Registered No litigation declared Residential / Group Housing project

10 Marina Bay

By EV HOMES CONSTRUCTIONS PVT LTD

RG-MH-29553 · RERA P51700028722 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
14 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 95%
443 of 612Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

10 Marina Bay is a Residential / Group Housing project by EV HOMES CONSTRUCTIONS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700028722 on 25 Mar 2021. Possession is promised by 30 Jun 2028. 169 of the 612 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete.

At a glance

Project

  • Name10 Marina Bay
  • TypeResidential / Group Housing
  • Location
    • Sector 10
    • Vashi
    • Navi Mumbai (M Corp.)
    • Thane
    • 400703
  • Pincode400703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028722
  • ReraGenie IDRG-MH-29553

Builder

  • NameEV HOMES CONSTRUCTIONS PVT LTD
  • Entity typeCompany
  • CINU45200MH2005PTC155637
  • GSTIN27AABCE5013H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsELENJIKAMALIL VARKEY THOMAS, JOISE THOMAS, VICKY THOMAS, RICKI THOMAS
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2021PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2021
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed140 files

Current status

28%169 of 612 units booked
95.1%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EV 10 Marina BayNA32232300230
Ev Shraddha Wing A1NA28241900190
EV Shradha Wing A 2NA28241920192

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 95%.

EV 10 Marina Bay87%
ActivityProgress
Excavation95%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Ev Shraddha Wing A172%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)75%
Plinth75%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
EV Shradha Wing A 272%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)75%
Plinth75%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes92%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes93%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes87%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed611

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots611
Closed/Covered611
BuildingClosed/CoveredTotal
EV 10 Marina Bay401401
Ev Shraddha Wing A1105105
EV Shradha Wing A 2105105

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,390 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shradha Co-Operative Housing Society LimitedNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI50698.6
Proposed, not sanctioned50,699 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVardhaman Chambers Co-Op-So, Plot No 84, Sector 17, Vashi - 400703
Estimated costRs 235.35 cr
Cost incurredRs 223.88 cr
Work done95.13%
BuildingWingEstimatedIncurred
EV 10 Marina BayNARs 76.10 crRs 73.54 cr
Ev Shraddha Wing A1NARs 76.10 crRs 73.54 cr
EV Shradha Wing A 2NARs 76.10 crRs 73.54 cr
-NARs 7.06 crRs 3.26 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDessin 2000
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantJayesh Sanghrajka & Co. LLP
PartnerRole in project
EV HOMES CONSTRUCTIONS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - 10 Marina Bay as on Dec 25.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - 10 Marina Bay as on 31st Dec 25.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 - 10 Marina Bay as on 31st Dec 25.pdf21 May 2026
Form 5 (FY 2024-2025)File: Form 5 10 Marina Bay FY 24-25.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1- 10 Marina Bay as on Sep 2025.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 - 10 Marina Bay as on Sep 2025.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 - 10 Marina Bay as on Sep 2025.pdf18 Nov 2025
Layout approvalFile: Plan 1.pdf10 Nov 2025
Building plan approvalFile: Plan 1.pdf10 Nov 2025
Building plan approvalFile: Plan 2.pdf10 Nov 2025
Building plan approvalFile: Plan 3.pdf10 Nov 2025
Building plan approvalFile: Plan 4.pdf10 Nov 2025
Building plan approvalFile: Plan 5.pdf10 Nov 2025
Building plan approvalFile: Plan 6.pdf10 Nov 2025
Building plan approvalFile: Plan 7.pdf10 Nov 2025
Building plan approvalFile: Plan 8.pdf10 Nov 2025
Building plan approvalFile: Plan 9.pdf10 Nov 2025
Building plan approvalFile: Plan 10.pdf10 Nov 2025
Form 1File: Form 1 - 10 Marina Bay as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - 10 Marina Bay as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - 10 Marina Bay as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - 10 Marina Bay as on June 2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 10 Marina Bay - Sep 24_11zon.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 10 Marina Bay - Dec 24_11zon.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mar 2025_11zon (1).pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 10 Marina Bay - Sep 24.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 10 Marina Bay - Dec 24.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 2025.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29 Sold Unsold 10 Marina Bay Mar 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 10 Marina Bay as on Mar 25.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 10 Marina Bay as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -10 Marina Bay as on March 2025.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 10 Marina Bay Form 5 FY 23-24.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 10 Marina Bay as on Dec 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 10 Marina Bay as on Dec 2024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Unsold inventory -10 Marina Bay - 04-10-2024.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of EV Shradha as on 30-09-2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of EV Shradha as on 30-09-2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - 10 Marina Bay - Jun'24.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold_Unsold till 30-06-2024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - 10 Marina Bay - Jun'24_11zon.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of EV Shradha as on 30 June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of EV Shradha as on 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 10 Marina Bay as on June 2024.pdf16 Jul 2024
Layout approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-1.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-2.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-3.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-4.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-5.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-6.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-7.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-8.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-9.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-10.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-11_rotated.pdf15 Jul 2024
Building plan approvalFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-12_rotated.pdf15 Jul 2024
Copy of Layout Approval (in case of layout)File: SHRADDHA NEW DRAWING 2024_compressed_rotated-1.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-2.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-3.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-4.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-5.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-6.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-7.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-8.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-9.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-10.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-11_rotated.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: SHRADDHA NEW DRAWING 2024_compressed_rotated-12_rotated.pdf15 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: SHRADDHA CC 2024.pdf15 Jul 2024
Declaration about Commencement CertificateFile: Format D - Declaration About Commencement Certificate_0001.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - 10 Marina Bay - Mar'24.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - 10 Marina Bay - Mar'24.pdf21 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23_0001.pdf21 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24_0001.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - 10 Marina Bay - Mar'24_organized_11zon.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of EV Shradha as on 31-03-2024 - Revised.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of EV Shradha as on 31-03-2024 (1).pdf17 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5-2022-23-EV-Shraddha.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Dec-2023-10-Marina Bay.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-10-Marina Bay-Sept-2023.pdf1 Mar 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SINAI TOWERKAKINAD KOCHI KERALA 68201738CompletedJul 2017Feb 2017
E V CASTLEPLOT NO 110 SECTOR 9 ULVE TALUKA PANVEL DISTT RAIGAD 41020626CompletedApr 2016Apr 2016
ZION I AND IIPLOT NO 29 AND 30 SECTOR 25 NERUL EAST NAVI MUMBAI 40070659CompletedMar 2016Late, May 2017
SAFFIRE HEIGHTSPLOT NO 32A AND 33A SECTOR 12 KALAMBOLI TALUKA PANVEL DISTT RAGIAD 41020970CompletedMar 2010Late, May 2012

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 10 Marina Bay on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vashi7,600+ in Thane

2 km10 Marina BayCompleted 14Lapsed / revoked 6Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: EV HOMES CONSTRUCTIONS PVT LTD

EV HOMES CONSTRUCTIONS PVT LTD has 6 registrations on MahaRERA, including EV CITY CENTRE and EV Heart City. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if 10 Marina Bay is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 10 Marina Bay?

The registered promoter entity is EV HOMES CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45200MH2005PTC155637 and GSTIN 27AABCE5013H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 10 Marina Bay?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 10 Marina Bay?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 10 Marina Bay?

The professionals named in the filing: Architect: Dessin 2000; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Jayesh Sanghrajka & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 10 Marina Bay?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 10 Marina Bay. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 10 Marina Bay to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.