Home / Browse projects / Thane, Maharashtra / DOSTI PLANET NORTH - SECTOR 3

Registered No litigation declared Residential / Group Housing project

DOSTI PLANET NORTH - SECTOR 3

By CHALAMA INFRAPROPERTIES PRIVATE LIMITED

RG-MH-46064 · RERA P51700034985 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 150.00 crore secured on the land, in favour of Kotak Mahindra Investments Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 75%
759 of 1,345Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

DOSTI PLANET NORTH - SECTOR 3 is a Residential / Group Housing project by CHALAMA INFRAPROPERTIES PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700034985 on 28 Apr 2022. Possession is promised by 31 Dec 2028. 586 of the 1,345 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete.

At a glance

Project

  • NameDOSTI PLANET NORTH - SECTOR 3
  • TypeResidential / Group Housing
  • Location
    • OLD MUMBAI PUNE ROAD
    • NEAR SHILPHATA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700034985
  • ReraGenie IDRG-MH-46064

Builder

  • NameCHALAMA INFRAPROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDEEPAK KISHAN GORADIA, RAJESH PREMJI SHAH, RAJUL VRAJLAL VORA
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed89 files

Current status

44%586 of 1,345 units booked
36.3%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 2NA44344020402
TOWER 3NA44342290229
TOWER 1NA4403900390
TOWER 4NA4403240324

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 75%.

TOWER 268%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 368%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises51%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 427%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1492

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,492
Closed/Covered1,492
BuildingClosed/CoveredTotal
TOWER 2470470
TOWER 3228228
TOWER 1470470
TOWER 4324324

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area20,770 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Investments Ltd
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on1 Dec 2025
LandownerVillageDistrict
Nakhye's Everest Estate Private LimitedDOMBIVLIThane

Approvals and building plan

Sanctioning authorityTMC
Permissible FSI113471.87
Proposed, not sanctioned72,209 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT MUMBAI
Estimated costRs 477.58 cr
Cost incurredRs 173.15 cr
Work done36.26%
BuildingWingEstimatedIncurred
TOWER 2NARs 115.40 crRs 82.16 cr
TOWER 3NARs 115.40 crRs 82.16 cr
TOWER 1NARs 115.40 cr-
TOWER 4NARs 115.40 crRs 6.51 cr
-NARs 15.99 crRs 2.32 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY R VORA
ArchitectTEN FOLDS
EngineerVaibhav Raghunath Kalambate
EngineerSWAPNIL LONDHE
EngineerJW CONSULTANTS LLP
EngineerPARAS VISHWAKARMA
Chartered AccountantBAGADE & ASSOCIATES
Chartered AccountantMANISH BARDIA AND CO
PartnerRole in project
CHALAMA INFRAPROPERTIES PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
7949/2015HIGH COURTFOR HEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - DPN Sec 3.pdf22 Jun 2026
Withdrawal Update Form 1File: Chalama DPN Sec 3 Form 1 Mar26.pdf6 May 2026
Withdrawal Update Form 2File: Chalama DPN Sec 3 Form 2 Mar26.pdf6 May 2026
Withdrawal Update Form 3File: Chalama DPN Sec 3 Form 3 Mar26_compressed.pdf6 May 2026
Withdrawal Update Form 1File: Chalama DPN Sec 3 Form 1 Dec25.pdf29 Jan 2026
Withdrawal Update Form 2File: Chalama DPN Sec 3 Form 2 Dec25.pdf29 Jan 2026
Withdrawal Update Form 3File: Chalama DPN Sec 3 Form 3 Dec25compressed.pdf29 Jan 2026
Withdrawal Update Form 1File: Chalama DPN Sec 3 Form 1 Sept25.pdf25 Nov 2025
Withdrawal Update Form 2File: Chalama DPN Sec 3 Form 2 Sept25.pdf25 Nov 2025
Withdrawal Update Form 3File: Chalama DPN Sec 3 Form 3 Sept25_compressed.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: DPN Sector3.pdf12 Nov 2025
Form 1File: DPN Sector3 Arch certificate July2025.pdf25 Jul 2025
Form 2File: DPN Sector3 Engineer certificate July2025.pdf25 Jul 2025
Form 3File: DPN Sector3 CA certificate July2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: DPN Sector3 June2025_compressed (1).pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DPN Sector3 Achitect's certificate March2025.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DPN Sector3 CA certificate.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DPN SECTOR 3 Engg Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: DPN Sec 3 Tow 2 Tow 3.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DPN Sector3 Quality Certificate March2025.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DPN Sector3 Architect certificate.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DPN Sector3 CA certificate Dec2024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DPN Sector3 Engineer Certificate.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: DPN Sec 3 Tower 2 Amber Tower 3.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: DPN Sector3.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DPN Dosti Sector3 Form1 Sep24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DPN Dosti Sector3 Form3 Sep24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DPN Dosti Sector3 Form2 Sep24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DPN Sector-3.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 15-0 DPN Sector3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch DPN Sector3 June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg DPN Sector3 June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA DPN Sector3 June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Dosti planet north Sector3.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DPN Sector 3 Build 1 2 3 4.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DPN Sector 3.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Certificate Dosti planet north sector3.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DPN Sector 3.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Dosti Ambar ,Sapphire.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-Planet North sect-3 dec23.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DPN Sector 3.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Planet North Sector 3.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report Dosti Planet North sector3.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certiicate Dosti Planet North Sector 3.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Planet north 3 Eng Certi_compressed.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Planet north 3 CA Certi_compressed.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dosti Planet Notth Sector 3.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: Dosti Planet North Phase 3 Amber Sapphire.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A FORM 1 Dosti Planet North Sector 3.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: DPN Sec 3.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Dosti Planet North Sector 3.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti Planet North - Sector 3 - Sold-Unsold Data.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - Planet North Sector-3.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Planet North Sector 3.pdf11 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dosti Planet North Sector 3.pdf11 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Planet North Sector 3 Jan 2023.pdf10 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Planet North Sector 3 Jan 2023.pdf10 Feb 2023
Disclosure of sold/ booked inventoryFile: PN-Sec 3.pdf30 Jan 2023
Disclosure of sold/ booked inventoryFile: Dosti PN-Sec 3.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti PN-Sect 3.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Sector 3.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate-PN Sec 3.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate-PN Sec3.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate-PN-Sector 3.pdf19 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - DPN Sector 3.pdf11 Jul 2022
Details of encumbrancesFile: Index-II (2)_compressed.pdf17 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200235174610_For_Debtor_Based_Search_14_04_2022_11_37_30_547.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Engineer's Certificate.pdf13 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - CA Certificate.pdf13 Apr 2022
Proforma of Allotment letterFile: Rera agreement.pdf13 Apr 2022
Layout approvalFile: A.pdf12 Apr 2022
Layout approvalFile: B.pdf12 Apr 2022
Layout approvalFile: C.pdf12 Apr 2022
Layout approvalFile: D.pdf12 Apr 2022
Layout approvalFile: E.pdf12 Apr 2022
PAN CardFile: Chalama Infraproperties PAN Card.pdf12 Apr 2022
Copy of the legal title reportFile: Shil-Plot B-1 Title_compressed (1).pdf12 Apr 2022
Details of encumbrancesFile: Encumbrance Certificate - DPN - Sector 3.pdf12 Apr 2022
Copy of Layout Approval (in case of layout)File: A.pdf12 Apr 2022
Copy of Layout Approval (in case of layout)File: B.pdf12 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DOSTI PLANET NORTH - PHASE 1OLD MUMBAI PUNE ROAD NEAR SHILPHATA SHIL THANE1,179CompletedSep 2017Late, Dec 2017

How this compares with Thane

44%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOSTI PLANET NORTH - SECTOR 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHILPHATA7,600+ in Thane

2 kmDOSTI PLANET NORTH - SECCompleted 121Lapsed / revoked 58Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 297 registered projects within 2 km.

Builder: CHALAMA INFRAPROPERTIES PRIVATE LIMITED

CHALAMA INFRAPROPERTIES PRIVATE LIMITED has 5 registrations on MahaRERA, including DOSTI PLANET NORTH-PHASE 2- DOSTI JADE and DOSTI PLANET NORTH - PHASE 3 -DOSTI ONYX. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DOSTI PLANET NORTH - SECTOR 3 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI PLANET NORTH - SECTOR 3?

The registered promoter entity is CHALAMA INFRAPROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI PLANET NORTH - SECTOR 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DOSTI PLANET NORTH - SECTOR 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOSTI PLANET NORTH - SECTOR 3?

The professionals named in the filing: Architect: JAY R VORA; Architect: TEN FOLDS; Engineer: Vaibhav Raghunath Kalambate; Engineer: SWAPNIL LONDHE; Engineer: JW CONSULTANTS LLP; Engineer: PARAS VISHWAKARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOSTI PLANET NORTH - SECTOR 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI PLANET NORTH - SECTOR 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI PLANET NORTH - SECTOR 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.