Flamingo Park
By Riverview City Constructions Ltd
RG-MH-58848 · RERA PR1260002600177 · Last updated on MahaRERA portal: 27 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Allotment letter deviates from the model form
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- All 2 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Flamingo Park is a Residential / Group Housing project by Riverview City Constructions Ltd in Pune, Maharashtra, registered with MahaRERA as PR1260002600177 on 18 Apr 2026. Possession is promised by 31 Jul 2030. 0 of the 1,242 units on this registration are recorded sold or booked, and 6 of 60 construction stages are filed complete.
At a glance
Project
- NameFlamingo Park
- TypeResidential / Group Housing
- Location
- Riverview City
- Kadamwak Wasti
- Haveli
- Pune
- 412201
- Pincode412201
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1260002600177
- ReraGenie IDRG-MH-58848
Builder
- NameRiverview City Constructions Ltd
- Entity typeCompany
- CINU45202PN2007PLC129440
- GSTIN27AADCR5766N1ZO
- DirectorsUmesh Dattatray Magar, Satish Dattatray Magar, Suresh Ganpat Kalbhor, Dnyaneshwar Kalbhor, Madhav Dattatraya Kalbhor, Subhash Narasing Kalbhor, Vinayak Tanaji Sorte, Chandrashekhar Sudhakar Hemgude
- Independent DirectorsDileep Nagesh Mane, Hanamant Kashinath Sale
- Other registrations3 more →
- Completed2 of 4
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Apr 2026
- Promised completion31 Jul 2030
- Revised completionNone
- Buildings6 building records
- Documents filed23 files
Current status
Figures as on 27 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 29 | 27 | 216 | 0 | 216 |
| B | NA | 29 | 27 | 162 | 0 | 162 |
| C | NA | 29 | 27 | 216 | 0 | 216 |
| D | NA | 29 | 27 | 216 | 0 | 216 |
| E | NA | 29 | 27 | 216 | 0 | 216 |
| F | NA | 29 | 27 | 216 | 0 | 216 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 60 construction stages are filed complete across 6 buildings. The stage furthest along is Plinth, at 60%.
A17%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
B18%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
C14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 20% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
D16%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 40% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
E16%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 35% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
F14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 20% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities16
As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 5% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 35% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
| Fitness Center | No | 0% |
Parking filed3794
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 856 | 23 | 879 |
| B | 644 | 24 | 668 |
| C | 856 | 25 | 881 |
| D | 432 | 22 | 454 |
| E | 432 | 24 | 456 |
| F | 432 | 24 | 456 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 201.56 cr | Rs 1.83 cr |
| A | NA | Rs 148.48 cr | Rs 2.65 cr |
| C | NA | Rs 148.48 cr | Rs 2.65 cr |
| D | NA | Rs 103.00 cr | Rs 1.84 cr |
| E | NA | Rs 103.00 cr | Rs 1.84 cr |
| F | NA | Rs 103.00 cr | Rs 1.84 cr |
| B | NA | Rs 94.25 cr | Rs 1.68 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Associated Space Designers |
| Engineer | Pratik Umesh Magar |
| Engineer | K Basavraj |
| Chartered Accountant | SDB & Company |
| Chartered Accountant | D R B S V & Associates |
| Partner | Role in project |
|---|---|
| Riverview City Constructions Ltd | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 221/2011/2011 | Shri. S. S. Kadam - 8th Joint C.J.S.D. AND ADDL C.J.M. PUNE | Ongoing |
| 751/1976 | 2nd Extra Joint Judge | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Mar 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2030
Documents filed23
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1- June 2026.pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 - June 2026.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 - June 2026.pdf | 27 Jun 2026 |
| Layout approvalFile: Sanction Plan - Layout.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-2 Building Sanction Plan - Stilt level.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-3 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-4 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-5 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-6 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-7 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-8 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-9 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-10 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-11 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-12 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-13 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-14 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-15 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-16 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-17 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-18 Building Sanction Plan.pdf | 31 Mar 2026 |
| Building plan approvalFile: 12-19 Building Sanction Plan.pdf | 31 Mar 2026 |
| Declaration and undertaking (Annexure A)File: Declaration-cum-Undertaking Annexure A.pdf | 31 Mar 2026 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Hornbill Heights at Riverview CityP52100053795 | Kadamwakwasti, Pune | - | Nov 2023 | Ongoing | Dec 2027 | Not due yet |
| Skylark Apartments RVR 7A at Riverview CityP52100047628 | Kadamwakwasti, Pune | 664 | Nov 2022 | Completed | Mar 2026 | Mar 2026 |
| Falcon Towers at Riverview CityP52100032051 | Kadamwakwasti, Pune | 1,169 | Dec 2021 | Certificate Signed | Jun 2025Registered original: Apr 2025 | Jun 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 23 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Flamingo Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kadamwak Wasti13,700+ in Pune
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
Falcon Towers at Riverview City
Riverview City Constructions Ltd
Skylark Apartments RVR 7A at Riverview City
Riverview City Constructions Ltd
LAXMI PARADISE
THE LAXMI EMPIRE
Jyoti Vihar
SHARDUL CONSTRUCTIONS
SKYLINE TOWERS-WING A
YUGANTH REALTY
Platinum Nirvana
PLATINUM DEVELOPERS
Builder: Riverview City Constructions Ltd
Riverview City Constructions Ltd has 4 registrations on MahaRERA, including Falcon Towers at Riverview City and Skylark Apartments RVR 7A at Riverview City. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Flamingo Park is delayed beyond 31 Jul 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Flamingo Park?
The registered promoter entity is Riverview City Constructions Ltd, a company as per the filing. Its CIN U45202PN2007PLC129440 and GSTIN 27AADCR5766N1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Flamingo Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Flamingo Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Flamingo Park?
The professionals named in the filing: Architect: Associated Space Designers; Engineer: Pratik Umesh Magar; Engineer: K Basavraj; Chartered Accountant: SDB & Company; Chartered Accountant: D R B S V & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Flamingo Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback