Home / Browse projects / Thane, Maharashtra / Stellar

Registered No litigation declared Residential / Group Housing project

Stellar

By Trimity Realty LLP

RG-MH-85050 · RERA P51700048590 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 30.00 crore secured on the land, in favour of AU Small Finance Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedmoved 18 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 25%
602 of 668Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 246 documents Report an error

Stellar is a Residential / Group Housing project by Trimity Realty LLP in Thane, Maharashtra, registered with MahaRERA as P51700048590 on 10 Jan 2023. Possession is promised by 30 Jun 2029. The completion date has moved by 18 months from the original filing. 66 of the 668 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameStellar
  • TypeResidential / Group Housing
  • Location
    • Panchpakhadi
    • Thane west
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048590
  • ReraGenie IDRG-MH-85050

Builder

  • NameTrimity Realty LLP
  • Entity typePartnership
  • GSTIN27AAMFT1276B1Z7
  • PartnersSwapnil Marathe, SHIVAESH LIFESPACES LLP

Key dates

this monthRegisteredJan 2023First promiseDec 2027Revised toJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2023
  • Promised completion30 Jun 2029
  • Revised completionRevised to 30 Jun 2029 (originally 31 Dec 2027)
  • Buildings2 building records
  • Documents filed246 files

Current status

10%66 of 668 units booked
10.7%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Sainath SRA Sahakari Gruha Nirman SansthaNA333133929368
StellarNA625726634300

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 25%.

Shree Sainath SRA Sahakari Gruha Nirman Sanstha39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Stellar37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed893

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots893
Closed/Covered536
Open Space357
BuildingClosed/CoveredOpen SpaceTotal
Shree Sainath SRA Sahakari Gruha Nirman Sanstha6357363
Stellar5300530

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,132 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Limited
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on14 Oct 2025
LandownerVillageDistrict
Shree Sainath Sahakari Gruhnirman Sanstha LimitedThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Slum Rehabilitation Authority
Permissible FSI36190.25
Proposed, not sanctioned36,122 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC 10& 11,HARGANGA MAHAL,KHODADAD CIRCLE,DADAR T.T.DR.B.A.ROAD,MUMBAI,MAHARASHTRA 400014
Estimated costRs 300.00 cr
Cost incurredRs 32.12 cr
Work done10.71%
BuildingWingEstimatedIncurred
StellarNARs 225.00 crRs 23.71 cr
Shree Sainath SRA Sahakari Gruha Nirman SansthaNARs 70.00 crRs 8.40 cr
-NARs 5.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRightangle
EngineerAjay Mahale
EngineerJSR Consultancy Services
EngineerIntegration Development Management Solution
EngineerNitin Narayan Parab
Chartered AccountantKapure and Kapure chartered Accountant
Chartered AccountantA J R R & Associates LLP
PartnerRole in project
Trimity Realty LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31122519172Dec 2027 → Jun 2029

