Home / Browse projects / Thane, Maharashtra / SAMRIN HERITAGE
SAMRIN HERITAGE
By SAMRIN INFRA PRIVATE LIMITED
RG-MH-65298 · RERA P51700016394 · Last updated on MahaRERA portal: 23 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 36 months
- 3 extensions taken
- Rs 200.00 crore secured on the land, in favour of SBI Venture Cap
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRIN HERITAGE is a Others project by SAMRIN INFRA PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700016394 on 10 May 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 235 of the 488 units on this registration are recorded sold or booked, and 19 of 44 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameSAMRIN HERITAGE
- TypeOthers
- Location
- Almeda Road
- Panchpakhadi
- Thane (M Corp.)
- Thane
- 400602
- Pincode400602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700016394
- ReraGenie IDRG-MH-65298
Builder
- NameSAMRIN INFRA PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorMUSTAK SAIFAN SHAIKH
- DirectorsMOHAMMED TAHIR MUSTAK SHAIKH, NAJMA MUSTAK SHAIKH
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 May 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings4 building records
- Documents filed429 files
Current status
Figures as on 23 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| S1 | NA | 39 | 37 | 140 | 24 | 164 |
| S2 | NA | 39 | 37 | 151 | 15 | 166 |
| S3 | NA | 23 | 21 | 75 | 5 | 80 |
| S4 | NA | 37 | 32 | 46 | 32 | 78 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 99%.
S164%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
S268%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
S382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
S449%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed291
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| S1 | 122 | 122 |
| S2 | 80 | 80 |
| S3 | 52 | 52 |
| S4 | 37 | 37 |
Land and ownership4
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| PRABHUDAYAL J PATHAK | Thane (M Corp.) | Thane |
| OMPRAKASH J PATHAK | Thane (M Corp.) | Thane |
| DURGAPRASAD J PATHAK | Thane (M Corp.) | Thane |
| SURENDRAKUMAR J PATHAK | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| S1 | NA | Rs 66.12 cr | Rs 65.34 cr |
| S2 | NA | Rs 66.12 cr | Rs 65.34 cr |
| S3 | NA | Rs 66.12 cr | Rs 65.34 cr |
| S4 | NA | Rs 66.12 cr | Rs 65.34 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nextstep Consultant |
| Engineer | Ajay Mahale |
| Chartered Accountant | Nilesh G Palande |
| Chartered Accountant | M.s Singh Ranjan & Co |
| Chartered Accountant | Ms SAAN & Co |
| Partner | Role in project |
|---|---|
| SAMRIN INFRA PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was started prior to outbreak of COVID-19, which had an impact on real estate project for nearly 2 years, from March 2020 to February 2022. This has resulted in slow progress in construction. However we are trying to complete the project at the earliest. The status of current construction is reflected in Form 1 attached herewith. We intend to execute an agreement with the new customer to mention the date of possession on or before 29.12.2024. Kindly process our application and grant us the extension till 29.12.2024.
Reason as filed by the promoter• The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. • We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. • Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. • The geopolitical tension around the globe has led to
Reason as filed by the promoterREASONS FOR DELAY 1.The Developer submits that the project could have been completed within the stipulated timeline; however, an ongoing litigation initiated by an adjoining landowner has directly impacted the project’s progress since March 2023. 2.The proposed parking building was planned to be constructed on Plot No. 376. A litigation concerning the said plot was filed by Mr. Kamlakar B. Patil, registered as RCS No. 584/2020, and is presently pending before the City Civil Court, Thane, before Hon’ble Judge Smt. Jagdale. The next hearing in this matter is scheduled on 31/10/2025. 3.The Respon
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000429173 | Sandeep Francis Pereira | M/s. Samrin Infra Pvt. Ltd. | 09/02/2024 |
| CC006000000439637 | Ankush Ramchandra Pashte | Samrin Infra Private Limited | 15/03/2024 |
| CC12601014 | Kranti Sawant | SAMRIN INFRA PRIVATE LIMITED | 25/02/2026 |
| CC12602083 | Pramod Sakharam Kondaskar | SAMRIN INFRA PRIVATE LIMITED | 09/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed429
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 429 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 (30-06-2026).pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 (30-06-2026).pdf | 23 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 (30-06-2026).pdf | 23 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 (30-06-2026).pdf | 23 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (30-06-2026).pdf | 23 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (30-06-2026).pdf | 23 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A (2025-26).pdf | 23 Jul 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 ( 2025-26).pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 (30-06-2026).pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 (30-06-2026).pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (1-1-2026 to 31-03-2026)_compressed.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 (1-1-2026 to 31-03-2026)_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 (1-1-2026 to 31-03-2026)_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 (1-1-2026 to 31-03-2026)_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q3_2025-2026 (1).pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Q3_2025-2026.pdf | 23 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A _2024-2025.pdf | 20 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form-2A 2023-2024.pdf | 20 Nov 2025 |
