DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
RG-MH-28388 · RERA P51700025834 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 11 cases
- 3 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE is a Others project by DOSTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700025834 on 19 Jul 2020. Possession is promised by 30 Dec 2027. 868 of the 901 units on this registration are recorded sold or booked, and 49 of 55 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameDOSTI WEST COUNTY - PHASE 4- DOSTI PINE
- TypeOthers
- Location
- BALKUM
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- RERA no.P51700025834
- ReraGenie IDRG-MH-28388
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Jul 2020
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings5 building records
- Documents filed145 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DOSTI PINE- WING A | NA | 40 | 30 | 211 | 4 | 215 |
| DOSTI PINE WING B | NA | 40 | 30 | 243 | 0 | 243 |
| DOSTI PINE WING C | NA | 40 | 30 | 153 | 0 | 153 |
| DOSTI PINE WING D | NA | 40 | 30 | 115 | 0 | 115 |
| DOSTI PINE WING E | NA | 33 | 30 | 175 | 0 | 175 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 93%.
DOSTI PINE- WING A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DOSTI PINE WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DOSTI PINE WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DOSTI PINE WING D99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 93% |
DOSTI PINE WING E92%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 77% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 82% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 68% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed1041
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| DOSTI PINE- WING A | 231 | 231 |
| DOSTI PINE WING B | 262 | 262 |
| DOSTI PINE WING C | 168 | 168 |
| DOSTI PINE WING D | 126 | 126 |
| DOSTI PINE WING E | 254 | 254 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DOSTI PINE- WING A | NA | Rs 79.27 cr | Rs 79.27 cr |
| DOSTI PINE WING B | NA | Rs 79.27 cr | Rs 79.27 cr |
| DOSTI PINE WING C | NA | Rs 79.27 cr | Rs 79.27 cr |
| DOSTI PINE WING D | NA | Rs 79.27 cr | Rs 79.27 cr |
| DOSTI PINE WING E | NA | Rs 79.27 cr | Rs 76.65 cr |
| - | NA | Rs 16.24 cr | Rs 7.24 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAY R VORA |
| Engineer | SWAPNIL LONDHE |
| Engineer | Vaibhav Raghunath Kalambate |
| Chartered Accountant | Manish Bardia and Co |
| Chartered Accountant | BAGADE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| DOSTI ENTERPRISES | - |
Litigation declared11
| Case | Court | Status |
|---|---|---|
| 586/2011 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 16/2013 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 389/2017 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 35/2017 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 4299/2017 | HIGH COURT OF BOMBAY | Ongoing |
| 8/2016 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 26/2019 | TAHSILDAR OF THANE | Closed |
| 313/2018 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
| 25/2017 | TAHSILADAR OF THANE | Closed |
| 193/2019 | SUB DIVISIONAL THANE | Closed |
| 586/2011 | CIVIL JUDGE SENIOR DIVISION | Ongoing |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198318 | Vincent Ribeiro | Dosti Enterprises | 11/09/2021 |
| CC006000000196371 | MandarSatardekar | Dosti West County | 16/03/2021 |
| CC006000000197303 | Booking refund or false sale | DOSTI ENTERPRISES | 17/06/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Oct 2024
Documents filed145
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - DWC Dosti Pine.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Dosti Enterprises DWC Dosti Pine Form 1 Mar26.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: Dosti Enterprises DWC Dosti Pine Form 2 Mar26.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Dosti Enterprises DWC Dosti Pine Form 3 Mar26_compressed (1).pdf | 2 May 2026 |
| Withdrawal Update Form 1File: Dosti Enterprises DWC Ph4 Pine Form 1 Dec25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Dosti Enterprises DWC Ph4 Pine Form 2 Dec25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Dosti Enterprises DWC Ph4 Pine Form 3 Dec25compressed.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Dosti Enterprises DWC Ph4 Pine Form 1 Sept25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: Dosti Enterprises DWC Ph4 Pine Form 2 Sept25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Dosti Enterprises DWC Ph4 Pine Form 3 Sept25_compressed.pdf | 24 Nov 2025 |
| Form 5 (FY 2024-2025)File: DE DWC PINE.pdf | 12 Nov 2025 |
| Form 1File: DWC Phase4 Pine Arch Certificate July2025.pdf | 27 Jul 2025 |
| Form 2File: DWC Phase4 Pine Engg Certificate July2025.pdf | 27 Jul 2025 |
| Form 3File: DWC Phase4 Pine CA Certificate July2025.pdf | 27 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DWC PH4 PINE Sold Unsold June2025_compressed (1).pdf | 27 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC PINE Arch certificate.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC PINE CA Certificate 10April2025.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC PINE Engg Certificate.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DWC PH 4 A B C D E.pdf | 15 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DWC PINE Quality Certificate March2025.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti PINE Architect certificate 25March2025.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti PINE CA certificate 25March2025.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti PINE Engineer certificate 25March2025.pdf | 26 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: DWC phase4 Pine Sold Unsold Dec2024.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Pine Architect Certificate.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Pine CA Certificate.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Pine Engineer Certificate.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Pine Architect Certificate.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dosti Pine CA certificate.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dosti Pine Engineer certificate.pdf | 4 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DWC Pine.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Pine Form1 Sep24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Pine Form3 Sep24.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Pine Form2 Sep24.pdf | 15 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DWC Dosti Pine.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DWC Dosti Pine.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 8-0 DWC Phase-4 Pine.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DWC Dosti Pine Form1 Arch Cert June 2024.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DWC Dosti Pine Form2 Engg Cert June 2024.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWC Dosti Pine Form3 CA Cert June 2024.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DWC Phase 4 Pine.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DWC Phase 4 Pine-compressed.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate DWC Dosti Pine.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DWC County Phase 4 Dosti Pine.pdf | 25 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Dostiwestcounty-DostiPine.pdf | 25 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Dosti Pine A B C D.pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate-DWC -Pine - Phase 4 - Wing A, B, C, D, E-Dec 23.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DWC Dosti Pine Phase 4.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti West County Phase 4 Dosti Pine.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti West County Dosti Pine Phase 4.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg-Form-2-PH-IV-DWC -Pine.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Dosti West County Dosti Pine Phase 4.pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dosti West County Phase 4 Dosti Pine.pdf | 23 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Dosti west County Phase IV Dosti Pine A B C D.pdf | 21 Oct 2023 |
| Building plan approvalFile: 63 Plan Scan_Part2.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part3.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part4.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part25.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part26.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part27.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part28.pdf | 27 Sep 2023 |
| Building plan approvalFile: 63 Plan Scan_Part29.pdf | 27 Sep 2023 |
| Layout approvalFile: 63 Plan Scan_Part1.pdf | 27 Sep 2023 |
| PAN CardFile: 1 PAN Card.pdf | 27 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: 63 Plan Scan_Part1.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part2.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part3.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part4.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part25.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part26.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part27.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part28.pdf | 27 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 63 Plan Scan_Part29.pdf | 27 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plan Certificate.pdf | 27 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Pine Phase 4.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dosti Pine.pdf | 18 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate Dosti Pine Phase 4.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Pine.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pine Architech Cert 22 May_compressed.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pine Eng Certi 15 May_compressed.pdf | 24 May 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DOSTI WEST COUNTY - PHASE 2 - DOSTI CEDAR | Balkum Thane | 316 | Completed | Dec 2023 | Feb 2023 |
| DOSTI WEST COUNTY - DOSTI OAK | Balkum Thane | 688 | Completed | Jun 2022 | Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations, which the RERA portal never shows together
- All 145 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DOSTI WEST COUNTY - PHASE 4- DOSTI PINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BALKUM7,600+ in Thane
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
Godrej Exquisite
Godrej Macbricks Private Limited
See every Thane project, with the district possession charts
Builder: DOSTI ENTERPRISES
DOSTI ENTERPRISES has 15 registrations on MahaRERA, including DOSTI WEST COUNTY - DOSTI OAK and DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if DOSTI WEST COUNTY - PHASE 4- DOSTI PINE is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
The registered promoter entity is DOSTI ENTERPRISES, an others as per the filing. Its GSTIN 27AAFFD4236J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
The professionals named in the filing: Architect: JAY R VORA; Engineer: SWAPNIL LONDHE; Engineer: Vaibhav Raghunath Kalambate; Chartered Accountant: Manish Bardia and Co; Chartered Accountant: BAGADE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DOSTI WEST COUNTY - PHASE 4- DOSTI PINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.