Home / Browse projects / Thane, Maharashtra / ASHAR PULSE

Registered No litigation declared Others project

ASHAR PULSE

By Ms ASHAR VENTURES

RG-MH-92630 · RERA P51700047432 · Last updated on MahaRERA portal: 16 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 65%
334 of 1,047Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ASHAR PULSE is a Others project by Ms ASHAR VENTURES in Thane, Maharashtra, registered with MahaRERA as P51700047432 on 31 Oct 2022. Possession is promised by 30 Dec 2028. 713 of the 1,047 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameASHAR PULSE
  • TypeOthers
  • Location
    • MAJIWADA
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047432
  • ReraGenie IDRG-MH-92630

Builder

  • NameMs ASHAR VENTURES
  • Entity typeOthers
  • Named personsAJAY ASHAR, MAX MOTORS PRIVATE LIMITED, TOSCANO INFRASTRUCTURE PRIVATE LIMITED
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2022
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Current status

68%713 of 1,047 units booked

Figures as on 16 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1- A WINGNA4646957521009
TOWER 2- WING BNA464603838

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 65%.

TOWER 1- A WING6%
ActivityProgress
Excavation65%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 2- WING B6%
ActivityProgress
Excavation65%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities45

As on 16 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
REFLEXOLOGY PATHYes0%
SENIOR CITIZEN ZONEYes0%
BARBEQUE PARTY AREAYes0%
CANBANA SIT OUTSYes0%
DEDICATED ELEVATOR TO TRAVEL BETWEEN AMENITY FLOORYes0%
FULLY EQUIPPED GYMYes0%
BADMINTON COURT 1 NOYes0%
BANQUET HALL 200 PLUS SITTING CAPACITYYes0%
BOX CRICKET 2NOSYes0%
BOXING ZONEYes0%
CROSSFIT ZONEYes0%
DEDICATED PANTRY FOR CATERERSYes0%
GREEN ROOM AND RESTROOMSYes0%
SPILL OVER DINING AREAYes0%
INDOOR GAMES AREA CAROM CHESS CARDS FOOSBALL POOL TABLEYes0%
INFINITY SWIMMING POOLYes0%
JOGGING TRACKYes0%
KIDS PLAY AREAYes0%
KIDS POOLYes0%
MULTI PURPOSE COURT 1 NOYes0%
OPEN AIR GYMYes0%
OPEN AIR MEDITATION DECKYes0%
ROOF GARDENYes0%
SUN DECK WITH LOUNGERSYes0%
TABLE TENNISYes0%
TODDLERS PLAY AREAYes0%
VIEWING DECKYes0%
WORKPODSYes0%
YOGA STUDIOYes0%
ZUMBA STUDIOYes0%

Parking filed647

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots647
Closed/Covered647
BuildingClosed/CoveredTotal
TOWER 1- A WING308308
TOWER 2- WING B339339

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,518 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
ASHAR VENTURESThane (M Corp.)Thane
SAMBHAV CHS LTD AND TATHAGAT CHS LTDThane (M Corp.)Thane

Approvals and building plan

Permissible FSI56662.79
Proposed, not sanctioned56,663 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAIN ROAD PLOT NO 39 ROAD NO 23 WAGLE INDUSTRIAL ESTATE THANE MAHARASHTRA 400604

