Home / Browse projects / Pune, Maharashtra / Falcon Towers at Riverview City

Completed No litigation declared Residential / Group Housing project

Falcon Towers at Riverview City

By Riverview City Constructions Ltd

RG-MH-22725 · RERA P52100032051 · Last updated on MahaRERA portal: 7 Oct 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
63 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 85%
21 of 1,169Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Falcon Towers at Riverview City is a Residential / Group Housing project by Riverview City Constructions Ltd in Pune, Maharashtra, registered with MahaRERA as P52100032051 on 3 Dec 2021. The registration is recorded completed; possession was promised by 2 Jun 2025. The completion date has moved by 2 months from the original filing. 1,148 of the 1,169 units on this registration are recorded sold or booked, and 63 of 77 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameFalcon Towers at Riverview City
  • TypeResidential / Group Housing
  • Location
    • Riverview City
    • Kadamwakwasti
    • Kadamwak Wasti
    • Haveli
    • Pune
    • 412201
  • Pincode412201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032051
  • ReraGenie IDRG-MH-22725

Builder

  • NameRiverview City Constructions Ltd
  • Entity typeCompany
  • CINU45202PN2007PLC129440
  • GSTIN27AADCR5766N1ZO
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsUmesh Dattatray Magar, Satish Dattatray Magar
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2021First promiseApr 2025Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Dec 2021
  • Promised completion2 Jun 2025
  • Revised completionRevised to 2 Jun 2025 (originally 30 Apr 2025)
  • Buildings7 building records
  • Documents filed109 files

Current status

98%1148 of 1,169 units booked

Figures as on 7 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA25211670167
ANA25211670167
GNA25211670167
BNA25211670167
CNA25211670167
ENA25211670167
FNA25211670167

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 7 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

63 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 85%.

D97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
A96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
G96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
B97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
C97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
E97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
F97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities26

As on 7 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes65%
Open ParkingYes100%
Children Play AreaYes0%
EV Charge ZoneYes0%
Open Air GymYes0%
Skating TrackYes0%
Town Level Efficient Waste Management SystemYes0%
Town Level 24 x 7 Centralized Security SystemYes0%
Town Level well landscaped Parks and GardensYes0%
Town Level Water Treatment SystemYes0%
Town Level Playgrounds with Sports FacilitiesYes0%
Town Level Fire Brigade StationYes0%
Town Level Electric SubstationYes0%

Parking filed1530

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,530
Closed/Covered1,530
BuildingClosed/CoveredTotal
D171171
A338338
G337337
B170170
C171171
E171171
F172172

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area45,520 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority Pune
Permissible FSI114634.59
Proposed, not sanctioned114,635 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Solapur Bazar Road Off East Street Poolgate Pune 411001

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantSDB & Company
PartnerRole in project
Riverview City Constructions Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11062501547Apr 2025 → Jun 2025

Reason as filed by the promoterThe Completion Date as per MahaRERA Registration Certificate was 30.04.2025. Accordingly, the Appendix H Form for Completion certificate was submitted to the Hon. Chief Executive Officer on 24 March 2025. The Consent to Operate was required. The Consent Appraisal Committee Meeting was held on 20 May 2025, and the Consent to Operate No. Infrastructure/RED/L.S.I Format1.0/CAC-CELL/UAN No.0000242966/CO/2505004288 dated 30 May 2025 was received. Immediately thereafter the Completion Certificate No. BHA/Mau. Kadamwakwasti/G. No. 1137 Part and other Sector RVR-3/Pra.Kra.802/20-21/1759 dated 2 June 2

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12501638Sunil KokaneRiverview City Constructions Ltd21/05/2025
CC12501786Himanshu AhujaRiverview City Constructions Ltd30/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5.pdf7 Oct 2025
Form 1File: Form 1- March 2025.pdf21 Jul 2025
Form 2File: Form 2 - March 2025.pdf21 Jul 2025
Form 3File: Form 3 - March 2025.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf21 Jul 2025
Occupational CertificateFile: Occupancy Certificate.pdf4 Jul 2025
Other - TechnicalFile: Application - RVR-3 -OCC.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - March 2025.pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024-2025.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- March 2025.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan 2025.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Dec 2024.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Oct 2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - Sep 2024.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Sep 2024.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Jun 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jun 2024.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - March 2024.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM - 5.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - March 2024.pdf9 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - September.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2023.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2023.pdf15 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society - Name approval.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - September.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf18 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - June 2023.pdf31 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June.pdf29 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2023.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory- December 2022.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked inventory - March 2023.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 February 2023.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 March 2023.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 April.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2A.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 January 2023.pdf1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 January 2023.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 January 2023.pdf1 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - December 2022.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - September 2022.pdf8 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-booked Inventory - June 2022.pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Booked Inventory.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2022.pdf26 Mar 2022
Proforma of Allotment letterFile: RERA Agreement - Final.pdf26 Feb 2022
Proforma of Allotment letterFile: RERA Agreement - Final.pdf16 Feb 2022
Proforma of Allotment letterFile: Articles of Agreement.pdf3 Feb 2022
CERSAI detailsFile: CERSAI Certificate.pdf26 Nov 2021
OtherFile: Letter for non-requirement of Landowner Promoter details.pdf25 Nov 2021
Declaration about Commencement CertificateFile: Declaration - Format D.pdf18 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2021
Layout approvalFile: 1-1-rvr-3_ compressed-converted-1.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-2.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-3.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-4.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-5.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-6.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-7.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-8.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-9.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-10.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-11.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-12.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_compressed-converted-13.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-14.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-15.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_compressed-converted-16.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-17.pdf17 Nov 2021
Building plan approvalFile: 1-1-rvr-3_ compressed-converted-18.pdf17 Nov 2021
PAN CardFile: RCCL PAN.pdf17 Nov 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Hornbill Heights at Riverview CityP52100053795Kadamwakwasti, Pune-Nov 2023OngoingDec 2027Not due yet
Skylark Apartments RVR 7A at Riverview CityP52100047628Kadamwakwasti, Pune664Nov 2022CompletedMar 2026Mar 2026

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 2 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Falcon Towers at Riverview City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kadamwakwasti13,700+ in Pune

Builder: Riverview City Constructions Ltd

Riverview City Constructions Ltd has 4 registrations on MahaRERA, including Falcon Towers at Riverview City and Skylark Apartments RVR 7A at Riverview City. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Falcon Towers at Riverview City is delayed beyond 2 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Falcon Towers at Riverview City?

The registered promoter entity is Riverview City Constructions Ltd, a company as per the filing. Its CIN U45202PN2007PLC129440 and GSTIN 27AADCR5766N1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Falcon Towers at Riverview City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Falcon Towers at Riverview City?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Falcon Towers at Riverview City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Falcon Towers at Riverview City?

The professionals named in the filing: Chartered Accountant: SDB & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Falcon Towers at Riverview City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Falcon Towers at Riverview City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Falcon Towers at Riverview City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.