Registered No litigation declared Residential / Group Housing project

Raheja Lunaris-2

By Raheja Universal (Pvt.) Ltd.

RG-MH-77762 · RERA PR1331012501769 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 90.00 crore secured on the land, in favour of Standard Chartered Bank
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
1 of 50Construction stages doneacross 5 buildings; furthest along: Excavation, 60%
760 of 760Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

Raheja Lunaris-2 is a Residential / Group Housing project by Raheja Universal (Pvt.) Ltd. in Thane, Maharashtra, registered with MahaRERA as PR1331012501769 on 15 Dec 2025. Possession is promised by 31 Dec 2031. 0 of the 760 units on this registration are recorded sold or booked, and 1 of 50 construction stages are filed complete.

At a glance

Project

  • NameRaheja Lunaris-2
  • TypeResidential / Group Housing
  • Location
    • Opp Juinagar Station Road
    • MIDC Industrial Area
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1331012501769
  • ReraGenie IDRG-MH-77762

Builder

  • NameRaheja Universal (Pvt.) Ltd.
  • Entity typeCompany
  • CINU45200MH1980PTC023430
  • GSTIN27AABCG7955Q1ZS
  • DirectorsAshish Suresh Raheja, Rahul Suresh Raheja, Suresh Lachmandas Raheja
  • Other registrations16 more →
  • Completed2 of 17
  • Declared earlier projects13 →

Key dates

this monthRegisteredDec 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings5 building records
  • Documents filed20 files

Current status

0%0 of 760 units booked
0.7%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAHEJA LUNARIS 2ANA37311860186
RAHEJA LUNARIS 2BNA37311860186
RAHEJA LUNARIS 2CNA37311860186
RAHEJA LUNARIS 2DNA37311860186
RAHEJA LUNARIS SHOP/RESTAURANTNA4201616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 50 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 60%.

RAHEJA LUNARIS 2A10%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAHEJA LUNARIS 2B6%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAHEJA LUNARIS 2C4%
ActivityProgress
Excavation35%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAHEJA LUNARIS 2D3%
ActivityProgress
Excavation30%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RAHEJA LUNARIS SHOP/RESTAURANT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed2417

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,417
Closed/Covered2,417
BuildingClosed/CoveredTotal
RAHEJA LUNARIS 2A585585
RAHEJA LUNARIS 2B585585
RAHEJA LUNARIS 2C585585
RAHEJA LUNARIS 2D588588
RAHEJA LUNARIS SHOP/RESTAURANT7474

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area32,020 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofStandard Chartered Bank
Secured amountRs 90.00 crore
CERSAI search filedYes
Declared on2 Dec 2025

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI51313.84
Proposed, not sanctioned51,314 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRESCENZO BUILDING
Estimated costRs 1,396.14 cr
Cost incurredRs 9.21 cr
Work done0.66%
BuildingWingEstimatedIncurred
RAHEJA LUNARIS 2ANARs 325.27 crRs 2.08 cr
RAHEJA LUNARIS 2BNARs 325.27 crRs 2.08 cr
RAHEJA LUNARIS 2CNARs 325.27 crRs 2.08 cr
RAHEJA LUNARIS 2DNARs 325.27 crRs 2.08 cr
-NARs 95.06 crRs 89.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKamal Khemani
EngineerMahesh Lalla
Chartered AccountantVinit & Associates
PartnerRole in project
Raheja Universal (Pvt.) Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Lunaris 2A 2B 2C 2D dt 30 06 2026.pdf15 Jul 2026
Withdrawal Update Form 2File: Lunaris II Elara 30 06 2026.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3 Lunaris 2 30 06 2026.pdf15 Jul 2026
Form 2A (FY 2025-2026)File: Lunaris - 2.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 - Lunaris 2.pdf15 May 2026
Withdrawal Update Form 2File: Lunaris - 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 _Lunaris 2_31 03 2026.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 - Lunaris 2.pdf12 May 2026
Withdrawal Update Form 2File: Lunaris - 2.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 _Lunaris 2_31 03 2026.pdf12 May 2026
Declaration and undertaking (Annexure A)File: Declaration cum Undertaking- Order No-50_.pdf8 Dec 2025
Layout approvalFile: Approved Plan Page 1- Raheja Lunaris.pdf3 Dec 2025
Building plan approvalFile: Approved Plan Page 1.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 2.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 3.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 4.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 5.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 6.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 7.pdf21 Nov 2025
Building plan approvalFile: Approved Plan Page 8.pdf21 Nov 2025

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Tesla Building No 1 - Formerly known as EDISONJuinagar - Navi Mumbai259CompletedApr 2018Apr 2018
Raheja Exotica - Sorento 5BMadh Island - Malad West165CompletedOct 2017Apr 2017
Raheja Exotica - Sorento 5AMadh Island - Malad West211CompletedOct 2017Apr 2017
Raheja RidgewoodGoregaon East - Mumbai278CompletedMar 2017Late, Apr 2017
Raheja Reflections - OdysseyKandivali East Mumbai62CompletedJan 2017Late, Apr 2017
Raheja Reflections - EternityKandivali East Mumbai229CompletedMar 2016Mar 2016
Raheja Waterfront - PacificKulai - Mangalore292CompletedDec 2014Late, Apr 2017
Raheja Waterfront - AtlanticKulai Manglore228CompletedDec 2014Late, Mar 2016
Raheja Reflections - SerenityKandivali East256CompletedMay 2014Late, Oct 2014
Raheja XionByculla - Mumbai12CompletedApr 2013Apr 2013
Raheja Exotica - Amalfi Sicily and Capri - Phase - IIIMadh Island - Malad West311CompletedApr 2013Late, Jun 2014
Raheja Reflection PlazaKandivali East1CompletedFeb 2012Feb 2012

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raheja Lunaris-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIDC Industrial Area7,600+ in Thane

2 kmRaheja Lunaris-2Completed 2Lapsed / revoked 1Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Raheja Universal (Pvt.) Ltd.

Raheja Universal (Pvt.) Ltd. has 17 registrations on MahaRERA, including Raheja Imperia - I and Raheja Exotica Verona. Its filings disclose 13 earlier MahaRERA projects: declares 6 of 12 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Raheja Lunaris-2 is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raheja Lunaris-2?

The registered promoter entity is Raheja Universal (Pvt.) Ltd., a company as per the filing. Its CIN U45200MH1980PTC023430 and GSTIN 27AABCG7955Q1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raheja Lunaris-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raheja Lunaris-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raheja Lunaris-2?

The professionals named in the filing: Architect: Kamal Khemani; Engineer: Mahesh Lalla; Chartered Accountant: Vinit & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raheja Lunaris-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raheja Lunaris-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raheja Lunaris-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.