| Form 1File: Form 1 Architect Heritage.pdf | 19 Nov 2025 |
| Form 2File: Form 2-Samrin Heritage 2025-26 (Q2).pdf | 19 Nov 2025 |
| Form 3File: Form 3 Samrin Heritage 30-09-25.pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 19 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Annexure K-Non-Encumbrance Concerned to Finance & Legal.pdf | 19 Nov 2025 |
| Form 2File: Form 2 Nov 2024 sign.pdf | 19 Nov 2025 |
| Form 1File: Form 1 Nov 2024.pdf | 19 Nov 2025 |
| Form 3File: Form3.pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 19 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Annexure K-Non-Encumbrance Concerned to Finance & Legal.pdf | 19 Nov 2025 |
| Form 1File: Form1.pdf | 19 Nov 2025 |
| Form 2File: Form2.pdf | 19 Nov 2025 |
| Form 3File: Form3..pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 19 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Annexure K-Non-Encumbrance Concerned to Finance & Legal.pdf | 19 Nov 2025 |
| Form 1File: Form1mar24.pdf | 19 Nov 2025 |
| Form 2File: Form2mar24.pdf | 19 Nov 2025 |
| Form 3File: Form3mar24.pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 19 Nov 2025 |
| Form 1File: form 1 (Q-1).pdf | 19 Nov 2025 |
| Form 2File: Form 2 (Q-1).pdf | 19 Nov 2025 |
| Form 3File: Form 3 (Q-1).pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 (Q-1).pdf | 19 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form5 2023-24.pdf | 18 Nov 2025 |
| Form 1File: Form 1 June 2025.pdf | 17 Nov 2025 |
| Form 2File: Form 2-June 2025.pdf | 17 Nov 2025 |
| Form 3File: Form 3-June 2025.pdf | 17 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 17 Nov 2025 |
| Form 1File: Form 1 March 2025.pdf | 17 Nov 2025 |
| Form 2File: Form 2 March 2025.pdf | 17 Nov 2025 |
| Form 3File: Form 3 March 2025.pdf | 17 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure B-Disclosure if Sold or Unsold Inventory.pdf | 17 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5_2024-2025.pdf | 10 Nov 2025 |
| Form 1File: Form 1 June 2025.pdf | 31 Jul 2025 |
| Form 2File: Form 2-June 2025.pdf | 31 Jul 2025 |
| Form 3File: Form 3 Samrin Heritage Q-1 (30-06-2025).pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 Samrin Heritage Q-1 (30-06-2025).pdf | 31 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf | 5 May 2025 |
| Certificates of CA (Form 3)File: Form-3_Q4_FY 24-25_SIPL.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf | 29 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3_FY 23-24.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2024.pdf | 25 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3_Q3_FY24-25_SIPL.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf | 16 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance and Legal.pdf | 11 Jan 2025 |
| CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf | 11 Jan 2025 |
| CERSAI detailsFile: Annexure L- Assets Based Declaration.pdf | 11 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance and Legal.pdf | 11 Jan 2025 |
| Layout approvalFile: 1 Layout.pdf | 19 Dec 2024 |
| Layout approvalFile: 2 Basement S1 S2 S3 S4.pdf | 19 Dec 2024 |
| Layout approvalFile: 3 Plot Area Calculation.pdf | 19 Dec 2024 |
| Layout approvalFile: 4 S1 Gr Floor.pdf | 19 Dec 2024 |
| Layout approvalFile: 5 S1 First Floor.pdf | 19 Dec 2024 |
| Layout approvalFile: 6 S1 2nd Floor.pdf | 19 Dec 2024 |
| Layout approvalFile: 7 S1.pdf | 19 Dec 2024 |
| Layout approvalFile: 8.pdf | 19 Dec 2024 |
| Layout approvalFile: 10.pdf | 19 Dec 2024 |
| Layout approvalFile: 11.pdf | 19 Dec 2024 |
| Layout approvalFile: 12.pdf | 19 Dec 2024 |
| Layout approvalFile: 14.pdf | 19 Dec 2024 |
| Layout approvalFile: 15.pdf | 19 Dec 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| CHANGUNA AANGANp51700051386 | S. NO. 162 & 167 H. NO. 4, DAWALE, S. NO. 162 & 167 H. NO. 4, Thane (M Corp.), Thane, Thane, 400612, MAHARASHTRA | Ongoing | Dec 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 429 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMRIN HERITAGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panchpakhadi7,600+ in Thane
Filed coordinates, straight-line distance. 379 registered projects within 2 km.
Stellar
Trimity Realty LLP
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
DIVINE SHLOKA
OM DIVINE BUILDCON LLP
See every Thane project, with the district possession charts
Builder: SAMRIN INFRA PRIVATE LIMITED
SAMRIN INFRA PRIVATE LIMITED has 1 registration on MahaRERA, including SAMRIN HERITAGE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SAMRIN HERITAGE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRIN HERITAGE?
The registered promoter entity is SAMRIN INFRA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRIN HERITAGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMRIN HERITAGE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMRIN HERITAGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRIN HERITAGE?
The professionals named in the filing: Architect: Nextstep Consultant; Engineer: Ajay Mahale; Chartered Accountant: Nilesh G Palande; Chartered Accountant: M.s Singh Ranjan & Co; Chartered Accountant: Ms SAAN & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRIN HERITAGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback