents filed173

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Insignia form 2A.pdf22 Sep 2026
Withdrawal Update Form 1File: Insignia June form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Insignia June form 2.pdf16 Jul 2026
Withdrawal Update Form 3File: Insignia June form 3.pdf16 Jul 2026
Withdrawal Update Form 1File: Insignia Form 1.pdf24 Apr 2026
Withdrawal Update Form 2File: Insignia form 2.pdf24 Apr 2026
Withdrawal Update Form 3File: Insignia Form 3 March.pdf24 Apr 2026
Withdrawal Update Form 1File: Insignia form 1 Dec.pdf3 Feb 2026
Withdrawal Update Form 2File: Insignia Form 2 Dec.pdf3 Feb 2026
Withdrawal Update Form 3File: Insignia Form 3 Dec.pdf3 Feb 2026
Withdrawal Update Form 1File: Insignia form 1.pdf27 Jan 2026
Withdrawal Update Form 2File: Insignia form 2.pdf27 Jan 2026
Withdrawal Update Form 3File: Insignia form 3.pdf27 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Insignia 2025.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: Insignia Form 5.pdf22 Jan 2026
Layout approvalFile: Layout.pdf23 Dec 2025
Layout approvalFile: Layout Approval .pdf23 Dec 2025
Layout approvalFile: 1.pdf15 Dec 2025
Building plan approvalFile: 2.pdf15 Dec 2025
Building plan approvalFile: 3.pdf15 Dec 2025
Building plan approvalFile: 4.pdf15 Dec 2025
Building plan approvalFile: 5.pdf15 Dec 2025
Building plan approvalFile: A Building.pdf15 Dec 2025
Building plan approvalFile: 7.pdf15 Dec 2025
Building plan approvalFile: 8.pdf15 Dec 2025
Building plan approvalFile: 9.pdf15 Dec 2025
Building plan approvalFile: 10.pdf15 Dec 2025
Building plan approvalFile: 11.pdf15 Dec 2025
Building plan approvalFile: 12.pdf15 Dec 2025
Building plan approvalFile: B Building.pdf15 Dec 2025
Building plan approvalFile: 14.pdf15 Dec 2025
Building plan approvalFile: 15.pdf15 Dec 2025
Building plan approvalFile: 16.pdf15 Dec 2025
Building plan approvalFile: C Building.pdf15 Dec 2025
Building plan approvalFile: 18.pdf15 Dec 2025
Building plan approvalFile: 19.pdf15 Dec 2025
Building plan approvalFile: 20.pdf15 Dec 2025
Building plan approvalFile: 21.pdf15 Dec 2025
Building plan approvalFile: 22.pdf15 Dec 2025
Building plan approvalFile: D Building.pdf15 Dec 2025
Building plan approvalFile: 24.pdf15 Dec 2025
Building plan approvalFile: E Building.pdf15 Dec 2025
Building plan approvalFile: 26.pdf15 Dec 2025
Building plan approvalFile: 27.pdf15 Dec 2025
Building plan approvalFile: 28.pdf15 Dec 2025
Withdrawal Update Form 1File: Insignia form sep -2 5.pdf15 Dec 2025
Withdrawal Update Form 2File: Insignia form 2 sep-25.pdf15 Dec 2025
Withdrawal Update Form 3File: Insignia from 3 sep-25 (1).pdf15 Dec 2025
Layout approvalFile: 1_11zon.pdf30 Oct 2025
Building plan approvalFile: 2_11zon.pdf30 Oct 2025
Building plan approvalFile: 3_11zon.pdf30 Oct 2025
Building plan approvalFile: 4.pdf30 Oct 2025
Building plan approvalFile: 5.pdf30 Oct 2025
Building plan approvalFile: 6.pdf30 Oct 2025
Building plan approvalFile: 7.pdf30 Oct 2025
Building plan approvalFile: 8.pdf30 Oct 2025
Building plan approvalFile: 9.pdf30 Oct 2025
Building plan approvalFile: 10.pdf30 Oct 2025
Building plan approvalFile: 11.pdf30 Oct 2025
Building plan approvalFile: 12.pdf30 Oct 2025
Building plan approvalFile: 13.pdf30 Oct 2025
Building plan approvalFile: 14.pdf30 Oct 2025
Building plan approvalFile: 15.pdf30 Oct 2025
Building plan approvalFile: 16.pdf30 Oct 2025
Building plan approvalFile: 17.pdf30 Oct 2025
Building plan approvalFile: 18.pdf30 Oct 2025
Building plan approvalFile: 19.pdf30 Oct 2025
Building plan approvalFile: 20.pdf30 Oct 2025
Building plan approvalFile: 21.pdf30 Oct 2025
Building plan approvalFile: 22.pdf30 Oct 2025
Building plan approvalFile: 23.pdf30 Oct 2025
Building plan approvalFile: 24.pdf30 Oct 2025
Building plan approvalFile: 25.pdf30 Oct 2025
Building plan approvalFile: 26.pdf30 Oct 2025
Building plan approvalFile: 27.pdf30 Oct 2025
Building plan approvalFile: 28.pdf30 Oct 2025
Withdrawal Update Form 1File: Insignia form sep -2 5.pdf29 Oct 2025
Withdrawal Update Form 2File: Insignia form 2 sep-25.pdf29 Oct 2025
Withdrawal Update Form 3File: Insignia from 3 sep-25 (1).pdf29 Oct 2025
Withdrawal Update Form 1File: insignia form 1 - june 2025_organized.pdf25 Oct 2025

How this compares with Pune

92%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 10 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AISHWARYAM INSIGNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmAISHWARYAM INSIGNIACompleted 71Lapsed / revoked 27Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 176 registered projects within 2 km.

Builder: VIKSAK VINODE INFRATECH LLP

VIKSAK VINODE INFRATECH LLP has 1 registration on MahaRERA, including AISHWARYAM INSIGNIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AISHWARYAM INSIGNIA is delayed beyond 30 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AISHWARYAM INSIGNIA?

The registered promoter entity is VIKSAK VINODE INFRATECH LLP, a partnership as per the filing. Its GSTIN 27AAUFV8582G1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AISHWARYAM INSIGNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AISHWARYAM INSIGNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AISHWARYAM INSIGNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AISHWARYAM INSIGNIA?

The professionals named in the filing: Architect: MANOJ TATOOSKAR; Engineer: Shrikant Shinde; Engineer: SNEHA SAWANT; Engineer: Chetan V Kamate; Engineer: G.A. Bhilare Consultants Pvt Ltd.; Chartered Accountant: OSWAL SOLANKI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AISHWARYAM INSIGNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AISHWARYAM INSIGNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AISHWARYAM INSIGNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.