ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VIHANG LUXURIA

Registered Litigation declared Others project

VIHANG LUXURIA

By REYANSHP REALTY LLP

RG-MH-49674 · RERA P51700049126 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
14 of 32Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 95%
200 of 744Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 219 documents Report an error

VIHANG LUXURIA is a Others project by REYANSHP REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700049126 on 1 Feb 2023. Possession is promised by 31 Dec 2027. 544 of the 744 units on this registration are recorded sold or booked, and 14 of 32 construction stages are filed complete.

At a glance

Project

  • NameVIHANG LUXURIA
  • TypeOthers
  • Location
    • MIRE VILLAGE
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049126
  • ReraGenie IDRG-MH-49674

Builder

  • NameREYANSHP REALTY LLP
  • Entity typePartnership
  • PartnerPURVESH PRATAP SARNAIK
  • PartnerPARISHA PRATAP SARNAIK
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed219 files

Current status

73%544 of 744 units booked
43.4%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Reyansh Ventura Building no 1NA77077
Reyansh Ventura Building no 2Building no. 2 and 2A30140207207
LuxuriaBuilding 3A and Building 3B40345300530

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 32 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 95%.

Reyansh Ventura Building no 182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Reyansh Ventura Building no 2 · wing Building no. 2 and 2A40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)75%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Luxuria · wing Building 3A and Building 3B60%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)90%
Plinth100%
Stilt Floor95%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1753

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,753
Closed/Covered1,719
Open Space34
BuildingClosed/CoveredOpen SpaceTotal
Reyansh Ventura Building no 1143448
Reyansh Ventura Building no 2 Building no. 2 and 2A8740874
Luxuria Building 3A and Building 3B8310831

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,340 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2026
LandownerVillageDistrict
BHARAT GOVIND PATILMira-Bhayandar (M Corp.)Thane
Dipak Govind PatilMira-Bhayandar (M Corp.)Thane
Kumari Meena Govind PatilMira-Bhayandar (M Corp.)Thane
Smt Jayabai Yashwant BhoirMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Permissible FSI60294.07
Proposed, not sanctioned60,138 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMira Road Beverly Park Branch, Ground floor, Ashley Towers, Beverly Park, Mira Road east, besides Ci
Estimated costRs 352.59 cr
Cost incurredRs 152.94 cr
Work done43.38%
BuildingWingEstimatedIncurred
LuxuriaBuilding 3A and Building 3BRs 204.31 crRs 112.71 cr
Reyansh Ventura Building no 2Building no. 2 and 2ARs 122.56 crRs 36.40 cr
-NARs 21.90 cr-
Reyansh Ventura Building no 1NARs 3.82 crRs 3.82 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates
EngineerGaurav Mishra
Chartered AccountantR C Jain & associates LLP
Chartered AccountantHemant Goyal
Chartered AccountantLilani & Company
Chartered AccountantVinod Kumar Jain
PartnerRole in project
REYANSHP REALTY LLP-

Litigation declared1

CaseCourtStatus
767/2012Thane civil courtWITHDRAWN AND DISPOSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed219

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 219 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 luxuria for Q1 for 26-27 - signed.pdf21 Aug 2026
Withdrawal Update Form 2File: Form2 luxuria for Q1 for 26-27 - signed.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 Vihang Luxuria_Q1_2627_compressed.pdf21 Aug 2026
Form 2A (FY 2025-2026)File: MIRE FORM 2A - 2025-2026.pdf21 Aug 2026
Form 2A (FY 2024-2025)File: MIRE FORM 2A - 2024-2025.pdf21 Aug 2026
Form 2A (FY 2022-2023)File: MIRE FORM 2A - 2022 -2023.pdf21 Aug 2026
Form 2A (FY 2023-2024)File: MIRE FORM 2A - 2023-2024.pdf21 Aug 2026
Form 5 (FY 2022-2023)File: Form 5.pdf21 Aug 2026
Form 5 (FY 2023-2024)File: form 5 of 23 -24.pdf21 Aug 2026
Form 5 (FY 2024-2025)File: form 5 of 24-25.pdf21 Aug 2026
Withdrawal Update Form 1File: 20260722 MIRE FORM 1 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 1File: 20260722 MIRE FORM 1 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 1File: 20260722 MIRE FORM 1 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 1File: 20260722 MIRE FORM 1 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 1File: 20260722 MIRE FORM 1 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 2File: 20260722 MIRE FORM 2 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 2File: 20260722 MIRE FORM 2 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 2File: 20260722 MIRE FORM 2 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 2File: 20260722 MIRE FORM 2 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 2File: 20260722 MIRE FORM 2 AS ON DATE 31-03-2026 - SIGNED-compressed.pdf31 Jul 2026
Withdrawal Update Form 3File: Final- Form 3 Q4 Vihang Luxuria_compressed (1).pdf31 Jul 2026
Withdrawal Update Form 3File: Final- Form 3 Q4 Vihang Luxuria_compressed (1).pdf31 Jul 2026
Withdrawal Update Form 3File: Final- Form 3 Q4 Vihang Luxuria_compressed (1).pdf31 Jul 2026
Withdrawal Update Form 3File: Final- Form 3 Q4 Vihang Luxuria_compressed (1).pdf31 Jul 2026
Withdrawal Update Form 3File: Final- Form 3 Q4 Vihang Luxuria_compressed (1).pdf31 Jul 2026
Withdrawal Update Form 1File: FORM 1_LUXURIA _31-12-2025 - SIGNED.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM 2_ LUXURIA_ ENGINEERS CERTIFICATE _31-12-2025 signed.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 Mire signed-compressed.pdf18 Jul 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf17 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf17 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1__20260106 MIRE WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf16 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf16 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf16 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf16 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf16 Jun 2026
Withdrawal Update Form 2File: 20260205 MIRE ENGINEERS CERTIFICATE AS ON DATE 30-09-2025 - SIGNED.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3_Luxuria_JULY- SEP 2025-compressed.pdf16 Jun 2026
Layout approvalFile: Sheet 1- approved plan - with Marking.pdf23 Apr 2026
Layout approvalFile: Sheet 4-approved layout plan with Marking.pdf23 Apr 2026
Layout approvalFile: Sheet 10- approved layout with Marking.pdf23 Apr 2026
Layout approvalFile: sheet 17- approved layout EDITED.pdf23 Apr 2026
Layout approvalFile: Buildig plan approval Sheet 1 dated 310524 highlighted_compressed.pdf17 Apr 2026
Layout approvalFile: Building approved plan TENAMENT STATEMENT.pdf17 Apr 2026
Layout approvalFile: Building approved plan Parking statement.pdf17 Apr 2026
Layout approvalFile: CC letter dated 31 MAY 2024 highlighted.pdf17 Apr 2026
Form 1File: March 2025 MIRE RERA WORK PERCENTAGE COMPLETION CERTIFICATE.pdf6 Oct 2025
Form 2File: March 2025 MIRE RERA ENGINEER'S CERTIFICATE.pdf6 Oct 2025
Form 3File: Form 3 as on 31 March Luxuria Project_compressed.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Form 3 as on 31 March Luxuria Project_compressed.pdf6 Oct 2025
Self-declaration of Quarterly ProgressFile: March 2025 MIRE FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf6 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf6 Oct 2025
Withdrawal Update Form 2File: 20250903 MIRE ENGINEERu0027S CERTIFICATE .pdf6 Oct 2025
Withdrawal Update Form 3File: RERA Form 3 Vihang Luxuria-1 DATE 02-07-2024.pdf6 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20250403 MIRE RERA WORK PERCENTAGE COMPLETION CERTIFICATE.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20250403 MIRE RERA ENGINEER'S CERTIFICATE .pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 20250401 MIRE FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf3 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B DESIGNATED BANK ACCOUNT.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as dec 24 reyansh.pdf7 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A CERTIFICATE reyansh dec 2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20250227 MIRE PERCENTAGE OF WORK COMPLETION CERTIFICATE_compressed.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20250227 MIRE RERA ENGINEER'S CERTIFICATE.pdf28 Feb 2025
Building plan approvalFile: 1.pdf22 Feb 2025
Building plan approvalFile: 2.pdf22 Feb 2025
Building plan approvalFile: 3.pdf22 Feb 2025
Building plan approvalFile: 4.pdf22 Feb 2025
Building plan approvalFile: 5.pdf22 Feb 2025
Building plan approvalFile: 6.pdf22 Feb 2025
Building plan approvalFile: 7.pdf22 Feb 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VIHANG ATHARVAP51700079063GHODBUNDER, Thane217Feb 2025OngoingDec 2029Not due yet

How this compares with Thane

73%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIHANG LUXURIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRE VILLAGE7,600+ in Thane

Builder: REYANSHP REALTY LLP

REYANSHP REALTY LLP has 3 registrations on MahaRERA, including VIHANG LUXURIA and VIHANG ATHARVA. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VIHANG LUXURIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIHANG LUXURIA?

The registered promoter entity is REYANSHP REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIHANG LUXURIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIHANG LUXURIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIHANG LUXURIA?

The professionals named in the filing: Architect: Anish & Associates; Engineer: Gaurav Mishra; Chartered Accountant: R C Jain & associates LLP; Chartered Accountant: Hemant Goyal; Chartered Accountant: Lilani & Company; Chartered Accountant: Vinod Kumar Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIHANG LUXURIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIHANG LUXURIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIHANG LUXURIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.