Home / Browse projects / Pune, Maharashtra / Yashwin Enchante Phase 2
Yashwin Enchante Phase 2
By Vilas Javdekar Infinitee Developers Pvt. Ltd.
RG-MH-18463 · RERA P52100077455 · Last updated on MahaRERA portal: 20 Oct 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
- Rs 200.00 crore secured on the land, in favour of Standard Chartered Bank
Clear
- No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Yashwin Enchante Phase 2 is a Others project by Vilas Javdekar Infinitee Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100077455 on 16 Aug 2024. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 187 of the 1,100 units on this registration are recorded sold or booked, and 15 of 64 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameYashwin Enchante Phase 2
- TypeOthers
- Location
- Wagholi
- Haveli
- Pune
- 412207
- Pincode412207
- RERA no.P52100077455
- ReraGenie IDRG-MH-18463
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Aug 2024
- Promised completion30 Apr 2030
- Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
- Buildings6 building records
- Documents filed204 files
Current status
Figures as on 20 Oct 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building G1 - G2 | NA | 27 | 23 | 180 | 14 | 194 |
| Building H1- H2 | NA | 27 | 23 | 159 | 6 | 165 |
| Building I1- I2 | NA | 27 | 23 | 225 | 0 | 225 |
| Building J1 - J2 | NA | 25 | 23 | 204 | 0 | 204 |
| Building K1- K2 | NA | 25 | 23 | 225 | 0 | 225 |
| Commercial Building | NA | 3 | 0 | 0 | 87 | 87 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 20 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 64 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
Building G1 - G218%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building H1- H218%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building I1- I218%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building J1 - J249%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building K1- K240%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Commercial Building30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1490
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building G1 - G2 | 270 | 270 |
| Building H1- H2 | 238 | 238 |
| Building I1- I2 | 338 | 338 |
| Building J1 - J2 | 306 | 306 |
| Building K1- K2 | 338 | 338 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 79.17 cr | Rs 26.80 cr |
| Building I1- I2 | NA | Rs 69.78 cr | Rs 24.01 cr |
| Building K1- K2 | NA | Rs 69.48 cr | Rs 37.51 cr |
| Building G1 - G2 | NA | Rs 65.38 cr | Rs 13.37 cr |
| Building J1 - J2 | NA | Rs 64.45 cr | Rs 36.35 cr |
| Building H1- H2 | NA | Rs 53.77 cr | Rs 18.96 cr |
| Commercial Building | NA | Rs 28.77 cr | Rs 2.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deepali Patidar |
| Architect | Voussoirs |
| Engineer | Sagar Kale |
| Chartered Accountant | Sunil Nimbalkar |
| Chartered Accountant | Abhijit Mundada |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Infinitee Developers Pvt. Ltd. | - |
Extensions1
A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.
Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 578/2021 | Civil Court Pune | Ongoing |
| 101/2023 | Civil Court Pune | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500770 | Virendra Uttam Chavan | Vilas Javdekar Infinitee Developers Pvt. Ltd. | 06/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Aug 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2030
Documents filed204
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 204 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR Certificate Enchante PH 2 30-09-26.pdf | 20 Oct 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Enchante PH 2 30-09-26 .pdf | 20 Oct 2026 |
| Withdrawal Update Form 3File: CA Certificate Enchante Ph-2 30-09-2026 Compress.pdf | 20 Oct 2026 |
| Form 5 (FY 2025-2026)File: Form 5_ Enchante PH 2 P52100077455.pdf | 21 Sep 2026 |
| Withdrawal Update Form 1File: Architect Certificate Enchante PH 2 30-06-26.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certifcate Enchante PH 2 30-06-26.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: CA certificate Enchante Phase 2_30-06-2026Signed.pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2 A Enchante PH 2 Signed.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate Enchnate Phase 2 31-03-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate Enchnate Phase 2 31-03-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Yashwin Enchante Phase 2_31032026 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Yashwin Enchante Phase 2_31032026 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Scanned Copy of Yashwin Enchante PH-2 Compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Scanned Copy of Yashwin Enchante PH-2 Compressed.pdf | 20 Apr 2026 |
| Layout approvalFile: 1321 Wagholi Ph 2_Sactioned layout for RERA- As per sanction dated 04022026_ph2_compressed | 7 Feb 2026 |
| Building plan approvalFile: 02- Basement 2 Floor Plan.pdf | 6 Feb 2026 |
| Building plan approvalFile: 03- Basement Floor Plan.pdf | 6 Feb 2026 |
| Building plan approvalFile: 04- Lower Ground Floor Plan.pdf | 6 Feb 2026 |
| Building plan approvalFile: 05- Stilt Floor Plan.pdf | 6 Feb 2026 |
