Home / Browse projects / Pune, Maharashtra / VTP BELLISSIMO PHASE 1

Registered No litigation declared Others project

VTP BELLISSIMO PHASE 1

By MAGNITE DEVELOPERS PRIVATE LIMITED

RG-MH-27600 · RERA P52100033888 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 9 months
  • 1 extension taken
  • Rs 800.00 crore secured on the land, in favour of CREDIT OPPORTUNITIES III PTE LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 9 months from the original
39 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 87%
55 of 1,246Units unsoldnot recorded sold or booked
17Complaints at MahaRERAon this registration
Jump to the 189 documents Report an error

VTP BELLISSIMO PHASE 1 is a Others project by MAGNITE DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100033888 on 14 Mar 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 1,191 of the 1,246 units on this registration are recorded sold or booked, and 39 of 77 construction stages are filed complete. 17 complaints are on record with the regulator.

At a glance

Project

  • NameVTP BELLISSIMO PHASE 1
  • TypeOthers
  • Location
    • HINJEWADI MANN ROAD
    • HINJEWADI
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100033888
  • ReraGenie IDRG-MH-27600

Builder

  • NameMAGNITE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309PN2022PTC207434
  • DirectorsBHUSHAN VILAS PALRESHA, NILESH VILAS PALRESHA
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022First promiseMar 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2026)
  • Buildings7 building records
  • Documents filed189 files

Current status

96%1191 of 1,246 units booked
77.5%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA31292050205
TOWER 2NA31292400240
TOWER 3NA34262080208
TOWER 4NA34261560156
TOWER 5NA34261564160
TOWER 6NA342610413117
TOWER 7NA34261564160

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 87%.

TOWER 172%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises57%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.49%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.29%
TOWER 271%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises58%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.29%
TOWER 376%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises79%
Sanitary Fittings within the flats / premises59%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.21%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.22%
TOWER 462%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises53%
Sanitary Fittings within the flats / premises32%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 565%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises59%
Sanitary Fittings within the flats / premises27%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 670%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises24%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%
TOWER 770%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises64%
Sanitary Fittings within the flats / premises23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.29%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsYes10%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes35%

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered7
Open Space70
BuildingClosed/CoveredOpen SpaceTotal
TOWER 111011
TOWER 211011
TOWER 311011
TOWER 411011
TOWER 511011
TOWER 611011
TOWER 711011

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,464 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCREDIT OPPORTUNITIES III PTE LIMITED
Secured amountRs 800.00 crore
CERSAI search filedYes
Declared on12 Oct 2025
LandownerVillageDistrict
ASHDAN TOWNSHIP VENTURES PRIVATE LIMITEDBanerPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune PMRDA
Permissible FSI109738.85
Proposed, not sanctioned97,739 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANORI BRANCH
Estimated costRs 457.91 cr
Cost incurredRs 355.12 cr
Work done77.55%
BuildingWingEstimatedIncurred
TOWER 3NARs 76.31 crRs 73.30 cr
TOWER 4NARs 68.90 crRs 59.08 cr
TOWER 2NARs 66.10 crRs 56.20 cr
TOWER 6NARs 64.79 crRs 41.27 cr
TOWER 5NARs 63.36 crRs 43.00 cr
TOWER 7NARs 62.81 crRs 40.20 cr
TOWER 1NARs 46.49 crRs 42.07 cr
-NARs 9.16 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK ARC
ArchitectANA CONSORTIUM PVT LTD
ArchitectANA CONSIRTIUM PVT LTD
ArchitectVK:a
EngineerSTRUDCOM CONSULTANTS PVT LTD
EngineerSIDDIQUE MODAK
Chartered AccountantSAC AND CO LLP
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
MAGNITE DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018188Mar 2026 → Dec 2026

Reason as filed by the promoterWhile applying for project registration, project validity date was wrongly written as 30.03.2026 instead of 31.12.2026. We are applying for an extension to rectify this error and ensure the accurate representation of the project validity period. In view of above, we humbly request you to grant us extension till 31.12.2026.

Litigation declared2

CaseCourtStatus
446/2020Commercial Court PuneDisposed as withdrawn
25/2022Commercial Court PuneDisposed as withdrawn

