Home / Browse projects / Pune, Maharashtra / VTP BELLISSIMO PHASE 1
VTP BELLISSIMO PHASE 1
By MAGNITE DEVELOPERS PRIVATE LIMITED
RG-MH-27600 · RERA P52100033888 · Last updated on MahaRERA portal: 8 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 17 complaints at MahaRERA
- Completion date moved by 9 months
- 1 extension taken
- Rs 800.00 crore secured on the land, in favour of CREDIT OPPORTUNITIES III PTE LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP BELLISSIMO PHASE 1 is a Others project by MAGNITE DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100033888 on 14 Mar 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 1,191 of the 1,246 units on this registration are recorded sold or booked, and 39 of 77 construction stages are filed complete. 17 complaints are on record with the regulator.
At a glance
Project
- NameVTP BELLISSIMO PHASE 1
- TypeOthers
- Location
- HINJEWADI MANN ROAD
- HINJEWADI
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- RERA no.P52100033888
- ReraGenie IDRG-MH-27600
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Mar 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2026)
- Buildings7 building records
- Documents filed189 files
Current status
Figures as on 8 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 1 | NA | 31 | 29 | 205 | 0 | 205 |
| TOWER 2 | NA | 31 | 29 | 240 | 0 | 240 |
| TOWER 3 | NA | 34 | 26 | 208 | 0 | 208 |
| TOWER 4 | NA | 34 | 26 | 156 | 0 | 156 |
| TOWER 5 | NA | 34 | 26 | 156 | 4 | 160 |
| TOWER 6 | NA | 34 | 26 | 104 | 13 | 117 |
| TOWER 7 | NA | 34 | 26 | 156 | 4 | 160 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
39 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 87%.
TOWER 172%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 57% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 49% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 29% |
TOWER 271%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 58% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 46% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 29% |
TOWER 376%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 79% |
| Sanitary Fittings within the flats / premises | 59% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 52% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 21% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 22% |
TOWER 462%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 53% |
| Sanitary Fittings within the flats / premises | 32% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 6% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 565%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 59% |
| Sanitary Fittings within the flats / premises | 27% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 6% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 670%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 63% |
| Sanitary Fittings within the flats / premises | 24% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 39% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 14% |
TOWER 770%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 64% |
| Sanitary Fittings within the flats / premises | 23% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 39% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 29% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 14% |
Progress on shared amenities15
As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 45% |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 10% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 35% |
Parking filed77
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| TOWER 1 | 1 | 10 | 11 |
| TOWER 2 | 1 | 10 | 11 |
| TOWER 3 | 1 | 10 | 11 |
| TOWER 4 | 1 | 10 | 11 |
| TOWER 5 | 1 | 10 | 11 |
| TOWER 6 | 1 | 10 | 11 |
| TOWER 7 | 1 | 10 | 11 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| ASHDAN TOWNSHIP VENTURES PRIVATE LIMITED | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER 3 | NA | Rs 76.31 cr | Rs 73.30 cr |
| TOWER 4 | NA | Rs 68.90 cr | Rs 59.08 cr |
| TOWER 2 | NA | Rs 66.10 cr | Rs 56.20 cr |
| TOWER 6 | NA | Rs 64.79 cr | Rs 41.27 cr |
| TOWER 5 | NA | Rs 63.36 cr | Rs 43.00 cr |
| TOWER 7 | NA | Rs 62.81 cr | Rs 40.20 cr |
| TOWER 1 | NA | Rs 46.49 cr | Rs 42.07 cr |
| - | NA | Rs 9.16 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK ARC |
| Architect | ANA CONSORTIUM PVT LTD |
| Architect | ANA CONSIRTIUM PVT LTD |
| Architect | VK:a |
| Engineer | STRUDCOM CONSULTANTS PVT LTD |
| Engineer | SIDDIQUE MODAK |
| Chartered Accountant | SAC AND CO LLP |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Partner | Role in project |
|---|---|
| MAGNITE DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWhile applying for project registration, project validity date was wrongly written as 30.03.2026 instead of 31.12.2026. We are applying for an extension to rectify this error and ensure the accurate representation of the project validity period. In view of above, we humbly request you to grant us extension till 31.12.2026.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 446/2020 | Commercial Court Pune | Disposed as withdrawn |
| 25/2022 | Commercial Court Pune | Disposed as withdrawn |
Complaints filed with MahaRERA17
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000259266 | Sandeep Dadasaheb YADAV | Jitendra wani (A52100028983) | 09/08/2023 |
| CC005000000340893 | Sandeep Dadasaheb YADAV | Magnite Developers Private Limited | 05/05/2024 |
| CC005000000310468 | MAGNITE DEVELOPERS PRIVATE LIMITED | SALIM ILIYAS ANSARI | 24/02/2024 |
| CC005000000310469 | MAGNITE DEVELOPERS PRIVATE LIMITED | PARVEZ JAHANGIR KHAN | 24/02/2024 |
| CC005000000340666 | MAGNITE DEVELOPERS PRIVATE LIMITED | SNEHAL MUKUND THAKAR | 27/03/2024 |
| CC005000000340667 | MAGNITE DEVELOPERS PRIVATE LIMITED | SAVITA RANBA SONAWANE | 27/03/2024 |
| CC12600485 | Bhushankumar Navanath Pawar | MAGNITE DEVELOPERS PRIVATE LIMITED | 27/01/2026 |
| CC12600486 | Bhushankumar Navanath Pawar | MAGNITE DEVELOPERS PRIVATE LIMITED | 27/01/2026 |
| CC12600709 | MAGNITE DEVELOPERS PRIVATE LIMITED | Parvez Jahagir Khan | 07/02/2026 |
| CC12600710 | MAGNITE DEVELOPERS PRIVATE LIMITED | SALIM ILIYAS ANSARI | 07/02/2026 |
| CC12600711 | MAGNITE DEVELOPERS PRIVATE LIMITED | SAVITA RANBA SONAWANE | 07/02/2026 |
