Registered No litigation declared Others project

NEW FRIENDS

By MAJESTIQUE DUROPOLIS PRIVATE LIMITED

RG-MH-84119 · RERA P52100055935 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 80%
594 of 773Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 189 documents Report an error

NEW FRIENDS is a Others project by MAJESTIQUE DUROPOLIS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100055935 on 29 Apr 2024. Possession is promised by 31 Dec 2029. 179 of the 773 units on this registration are recorded sold or booked, and 0 of 77 construction stages are filed complete.

At a glance

Project

  • NameNEW FRIENDS
  • TypeOthers
  • Location
    • PAUD ROAD
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055935
  • ReraGenie IDRG-MH-84119

Builder

  • NameMAJESTIQUE DUROPOLIS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309PN2021PTC204441
  • GSTIN27AAOCM9803C1ZB
  • DirectorRAHUL GIRDHARGOPAL MUNDRA

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings7 building records
  • Documents filed189 files

Current status

23%179 of 773 units booked

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL WINGNA9407272
TOWER 6NA11803636
TOWER T1NA322712229151
TOWER T2NA32279820118
TOWER T3NA32279825123
TOWER T4NA32279825123
TOWER T5NA322712228150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 80%.

COMMERCIAL WING5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER T17%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER T27%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER T37%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER T47%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER T57%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed265

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots265
Closed/Covered265
BuildingClosed/CoveredTotal
COMMERCIAL WING4343
TOWER 61616
TOWER T11717
TOWER T22929
TOWER T35656
TOWER T44545
TOWER T55959

Land and ownership26

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,111 sq m
Land owned byThe promoter, with other names on the file
Named landowners26
LandownerVillageDistrict
New Freinds Cooperative Housing Society LtdKothrudPune
New Friends Cooperative Housing Society LtdKothrudPune
New Friends Cooperative Housing Society Ltd.1KothrudPune
New Friends Cooperative Housing Society Ltd.2KothrudPune
New Friends Cooperative Housing Society Ltd 3KothrudPune
New Friends Cooperative Housing Society Ltd.4KothrudPune
New Friends Cooperative Housing Society Ltd.5KothrudPune
New Friends Cooperative Housing Society Ltd.6KothrudPune
New Friends Cooperative Housing Society Ltd.7KothrudPune
New Friends Cooperative Housing Society Ltd.8KothrudPune
New Friends Cooperative Housing Society Ltd.9KothrudPune
New Friends Cooperative Housing Society Ltd.10KothrudPune
New Friends Cooperative Housing Society Ltd.11KothrudPune
New Friends Cooperative Housing Society Ltd.12KothrudPune
New Friends Cooperative Housing Society Ltd.13KothrudPune
New Friends Cooperative Housing Society Ltd.14KothrudPune
New Friends Cooperative Housing Society Ltd.15KothrudPune
New Friends Cooperative Housing Society Ltd.16KothrudPune
New Friends Cooperative Housing Society Ltd.17KothrudPune
New Friends Cooperative Housing Society Ltd.18KothrudPune
New Friends Cooperative Housing Society Ltd.19KothrudPune
New Friends Cooperative Housing Society Ltd.20KothrudPune
New Friends Cooperative Housing Society Ltd.21KothrudPune
New Friends Cooperative Housing Society Ltd.22KothrudPune
New Friends Cooperative Housing Society Ltd.23KothrudPune
New Friends Cooperative Housing Society Ltd.24KothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation Pune
Permissible FSI96500.0
Proposed, not sanctioned79,116 sq m
Buildings approved8
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 3,4,6,9,10 Business Court, Opp Brand Factory, Mukund Nagar 411037

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AERAM
Chartered AccountantVinod Kumar Jindal
PartnerRole in project
MAJESTIQUE DUROPOLIS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed189

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 189 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: ARCHITECT CERTIFICATE.pdf5 May 2026
Form 2File: 31032026 EC.pdf5 May 2026
Form 3File: Form 3 NFS Q4_compressed.pdf5 May 2026
Disclosure of Sold and Booked InventoryFile: NFS - sold unsold March 2026_compressed.pdf5 May 2026
Form 1File: Form 1 Architect Certificate.pdf2 Mar 2026
Form 2File: Form 2 EC.pdf2 Mar 2026
Form 3File: Form 3 NFS Q3_compressed.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold NFS Q3 25.pdf2 Mar 2026
Form 5 (FY 2024-2025)File: NFS FORM 5 .pdf10 Dec 2025
Form 1File: Form 1.pdf30 Oct 2025
Form 2File: From - 2.pdf30 Oct 2025
Form 3File: Form 3 NFS Q2_compressed.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: NFS - 30-09-25_compressed.pdf30 Oct 2025
Form 1File: Form 1.pdf22 Aug 2025
Form 2File: Form 2.pdf22 Aug 2025
Form 3File: Form 3 NFS_compressed.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold NFS_compressed.pdf22 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Friends FORM 3 _compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032025 EC.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: NFS - MAR 25_compressed_compressed3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032025 EC.pdf14 Apr 2025
Building plan approvalFile: PLAN-01-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-02-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-03-03_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-03-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-04-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-05-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-06-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN 07-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-08-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-09-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-10-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-11-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-12-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-13-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-14-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-15-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-16-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-17-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-18-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-19-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-20-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-21-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-22-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-24-24_Compressed.pdf4 Apr 2025
Building plan approvalFile: PLAN-23-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-01-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-23-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-24-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-22-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-21-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-20-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-19-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-18-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-17-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-16-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-15-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-14-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-13-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-12-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-11-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-10-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-09-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-08-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN 07-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-06-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-05-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-04-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-03-24_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-03-03_Compressed.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN-02-24_Compressed.pdf4 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC-3991-24 DT 13-03-2025_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 ARCH CERTIFICATE.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 .pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31122024 ENGINEERING CERTIFICATE.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Nfs -June 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: nfs sept 24.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: NFS DEC-24_compressed.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 _compressed.pdf31 Jan 2025

How this compares with Pune

23%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW FRIENDS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmNEW FRIENDSCompleted 99Lapsed / revoked 49Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: MAJESTIQUE DUROPOLIS PRIVATE LIMITED

MAJESTIQUE DUROPOLIS PRIVATE LIMITED has 1 registration on MahaRERA, including NEW FRIENDS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NEW FRIENDS is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW FRIENDS?

The registered promoter entity is MAJESTIQUE DUROPOLIS PRIVATE LIMITED, a company as per the filing. Its CIN U45309PN2021PTC204441 and GSTIN 27AAOCM9803C1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW FRIENDS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW FRIENDS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW FRIENDS?

The professionals named in the filing: Architect: JAY AERAM; Chartered Accountant: Vinod Kumar Jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW FRIENDS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW FRIENDS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW FRIENDS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.