Home / Browse projects / Thane, Maharashtra / DOSTI GREATER THANE - PHASE 1

Registration lapsed No litigation declared Others project

DOSTI GREATER THANE - PHASE 1

By ADRIKA DEVELOPERS PRIVATE LIMITED

RG-MH-28157 · RERA P51700024923 · Last updated on MahaRERA portal: 12 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
32 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 96%
16 of 1,806Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

DOSTI GREATER THANE - PHASE 1 is a Others project by ADRIKA DEVELOPERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700024923 on 12 Mar 2020. Possession was promised by 1 Apr 2026 and is now 6 months past that date. 1,790 of the 1,806 units on this registration are recorded sold or booked, and 32 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDOSTI GREATER THANE - PHASE 1
  • TypeOthers
  • Location
    • JUNCTION OF KALHER PIPELINE ROAD AND BUNDER ROAD
    • NEAR UMIYA COMPLEX AND S S HOSPITAL
    • Kopar
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700024923
  • ReraGenie IDRG-MH-28157

Builder

  • NameADRIKA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorDEEPAK KISHAN GORADIA
  • DirectorsRAJESH PREMJI SHAH, RAJUL VRAJLAL VORA
  • Other registrations8 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

6 months past promisethis monthRegisteredMar 2020PromisedApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Mar 2020
  • Promised completion1 Apr 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed124 files

Current status

99%1790 of 1,806 units booked

Figures as on 12 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DOSTI DELIGHTNA26206650665
DOSTI BLISSNA262047018488
DOSTI GLORYNA26202350235
DOSTI FORTUNENA261740018418

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 96%.

DOSTI DELIGHT81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
DOSTI BLISS81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
DOSTI GLORY81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
DOSTI FORTUNE81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities16

As on 12 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes90%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
MULTIPURPOSE LAWN SEATING POCKETS REFLEXOLOGY PATH KIDS PLAY AREA MEDITATION GAZEBO OUTDOOR GYM JOGGYes0%

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Closed/Covered144
Open Space190
BuildingClosed/CoveredOpen SpaceTotal
DOSTI DELIGHT6969138
DOSTI BLISS204666
DOSTI GLORY272350
DOSTI FORTUNE285280

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,443 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI79359.32
Proposed, not sanctioned66,234 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND AND MEZZANINE FLOOR, BOTAWALA CHAMBERS 2, MUMBAI 400001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY VORA
EngineerSWAPNIL RAMESH LONDHE
Chartered AccountantMANISH BARDIA
Chartered AccountantBAGADE & ASSOCIATES
PartnerRole in project
ADRIKA DEVELOPERS PRIVATE LIMITED-

Litigation declared2

CaseCourtStatus
119/2019CIVIL JUDGE JUNIOR DIVISIONFOR HEARING OF EXHIBIT FIVE
238/2017CIVIL JUDGE SENIOR DIVISIONFILLING OF SAY ON CONDONATION OF DELAY

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603618Raj ChavanADRIKA DEVELOPERS PRIVATE LIMITED12/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Adrika DGT Novocity PH1.pdf12 Nov 2025
Form 1File: DGT Novocity PHASE1 ARCH Certificate June2025.pdf28 Jul 2025
Form 2File: DGT Novocity Phase1 Engg Certificate June2025.pdf28 Jul 2025
Form 3File: DGT Novocity Phase1 CA Certificate June2025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: DGT PH1-Bliss_merged_compressed.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT PHASE-1 ARCH Certificate.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Phase-1 CA Certificate.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT PHASE-1 Engg Certificate.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DGT PHASE-1 Quality Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: ADPL DGT PH 1 Bliss Delight Fortune Glory_compressed (2).pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DGT Phase 1.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Phase 1.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DGT Phase 1.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: DGT PH 1_compressed.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: DGT Phase-1.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT Phase-1 Form1 Sep24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Phase-1 Form3 Sep24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT Phase-1 Form2 Sep24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DGT Phase-1.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 5-0 DGT Novocity Phase-1- Bliss Fortune Delight.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT Phase-1- Form1 Arch Cert June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT Phase-1- Form2 CA Cert June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Phase-1- Form3 CA Cert June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Dosti Novocity Phase-1.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DGT Novocity Phase 1.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Novocity Phase 1.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DGT Novocity Phase 1 Bliss Delight fortune Glory.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DGT Phase 1.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Dosti Bliss Delight fortune Glory.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certifi-DGT-Ph-I-Dec23.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certifi-DGT-Ph-I-Dec23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DGT Phase 1.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Greater Thane Phase 1.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-DGT-PH-I.pdf28 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Form 5 - Adrika -DGT PH -1 March 31, 2022.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Phase 1.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg-Form-2-DGT-PH-I.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Form-3-DGT-PH-I- Paradise.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate DGT Phase 1 Glory Delight Bliss Fortune.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: DGT Phase 1 Bliss Delight Fortune Glory.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dosti greater thane Ph1.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dosti greater thane Ph1.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti greater Thane Phase 1.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: DGT - Phase 1.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate DGT Phase 1.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DGT Ph1 March 2023.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: Dosti Greater Thane - Phase 1 - Bliss-Fortune Shops - Sold-Unsold Data.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dosti greater Thane Phase 1_compressed.pdf11 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dosti greater thane Phase 1_compressed.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch certificate Dosti Greater Thane PH1 dated March 2020 Signed.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DGT PH1 March 2021.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate DGT Ph1.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Dosti Greater Thane Ph 1 March 2020.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 DGT PH 1 March 2021.pdf6 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Greater thane Phase 1 Dec 2022.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Greater Thane PH 1 March 2020.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DGT PH1 signed march 2021.pdf6 Feb 2023
Disclosure of sold/ booked inventoryFile: DGT - Sold and Unsold Inventory.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Phase 1.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-DGT-Phase 1.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DGT Phase 1.pdf12 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate DGT.pdf12 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5-DGT-PH1.pdf12 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-DGT-PARADISE.pdf12 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate-DGT PH1.pdf23 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate-DGT PH1.pdf23 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-DGT PH1.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Greater Thane-Sept 2022.pdf7 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate DGT PHASE 1.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate DGT PHASE 1.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT PHASE 1.pdf18 Jul 2022
Details of encumbrancesFile: Index II - DGT Phase 1 - Details of Encumbrances_compressed.pdf4 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate DGT Ph1.pdf2 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate DGT Ph1.pdf2 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate DGT Ph 1.pdf2 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Dosti Greater Thane Phase 1Form 5.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 CA Certificate Sept 2021 DGT Ph 1_compressed.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DGT PH 1.pdf12 Oct 2021
Disclosure of sold/ booked inventoryFile: FORTUNE AND BLISS COMPILED.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: DELIGHT AND GLORY COMPRESSED.pdf8 Oct 2021

How this compares with Thane

99%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOSTI GREATER THANE - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR UMIYA COMPLEX AND S S HOSPITAL7,600+ in Thane

Builder: ADRIKA DEVELOPERS PRIVATE LIMITED

ADRIKA DEVELOPERS PRIVATE LIMITED has 9 registrations on MahaRERA, including DOSTI GREATER THANE - PHASE 1 and DOSTI GREATER THANE- PHASE 1 - DOSTI PARADISE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that DOSTI GREATER THANE - PHASE 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DOSTI GREATER THANE - PHASE 1 is delayed beyond 1 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI GREATER THANE - PHASE 1?

The registered promoter entity is ADRIKA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI GREATER THANE - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOSTI GREATER THANE - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOSTI GREATER THANE - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOSTI GREATER THANE - PHASE 1?

The professionals named in the filing: Architect: JAY VORA; Engineer: SWAPNIL RAMESH LONDHE; Chartered Accountant: MANISH BARDIA; Chartered Accountant: BAGADE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOSTI GREATER THANE - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI GREATER THANE - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI GREATER THANE - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.