| CC12600712 | MAGNITE DEVELOPERS PRIVATE LIMITED | SNEHAL MUKUND THAKAR | 07/02/2026 |
| CC12603999 | Mitul Nitin Shah | MAGNITE DEVELOPERS PRIVATE LIMITED | 27/06/2026 |
| CC12604054 | Ravindra Hindurao Jagadale | MAGNITE DEVELOPERS PRIVATE LIMITED | 29/06/2026 |
| CC12604681 | Akshay Vijay Chavan | MAGNITE DEVELOPERS PRIVATE LIMITED | 26/07/2026 |
| CC12605238 | Sachin Vishnu Patil | MAGNITE DEVELOPERS PRIVATE LIMITED | 17/08/2026 |
| CC12605524 | Akshay Vishwanath Patil | MAGNITE DEVELOPERS PRIVATE LIMITED | 27/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed189
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 189 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf | 8 Jul 2026 |
| Withdrawal Update Form 1File: form-1 bellissimo phase 1.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: BELLISSIMO PHASE 1 -FORM 2.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: Form 2- bellissimo Phase-1.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 VTP Bellissimo Ph 1 june26 compressed.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 VTP Bellissimo Ph 1 june26 compressed.pdf | 8 Jul 2026 |
| Form 2A (FY 2025-2026)File: Bellissimo Phase 1 Form 2A.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: BELLISSIMO PHASE 1 -FORM 2.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 1.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 BELLISSIMO PHASE 1.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 BELLISSIMO PHASE 1.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Bellissimo ph 1.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 BELLISSIMO PHASE 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 BELLISSIMO PHASE 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 VTP BELLISSIMO PHASE 1 30062024.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 VTP BELLISSIMO PHASE 1 30062024.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 2_11zon.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 BELLISSIMO PHASE 2_11zon.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM-5 BELLISSIMO PHASE 1.pdf | 11 Sep 2025 |
| Other - TechnicalFile: FORM 2A BELLISSIMO PHASE 1.pdf | 30 Jun 2025 |
| Form 1File: FORM 1 BELLISSIMO PHASE 1 31032025.pdf | 22 May 2025 |
| Form 2File: Form 2 Bellissimo Phasae 1.pdf | 22 May 2025 |
| Form 3File: Form 3 VTP Bellissimo Ph 1 31032025.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: BELLISSIMO PH 1 31032025.pdf | 22 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 31122024.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Bellissimo Ph 1.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bellissimo Phase 1.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31032025.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PH 1 31032025.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 31122024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PHASE 1 31122024.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PHASE 1 31122024.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BELLISSIMO PHASE 1 30092024.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf | 7 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf | 7 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISSIMO PHASE 1 07102023.pdf | 7 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30062024.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bellissimo Phase 1.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELLISIMO PHASE 1 30092024.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELLISSIMO PH 1 30092024.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BELLISSIMO PH1 30092024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 VTP BELLISSIMO PHASE 1 31-03-2024_compressed.pdf | 7 Oct 2024 |
| Layout approvalFile: VTP BELLISSIMO PHASE 1_Layout_181022_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 4_51_T1 to T9_first floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 6_51_T1_1 to 29_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 8_51_T2_stilt_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 9_51_T2_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 10_51_T2_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 14_51_T3_1st_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 15_51_T3_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 19_51_T4_first_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 20_51_T4_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 21_51_T4_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 24_51_T5_shop_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 25_51_T5_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 5_51_T1_stilt_floor_plan_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 26_51_T5_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 27_51_T5_floor_compressed.pdf | 9 Aug 2024 |
| Building plan approvalFile: 30_51_T6_shop_compressed.pdf | 9 Aug 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| No experience | Hinjewadi | Completed | Dec 2022 | Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 189 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VTP BELLISSIMO PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HINJEWADI13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Kohinoor Central Park - Phase 1
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: MAGNITE DEVELOPERS PRIVATE LIMITED
MAGNITE DEVELOPERS PRIVATE LIMITED has 3 registrations on MahaRERA, including VTP BELLISSIMO PHASE 1 and VTP BELLISSIMO PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VTP BELLISSIMO PHASE 1 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP BELLISSIMO PHASE 1?
The registered promoter entity is MAGNITE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45309PN2022PTC207434 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP BELLISSIMO PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP BELLISSIMO PHASE 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP BELLISSIMO PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP BELLISSIMO PHASE 1?
The professionals named in the filing: Architect: VK ARC; Architect: ANA CONSORTIUM PVT LTD; Architect: ANA CONSIRTIUM PVT LTD; Architect: VK:a; Engineer: STRUDCOM CONSULTANTS PVT LTD; Engineer: SIDDIQUE MODAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP BELLISSIMO PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback