Home / Browse projects / Thane, Maharashtra / Birla Taranya - Phase 1
Birla Taranya - Phase 1
By Ekamaya Properties Private Limited
RG-MH-54484 · RERA PR1331012502243 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Birla Taranya - Phase 1 is a Residential / Group Housing project by Ekamaya Properties Private Limited in Thane, Maharashtra, registered with MahaRERA as PR1331012502243 on 3 Feb 2026. Possession is promised by 31 Mar 2032. 0 of the 1,339 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBirla Taranya - Phase 1
- TypeResidential / Group Housing
- Location
- Thane Belapur Road
- Ground Floor
- Hindalco Industries
- Kalwa
- Thane
- 400605
- Pincode400605
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1331012502243
- ReraGenie IDRG-MH-54484
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2026
- Promised completion31 Mar 2032
- Revised completionNone
- Buildings5 building records
- Documents filed26 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING 1 | NA | 42 | 39 | 295 | 0 | 295 |
| WING 2 | NA | 42 | 39 | 295 | 0 | 295 |
| WING 3 | NA | 42 | 39 | 297 | 0 | 297 |
| WING 5 | NA | 44 | 40 | 226 | 0 | 226 |
| WING 6 | NA | 44 | 40 | 226 | 0 | 226 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.
WING 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | 0% |
Parking filed2969
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Basement | Podiums / Upper Parking Floor | Stack Parking | Total |
|---|---|---|---|---|---|
| WING 1 | 95 | 408 | 53 | 5 | 561 |
| WING 2 | 115 | 386 | 59 | 5 | 565 |
| WING 3 | 147 | 405 | 68 | 5 | 625 |
| WING 5 | 120 | 407 | 79 | 5 | 611 |
| WING 6 | 86 | 431 | 85 | 5 | 607 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Hindalco Industries Limited | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 329.28 cr | Rs 4.49 cr |
| WING 3 | NA | Rs 188.55 cr | - |
| WING 6 | NA | Rs 165.92 cr | - |
| WING 5 | NA | Rs 165.58 cr | - |
| WING 1 | NA | Rs 152.67 cr | - |
| WING 2 | NA | Rs 152.21 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PB Associates |
| Engineer | Pravin Gala Consultants Pvt Ltd |
| Engineer | Vinyasa Consultants |
| Engineer | Kailash Gaikwad |
| Chartered Accountant | Anil R Gupta & Co |
| Partner | Role in project |
|---|---|
| Ekamaya Properties Private Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 18916/2024 | Bombay High Court | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600141 | Bhakti Achrekar | Ekamaya Properties Private Limited | 16/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jan 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2032
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A- Taranya Phase 1 for 2025-26.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Birla Taranya - Phase 1 as on Mar 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form-2_Birla Taranya Ph1_as on 31 March.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form3 Birla Tarnaya Phase1 Mar 2026 (New).pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Birla Taranya - Phase 1 as on Mar 2026.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Form-2_Birla Taranya Ph1_as on 31 March.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Birla Taranya - Phase 1 as on 31 Mar 2026.pdf | 18 Apr 2026 |
| Declaration and undertaking (Annexure A)File: Order 50 -Declaration cum undertaking.pdf | 30 Jan 2026 |
| Layout approvalFile: Layout Plan Page 1.pdf | 28 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 2.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 3.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 4.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 5.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 8.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 9.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 10.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 11.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 12.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 13.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 14.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 16.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 17.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 18.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 19.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 20.pdf | 24 Jan 2026 |
| Building plan approvalFile: Approved Plan Page 21.pdf | 24 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Birla Taranya - Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ground Floor, Hindalco Industries7,600+ in Thane
Filed coordinates, straight-line distance. 107 registered projects within 2 km.
NANDANVAN HOMES-BUILDING B
SHREE KRUPA BUILDERS
MARUTI HOMES
Jay Shree Krishna Enterprises
SHREE SAI CHARAN CHSL
MANDAR CONSTRUCTIONS AND DEVELOPERS LLP
MAPLE ENCLAVE
MANDAR CONSTRUCTION AND DEVELOPERS
AMOL SAUBHAGYA
SUMAN REALTIES
SAI PALACE
SAI ENTERPRISES
See every Thane project, with the district possession charts
Builder: Ekamaya Properties Private Limited
Ekamaya Properties Private Limited has 2 registrations on MahaRERA, including Birla Taranya - Phase 1 and Birla Taranya - Retail 1. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Birla Taranya - Phase 1 is delayed beyond 31 Mar 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Birla Taranya - Phase 1?
The registered promoter entity is Ekamaya Properties Private Limited, a company as per the filing. Its CIN U68100MH2024PTC426643 and GSTIN 27AAICE2318J1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Birla Taranya - Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Birla Taranya - Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Birla Taranya - Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Birla Taranya - Phase 1?
The professionals named in the filing: Architect: PB Associates; Engineer: Pravin Gala Consultants Pvt Ltd; Engineer: Vinyasa Consultants; Engineer: Kailash Gaikwad; Chartered Accountant: Anil R Gupta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Birla Taranya - Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.