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC005000000259266Sandeep Dadasaheb YADAVJitendra wani (A52100028983)09/08/2023
CC005000000340893Sandeep Dadasaheb YADAVMagnite Developers Private Limited05/05/2024
CC005000000310468MAGNITE DEVELOPERS PRIVATE LIMITEDSALIM ILIYAS ANSARI24/02/2024
CC005000000310469MAGNITE DEVELOPERS PRIVATE LIMITEDPARVEZ JAHANGIR KHAN24/02/2024
CC005000000340666MAGNITE DEVELOPERS PRIVATE LIMITEDSNEHAL MUKUND THAKAR27/03/2024
CC005000000340667MAGNITE DEVELOPERS PRIVATE LIMITEDSAVITA RANBA SONAWANE27/03/2024
CC12600485Bhushankumar Navanath PawarMAGNITE DEVELOPERS PRIVATE LIMITED27/01/2026
CC12600486Bhushankumar Navanath PawarMAGNITE DEVELOPERS PRIVATE LIMITED27/01/2026
CC12600709MAGNITE DEVELOPERS PRIVATE LIMITEDParvez Jahagir Khan07/02/2026
CC12600710MAGNITE DEVELOPERS PRIVATE LIMITEDSALIM ILIYAS ANSARI07/02/2026
CC12600711MAGNITE DEVELOPERS PRIVATE LIMITEDSAVITA RANBA SONAWANE07/02/2026
CC12600712MAGNITE DEVELOPERS PRIVATE LIMITEDSNEHAL MUKUND THAKAR07/02/2026
CC12603999Mitul Nitin ShahMAGNITE DEVELOPERS PRIVATE LIMITED27/06/2026
CC12604054Ravindra Hindurao JagadaleMAGNITE DEVELOPERS PRIVATE LIMITED29/06/2026
CC12604681Akshay Vijay ChavanMAGNITE DEVELOPERS PRIVATE LIMITED26/07/2026
CC12605238Sachin Vishnu PatilMAGNITE DEVELOPERS PRIVATE LIMITED17/08/2026
CC12605524Akshay Vishwanath PatilMAGNITE DEVELOPERS PRIVATE LIMITED27/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed189

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 189 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf8 Jul 2026
Withdrawal Update Form 1File: form-1 bellissimo phase 1.pdf8 Jul 2026
Withdrawal Update Form 2File: BELLISSIMO PHASE 1 -FORM 2.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2- bellissimo Phase-1.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 VTP Bellissimo Ph 1 june26 compressed.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 VTP Bellissimo Ph 1 june26 compressed.pdf8 Jul 2026
Form 2A (FY 2025-2026)File: Bellissimo Phase 1 Form 2A.pdf18 Jun 2026
Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf15 Apr 2026
Withdrawal Update Form 2File: BELLISSIMO PHASE 1 -FORM 2.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 1.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2 BELLISSIMO PHASE 1.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3 Bellissimo ph 1.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM 1 BELLISSIMO PHASE 1.pdf18 Oct 2025
Withdrawal Update Form 1File: FORM 1 BELLISSIMO PHASE 1.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2 VTP BELLISSIMO PHASE 1 30062024.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2 VTP BELLISSIMO PHASE 1 30062024.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 2_11zon.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 2_11zon.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: FORM-5 BELLISSIMO PHASE 1.pdf11 Sep 2025
Other - TechnicalFile: FORM 2A BELLISSIMO PHASE 1.pdf30 Jun 2025
Form 1File: FORM 1 BELLISSIMO PHASE 1 31032025.pdf22 May 2025
Form 2File: Form 2 Bellissimo Phasae 1.pdf22 May 2025
Form 3File: Form 3 VTP Bellissimo Ph 1 31032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: BELLISSIMO PH 1 31032025.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 31122024.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Bellissimo Ph 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bellissimo Phase 1.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31032025.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: BELLISSIMO PH 1 31032025.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf7 Oct 2024
Layout approvalFile: VTP BELLISSIMO PHASE 1_Layout_181022_compressed.pdf9 Aug 2024
Building plan approvalFile: 4_51_T1 to T9_first floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 6_51_T1_1 to 29_compressed.pdf9 Aug 2024
Building plan approvalFile: 8_51_T2_stilt_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 9_51_T2_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 10_51_T2_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 14_51_T3_1st_compressed.pdf9 Aug 2024
Building plan approvalFile: 15_51_T3_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 19_51_T4_first_compressed.pdf9 Aug 2024
Building plan approvalFile: 20_51_T4_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 21_51_T4_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 24_51_T5_shop_compressed.pdf9 Aug 2024
Building plan approvalFile: 25_51_T5_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 5_51_T1_stilt_floor_plan_compressed.pdf9 Aug 2024
Building plan approvalFile: 26_51_T5_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 27_51_T5_floor_compressed.pdf9 Aug 2024
Building plan approvalFile: 30_51_T6_shop_compressed.pdf9 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
No experienceHinjewadiCompletedDec 2022Dec 2022

How this compares with Pune

96%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP BELLISSIMO PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJEWADI13,700+ in Pune

Builder: MAGNITE DEVELOPERS PRIVATE LIMITED

MAGNITE DEVELOPERS PRIVATE LIMITED has 3 registrations on MahaRERA, including VTP BELLISSIMO PHASE 1 and VTP BELLISSIMO PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP BELLISSIMO PHASE 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP BELLISSIMO PHASE 1?

The registered promoter entity is MAGNITE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45309PN2022PTC207434 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP BELLISSIMO PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP BELLISSIMO PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP BELLISSIMO PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP BELLISSIMO PHASE 1?

The professionals named in the filing: Architect: VK ARC; Architect: ANA CONSORTIUM PVT LTD; Architect: ANA CONSIRTIUM PVT LTD; Architect: VK:a; Engineer: STRUDCOM CONSULTANTS PVT LTD; Engineer: SIDDIQUE MODAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP BELLISSIMO PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP BELLISSIMO PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP BELLISSIMO PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.