Reason as filed by the promoteras per attacted Self Declaration

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed246

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 246 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - april to June 26.pdf24 Jul 2026
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - april to June 26.pdf24 Jul 2026
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Jan to March 26.pdf24 Jul 2026
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - april to June 26.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26- Stellar-compressed.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26- Stellar-compressed.pdf24 Jul 2026
Form 2A (FY 2025-2026)File: Trimity Realty LLP - From 2A - March 26.pdf26 Jun 2026
Commencement certificateFile: Sale Building Revised CC 120526.pdf20 May 2026
Withdrawal Update Form 1File: Trimity Realty LLP - form 1 Jan to March 26.pdf20 May 2026
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Jan to March 26.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 - March 26 Stellar_compressed.pdf20 May 2026
Layout approvalFile: Rehab Building 1_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 2_10.PDF23 Feb 2026
Building plan approvalFile: Rehab Building 3_10.PDF23 Feb 2026
Building plan approvalFile: Rehab Building 4_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 5_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 6_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 7_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 8_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 9_10_compressed.pdf23 Feb 2026
Building plan approvalFile: Rehab Building 10_10_compressed.pdf23 Feb 2026
Layout approvalFile: Sale Building 1_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 2_12.pdf23 Feb 2026
Building plan approvalFile: Sale Building 3_12.pdf23 Feb 2026
Building plan approvalFile: Sale Building 4_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 5_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 6_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 7_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 8_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 9_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 10_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 11_12_compressed.pdf23 Feb 2026
Building plan approvalFile: Sale Building 12_12_compressed.pdf23 Feb 2026
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - Dec 2025.pdf30 Jan 2026
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Dec 2025.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3- Stellar_31-12-2025 comp.pdf30 Jan 2026
Form 2A (FY 2022-2023)File: Form -2 A - March 23.pdf29 Dec 2025
Form 2A (FY 2023-2024)File: Stellar - Form 2A - March 24.pdf29 Dec 2025
Form 2A (FY 2024-2025)File: Stellar Form 2A - March 25.pdf29 Dec 2025
Form 5 (FY 2022-2023)File: FORM 5 - Project Stellar.pdf1 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 - Trimity Realty LLP - 23-24 - signed form.pdf1 Dec 2025
Form 5 (FY 2024-2025)File: Trimity Realty LLP - Form 5 - 24-25-4-6.pdf1 Dec 2025
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - Sept 25.pdf31 Oct 2025
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - Sept 25.pdf31 Oct 2025
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - Sept 25.pdf31 Oct 2025
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Sept 2025.pdf31 Oct 2025
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Sept 2025.pdf31 Oct 2025
Withdrawal Update Form 2File: Trimity Realty LLP - Form 2 - Sept 2025.pdf31 Oct 2025
Withdrawal Update Form 3File: Trimity Realty LLP Form 3 - Sep 25_compressed.pdf31 Oct 2025
Withdrawal Update Form 3File: TRLLP_ Form 3_ Sep 2025_0001_compressed.pdf31 Oct 2025
Withdrawal Update Form 3File: TRLLP_ Form 3_ Sep 2025_0001_compressed.pdf31 Oct 2025
Withdrawal Update Form 1File: Trimity Realty LLP - Form 1 - April to June 25.pdf26 Sep 2025
Withdrawal Update Form 2File: Trimity Realty LLP - Form-2 April to June 25.pdf26 Sep 2025
Withdrawal Update Form 3File: Trimity Realty LLp - From 3 - April to June 25_compressed.pdf26 Sep 2025
Form 1File: Stellar Architect Certificate Form 1 - Jan to March 2025.pdf13 Jun 2025
Form 2File: Form 2.pdf13 Jun 2025
Form 3File: Form 3_Compressed.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Trimity Realty LLP - disclosuer March 2025_c.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Stellar Architect Certificate Form 1 - Jan to March 2025.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCANscan01012001_20010101055849_compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Trimity Realty LLP - disclosuer March 2025_c.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 03-01-2025.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Stellar_Form 3_ December 2024 _compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31-12-2024.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Sep 2024_com.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA certificate 06112024.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Stellar Jun 24-1-10.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Stellar Jun 24-11-20.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Sep 24-1-10.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Sep 24-11-20.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate _ Stellar September 2024.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Trimity Realty LLP - 23-24 - signed form.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Stellar Engineer Certificate Form 2 30062024.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 01-07-2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Stellar 01042024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Stellar 07032024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate31032024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate07032024.pdf20 Apr 2024
Building plan approvalFile: Sale Building 1_11.pdf13 Apr 2024

How this compares with Thane

10%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Stellar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane west7,600+ in Thane

2 kmStellarCompleted 122Lapsed / revoked 78Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 361 registered projects within 2 km.

Builder: Trimity Realty LLP

Trimity Realty LLP has 1 registration on MahaRERA, including Stellar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Stellar is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Stellar?

The registered promoter entity is Trimity Realty LLP, a partnership as per the filing. Its GSTIN 27AAMFT1276B1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Stellar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Stellar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Stellar?

The professionals named in the filing: Architect: Rightangle; Engineer: Ajay Mahale; Engineer: JSR Consultancy Services; Engineer: Integration Development Management Solution; Engineer: Nitin Narayan Parab; Chartered Accountant: Kapure and Kapure chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Stellar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Stellar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Stellar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.