| Building plan approvalFile: 26- Stilt and 1st Floor Plan (Building G1-G2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 27- Typical and Terrace Floor Plan (Building G1-G2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 28- Section (Building G1-G2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 29- Section and Elevation (Building G1-G2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 30- Stilt and 1st Floor Plan (Building H1-H2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 31- Typical and Terrace Floor Plan (Building H1-H2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 32- Section (Building H1-H2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 33- Section and Elevation (Building H1-H2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 34- Stilt 1st and 2nd Floor Plan (Building I1-I2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 35- Typical andTerrace Floor Plan (Building I1-I2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 36- Section (Building I1-I2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 37- Elevation (Building I1-I2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 38- 1st 2nd and Typical Floor Plan (Building J1-J2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 39- Typical and Terrace Floor Plan (Building J1-J2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 40- Section (Building J1-J2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 41- Elevation (Building J1-J2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 42- 1st 2nd and Typical Floor Plan (Building K1-K2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 43- Typical and Terrace Floor Plan (Building K1-K2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 44- Section (Building K1-K2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 45- Elevation (Building K1-K2).pdf | 6 Feb 2026 |
| Building plan approvalFile: 46- Lower Ground and Stilt Floor Plan (Commercial Building).pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate Enchnate PH 2 31-12-25.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Enchante PH 2 31-12-25.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate Enchante PH 2 31-12-25 .pdf | 16 Jan 2026 |
| Layout approvalFile: 01- Building Layout_highlighted.pdf | 6 Nov 2025 |
| Building plan approvalFile: 02- Basement- 2 Floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 03- Basement floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 04- Lower ground floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 05- Stilt floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 06- 1st floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 07- 2nd-Podium floor plan.pdf | 6 Nov 2025 |
| Building plan approvalFile: 35- Building H1-H2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 36- Building H1-H2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 37- Building H1-H2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 38- Building H1-H2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 39- Building I1-I2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 40- Building I1-I2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 41- Building I1-I2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 42- Building I1-I2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 43- Building J1-J2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 44- Building J1-J2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 45- Building J1-J2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 46- Building J1-J2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 47- Building K1-K2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 48- Building K1-K2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 49- Building K1-K2.pdf | 6 Nov 2025 |
| Building plan approvalFile: 50- Building K1-K2.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: Architect certificate Enchante PH 2 30-09-25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate Enchante PH 2 30-09-25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate Enchante PH 2 30-09-25.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: VJIDPL_FORM 5_P52100077455_Enchante2.pdf | 30 Sep 2025 |
| Layout approvalFile: Enchante Phase 2_revised sanctioned layout_compressed.pdf | 18 Aug 2025 |
| Withdrawal Update Form 1File: Architech Certificate Enchante 2 30-06-25.pdf | 14 Aug 2025 |
| Withdrawal Update Form 1File: Architech Certificate Enchante 2 30-06-25.pdf | 14 Aug 2025 |
| Withdrawal Update Form 2File: Architech Certificate Enchante 2 30-06-25.pdf | 14 Aug 2025 |
| Withdrawal Update Form 2File: Engineer certiifcate Enchante 2 30-06-25.pdf | 14 Aug 2025 |
| Withdrawal Update Form 3File: VJIDPL YASHWIN ENCHANTE PH 2.pdf | 14 Aug 2025 |
| Withdrawal Update Form 3File: VJIDPL YASHWIN ENCHANTE PH 2.pdf | 14 Aug 2025 |
| Layout approvalFile: 1321 Wagholi_Sanctioned layout statement for RERA submission-2.pdf | 7 Aug 2025 |
| Building plan approvalFile: 29- Building J1-J2.pdf | 7 Aug 2025 |
| Building plan approvalFile: 30- Building J1-J2.pdf | 7 Aug 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations, which the RERA portal never shows together
- All 204 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Yashwin Enchante Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wagholi14,000+ in Pune
Kohinoor Kaleido-Phase-II
Intofinity Promoters Private Limited
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Vilas Javdekar Infinitee Developers Pvt. Ltd.
Vilas Javdekar Infinitee Developers Pvt. Ltd. has 12 registrations on MahaRERA, including YashONE Infinitee - Phase I and YashONE Infinitee - Phase II. Its filings disclose 11 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Yashwin Enchante Phase 2 is delayed beyond 30 Apr 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Yashwin Enchante Phase 2?
The registered promoter entity is Vilas Javdekar Infinitee Developers Pvt. Ltd., a company as per the filing. Its CIN U70109PN2020PTC195347 and GSTIN 27AAHCV6956A1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Yashwin Enchante Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Yashwin Enchante Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Yashwin Enchante Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Yashwin Enchante Phase 2?
The professionals named in the filing: Architect: Deepali Patidar; Architect: Voussoirs; Engineer: Sagar Kale; Chartered Accountant: Sunil Nimbalkar; Chartered Accountant: Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Yashwin Enchante Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback