TIARA HILLS PHASE I BLDG NO 3, 5 AND 2

By PNK SPACE DEVELOPMENT PVT LTD

RG-MH-54616 · RERA P51700010406 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 8 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
16 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
367 of 1,028Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

TIARA HILLS PHASE I BLDG NO 3, 5 AND 2 is a Residential / Group Housing project by PNK SPACE DEVELOPMENT PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700010406 on 24 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 661 of the 1,028 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameTIARA HILLS PHASE I BLDG NO 3, 5 AND 2
  • TypeResidential / Group Housing
  • Location
    • NATIONAL EXPRESS HIGHWAY 8
    • KASHIMIRA
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010406
  • ReraGenie IDRG-MH-54616

Builder

  • NamePNK SPACE DEVELOPMENT PVT LTD
  • Entity typeCompany
  • DirectorsNilesh Shantilal Tank, Praful Shantilal Tank, KIRAN SHANTILAL TANK, Mansukh Gokal Tank

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2025)
  • Buildings3 building records
  • Documents filed118 files

Current status

64%661 of 1,028 units booked
75.6%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TIARA HILLS BLDG NO 5NA26232900290
TIARA HILLS BLDG NO 2NA26233360336
TIARA HILLS BLDG NO 3NA26234020402

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

TIARA HILLS BLDG NO 590%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
TIARA HILLS BLDG NO 235%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure42%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TIARA HILLS BLDG NO 389%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes65%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed493

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots493
Closed/Covered442
Open Space51
BuildingClosed/CoveredOpen SpaceTotal
TIARA HILLS BLDG NO 513217149
TIARA HILLS BLDG NO 216417181
TIARA HILLS BLDG NO 314617163

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,946 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SANJAY MAFATLAL MORAKHIABorivaliMumbai Suburban
SEJ LAXMI DEVELOPERSAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMIRA BHAINDAR MUNICIPAL CORPORATION
Permissible FSI56389.63
Proposed, not sanctioned33,317 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANTI SHOPPING CENTER MIRA ROAD EAST
Estimated costRs 160.60 cr
Cost incurredRs 121.41 cr
Work done75.6%
BuildingWingEstimatedIncurred
TIARA HILLS BLDG NO 3NARs 53.50 crRs 53.06 cr
TIARA HILLS BLDG NO 5NARs 48.95 crRs 48.54 cr
TIARA HILLS BLDG NO 2NARs 48.51 crRs 11.90 cr
-NARs 9.64 crRs 7.90 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIRMEEK ASSOCIATES
EngineerFINITE CONSULTANTS
EngineerHRUSHIKESH ABHAY MALGAONKAR
Chartered AccountantAJAY SHAH
Chartered AccountantREENA MAHENDRAKUMAR SOLANKI
PartnerRole in project
PNK SPACE DEVELOPMENT PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018434Dec 2025 → Dec 2026

Reason as filed by the promoterOur Project ‘Tiara Hills Phase 1’ comprising of 3 Buildings viz., Building No.3, 5 & 2 (presently all sanctioned till basement + stilt + 23 upper floors). Due to covid pendemic i.e. during lockdown and even thereafter our project was worst affected and construction activity was totally stopped for a longer period, due to covid detection at our site. Also on initiation of the construction post pendemic, due to shortage of labour (since labours are mainly from state other than Maharashtra) and non supply of materials the construction activity was completely shattered and therefore timelines for

Litigation declared5

CaseCourtStatus
264/2014THANE CIVIL COURTClosed
CRIMINAL APPLICATION NO 266/2012HIGH COURT BOMBAYClosed
3/2019THANE COURTINJUNCTION REJECTED AND FOR FRAMING ISSUES
16162/2019HIGH COURT BOMBAYClosed
15631/2019HIGH COURT BOMBAYClosed

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000079291Burhan N. Unchwaniwala & Abdulkader UnchwaniwalaPNK Space Development Private Limited18/05/2019
CC006000000209439RAHUL DEEPAK PRABHUPNK SPACE DEVELOPMENT PVT LTD16/12/2021
CC006000000220991PNK Space Development Private LimitedRahul Deepak Prabhu27/04/2022
CC006000000439712Nandlal Harilal RatnaniSej Laxmi Developers20/03/2024
CC006000000480118AJAY PRAKASH PANDEYpnk space development pvt ltd17/04/2024
CC12501412ravi prakash mishraPNK SPACE DEVELOPMENT PVT LTD27/04/2025
CC12601261Pooja TiwariPNK SPACE DEVELOPMENT PVT LTD08/03/2026
CC12604167Mukesh JhaPNK SPACE DEVELOPMENT PVT LTD03/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jul 2026
Withdrawal Update Form 1File: Form 1 02 01 2026 PNK Space.pdf23 Mar 2026
Withdrawal Update Form 2File: FORM -2_TIARA for Dec25.pdf23 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf23 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf8 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf8 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf8 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf7 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf7 Mar 2026
Withdrawal Update Form 2File: FORM -2.pdf7 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf7 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf7 Mar 2026
Form 2A (FY 2024-2025)File: Engineer Certificate form 2A_Mar25.pdf12 Jan 2026
Form 1File: Form 1 PNK Space.pdf8 Aug 2025
Form 2File: Form 2 PNK Space.pdf8 Aug 2025
Form 3File: Form 3 - PNK Space new.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: List of Sold unsold Inventory new.pdf8 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 02042025.pdf16 Apr 2025
Certificates of CA (Form 3)File: Form 3_Mar 25_compressed.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 07042025.pdf14 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3_Mar 25_compressed.pdf14 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 03022025.pdf1 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_051024.pdf9 Dec 2024
Certificates of CA (Form 3)File: Form 3_30092024.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_140824.pdf26 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 07102024.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TH_Form 1_020724.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TH_Form 2_080724.pdf13 Aug 2024
Certificates of CA (Form 3)File: TH_Form 3_170724.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 DT 16042024.pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Form 2 DT 17042024.pdf10 May 2024
Certificates of CA (Form 3)File: CA Certificate Form 3 DT 20042024.pdf10 May 2024
Declaration in FORM BFile: Form B 26122023.pdf27 Dec 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE of sold.pdf27 Dec 2023
Declaration in FORM BFile: Form B.pdf26 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 01 07 2023.pdf26 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 01 10 2023.pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 15 04 2023.pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 07 07 2023.pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 22 12 2023.pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31 3 22.pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31 3 23.pdf26 Dec 2023
Certificates of CA (Form 3)File: Form3 31 3 23.pdf26 Dec 2023
Certificates of CA (Form 3)File: Form3 30 9 23.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31 3 22.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 31 3 23.pdf26 Dec 2023
Certificates of CA (Form 5)File: Form 5 03 07 2023.pdf8 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 03 07 2023.pdf8 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 30112022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Crtificate dt 07 12 2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: C A Certificate 07122022.pdf17 Jun 2023
Certificates of CA (Form 5)File: C A Certificate 01 06 2023.pdf16 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: C A Certificate 01 06 2023.pdf16 Jun 2023
Certificates of CA (Form 5)File: C A Certificate Form 5.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: C A Certificate Form 5.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: C A Certificate Form 5.pdf20 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 01 04 2023.pdf4 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 30032022.pdf11 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 30032022.pdf11 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 10012022.pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Crtificate 31032022.pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Crtificate 02012022.pdf11 May 2022
Certificates of CA (Form 3)File: C A Certificate 12042022.pdf11 May 2022
Certificates of CA (Form 3)File: C A Certificate 01032022.pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf19 Jul 2021
Certificates of CA (Form 3)File: C A Certificate .pdf19 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf17 Jul 2021

How this compares with Thane

64%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TIARA HILLS PHASE I BLDG NO 3, 5 AND 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmTIARA HILLS PHASE I BLDGCompleted 41Lapsed / revoked 24Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 121 registered projects within 2 km.

Builder: PNK SPACE DEVELOPMENT PVT LTD

PNK SPACE DEVELOPMENT PVT LTD has 1 registration on MahaRERA, including TIARA HILLS PHASE I BLDG NO 3, 5 AND 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if TIARA HILLS PHASE I BLDG NO 3, 5 AND 2 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

The registered promoter entity is PNK SPACE DEVELOPMENT PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

The professionals named in the filing: Architect: NIRMEEK ASSOCIATES; Engineer: FINITE CONSULTANTS; Engineer: HRUSHIKESH ABHAY MALGAONKAR; Chartered Accountant: AJAY SHAH; Chartered Accountant: REENA MAHENDRAKUMAR SOLANKI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TIARA HILLS PHASE I BLDG NO 3, 5 AND 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TIARA HILLS PHASE I BLDG NO 3, 5 AND 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TIARA HILLS PHASE I BLDG NO 3, 5 AND 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.