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNilesh D. Sawant
ArchitectM/s. SAAKAAR
EngineerMANMATHAN BARAL
EngineerMR MANOJ MORE
Chartered AccountantNITIN GALA AND CO
PartnerRole in project
Ms ASHAR VENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Ashar Pulse APR-JUNE 2025.pdf16 Sep 2025
Form 2File: Form-2 Ashar Pulse APR-JUN.pdf16 Sep 2025
Form 3File: Form 3 _Ashar Pulse as on APR-JUNE.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory-Apr-June25.pdf16 Sep 2025
Form 1File: Form-1 Ashar Pulse - Jan2025 _compressed.pdf30 Jul 2025
Form 2File: Form-2 Ashar Pulse - JAN-MAR 2025_compressed.pdf30 Jul 2025
Form 3File: From 3 Ashar Pulse as on JAN-MAR 2025_compressed.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory-Jan-Mar 25.pdf30 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ashar Pulse- FY -23-24 Form 5.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LATEST FORM 3 (MArch).pdf19 Dec 2024
Other - LegalFile: Annexure A.pdf24 May 2024
Building plan approvalFile: AMENDED PLANS.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLANS.pdf9 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 24-01-2024.pdf9 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION OF CC REVISED.pdf9 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ashar Pulse Seperate bank ac disclosure.pdf4 Jul 2023
Building plan approvalFile: 1st to 8th Plan.pdf14 Mar 2023
Building plan approvalFile: 9th to 16th Plan.pdf14 Mar 2023
Building plan approvalFile: 17th 25th Plan.pdf14 Mar 2023
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrance of mortgage.pdf14 Mar 2023
Details of encumbrances concerned to LegalFile: Declaration of Encumbrance of mortgage.pdf14 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st to 8th Plan.pdf14 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 9th to 16th Plan.pdf14 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 17th 25th Plan.pdf14 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended Letter Sale Bldg 27-12-2022 54th Floor.pdf14 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PULSE-FORM 3.pdf14 Mar 2023
Other - TechnicalFile: DISCLOSURE BY PROMOTER 13-3-2023.pdf14 Mar 2023
Copy of the legal title reportFile: Title Certificate.pdf7 Feb 2023
Building plan approvalFile: scan 003_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 004_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 005_9_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 006_10_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 007_11_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 008_12_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 009_13_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 010_14_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 011_15_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 011_15_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 012_16_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 013_17_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 014_18_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 015_19_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 016_20_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 013_17_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 014_18_11zon.pdf28 Oct 2022
Building plan approvalFile: scan 019_23_11zon.pdf28 Oct 2022
PAN CardFile: Ashar Ventures PAN.pdf28 Oct 2022
Copy of the legal title reportFile: FORMAT A TITLE.pdf28 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration for Encumbrance of Mortgage.pdf28 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration for Encumbrance of Mortgage.pdf28 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration for Encumbrance of Legal.pdf28 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration for Encumbrance of Mortgage.pdf28 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration for Encumbrance of Mortgage.pdf28 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration for Encumbrance of Legal.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 003_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 004_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 005_9_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 006_10_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 007_11_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 008_12_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 009_13_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 010_14_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 011_15_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 011_15_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 012_16_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 013_17_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 014_18_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 015_19_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 016_20_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 013_17_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 014_18_11zon.pdf28 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: scan 019_23_11zon.pdf28 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf28 Oct 2022
Proforma of Agreement for saleFile: ASHAR PULSE- AFS.pdf28 Oct 2022
Proforma of Allotment letterFile: RERA - Draft Allotment Letter.pdf28 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Diclaration for Separate Bank Account.pdf28 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter.pdf28 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf28 Oct 2022
Layout approvalFile: Layout Plan.pdf22 Oct 2022
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf22 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHAR SAPPHIRE AND GALLERIAGUT NO 32-2G AND 32-1-6 SUB PLOT B VILLAGE CHITALSAR MANPADA THANE206CompletedDec 2021Dec 2021

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHAR PULSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAJIWADA7,600+ in Thane

2 kmASHAR PULSECompleted 164Lapsed / revoked 68Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 390 registered projects within 2 km.

Builder: Ms ASHAR VENTURES

Ms ASHAR VENTURES has 11 registrations on MahaRERA, including ASHAR MILLENNIA and ASHAR SAPPHIRE AND GALLERIA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ASHAR PULSE is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHAR PULSE?

The registered promoter entity is Ms ASHAR VENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHAR PULSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHAR PULSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHAR PULSE?

The professionals named in the filing: Architect: Nilesh D. Sawant; Architect: M/s. SAAKAAR; Engineer: MANMATHAN BARAL; Engineer: MR MANOJ MORE; Chartered Accountant: NITIN GALA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHAR PULSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHAR PULSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHAR PULSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.