ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Prestige Garden Trails

Registered Litigation declared Residential / Group Housing project

Prestige Garden Trails

By PRESTIGE ESTATES PROJECTS LIMITED

RG-MH-00184 · RERA PR1330002501223 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2030Possession promisedno revision filed
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
561 of 1,364Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Prestige Garden Trails is a Residential / Group Housing project by PRESTIGE ESTATES PROJECTS LIMITED in Thane, Maharashtra, registered with MahaRERA as PR1330002501223 on 13 Oct 2025. Possession is promised by 31 Oct 2030. 803 of the 1,364 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete.

At a glance

Project

  • NamePrestige Garden Trails
  • TypeResidential / Group Housing
  • Location
    • Mahajanwadi
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1330002501223
  • ReraGenie IDRG-MH-00184

Builder

  • NamePRESTIGE ESTATES PROJECTS LIMITED
  • Entity typeCompany
  • CINL07010KA1997PLC022322
  • GSTIN27AABCP8096K1ZT
  • Whole Time DirectorREZWAN SATTAR RAZACK
  • Managing DirectorIRFAN SATTAR RAZACK
  • Whole-Time DirectorNoaman Razack
  • DirectorUzma Irfan
  • Independent DirectorsSRINIVASARAO NAGABHUSHANA RAO NAGENDRA, Neelam Chhiber, Ravindra Munsihwar Mehta, THUMPUDI SRIKANTH BHAGAVAT
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2025PromisedOct 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Oct 2025
  • Promised completion31 Oct 2030
  • Revised completionNone
  • Buildings5 building records
  • Documents filed77 files

Current status

59%803 of 1,364 units booked
3.3%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Phase 3 Tower A AsterNA403727127298
Phase 3 Tower B Bluebell NA40352690269
Phase 3 Tower C CarnationNA40342610261
Phase 3 Tower D DaisyNA40342610261
Phase 3 Tower E EmiliaNA403526312275

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Phase 3 Tower A Aster0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 3 Tower B Bluebell0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 3 Tower C Carnation0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 3 Tower D Daisy0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Phase 3 Tower E Emilia0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed2555

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,555
Closed/Covered2,505
Separate Building50
BuildingClosed/CoveredSeparate BuildingTotal
Phase 3 Tower A Aster41933452
Phase 3 Tower B Bluebell3480348
Phase 3 Tower C Carnation7090709
Phase 3 Tower D Daisy5630563
Phase 3 Tower E Emilia46617483

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area71,651 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Oct 2025

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI124610.49
Proposed, not sanctioned124,610 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch10/7 , UMIYA LANDMARK LAVELLE ROAD NEXT TO CHANCERY HOTEL BANGALORE KARNATAKA - 560 001
Estimated costRs 1,015.40 cr
Cost incurredRs 33.37 cr
Work done3.29%
BuildingWingEstimatedIncurred
-NARs 211.40 crRs 6.23 cr
Phase 3 Tower E EmiliaNARs 196.47 crRs 6.82 cr
Phase 3 Tower C CarnationNARs 176.29 crRs 5.77 cr
Phase 3 Tower D DaisyNARs 176.18 crRs 5.77 cr
Phase 3 Tower A AsterNARs 127.64 crRs 4.57 cr
Phase 3 Tower B BluebellNARs 127.43 crRs 4.20 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBK Engineers Consultant
EngineerShree Venkatadri Associates
Chartered AccountantBhuvana Bhat & Associates
Chartered AccountantN B Sayed and Associates
PartnerRole in project
PRESTIGE ESTATES PROJECTS LIMITED-

Litigation declared2

CaseCourtStatus
664/2022Civil CourtOngoing
161/2024Civil CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2030

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4_Form 1_PGT.pdf20 Apr 2026
Withdrawal Update Form 2File: Q4_Form 2_PGT.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3_PGT-Mar-25.pdf20 Apr 2026
Layout approvalFile: Page 22 - Layout Plan (All Towers).pdf11 Apr 2026
Building plan approvalFile: Page 21 - Floors Plans (Tower A).pdf11 Apr 2026
Building plan approvalFile: Page 20 - Floor Plans (Tower A).pdf11 Apr 2026
Building plan approvalFile: Page 19 - Floor Plans (Tower B).pdf11 Apr 2026
Building plan approvalFile: Page 18 - Floor Plans (Tower C and D).pdf11 Apr 2026
Building plan approvalFile: Page 17 - Floor Plans (Tower C and D).pdf11 Apr 2026
Building plan approvalFile: Page 16 - Floor Plans (Tower E).pdf11 Apr 2026
Building plan approvalFile: Page 15 - Floors Plans (Tower E).pdf11 Apr 2026
Building plan approvalFile: Page 14 - Ground Floor and Mezz Floor (All Towers).pdf11 Apr 2026
Building plan approvalFile: Page 13 - Floors Plans (Tower C).pdf11 Apr 2026
Building plan approvalFile: Page 12 - FLoor Plan (Tower D).pdf11 Apr 2026
Building plan approvalFile: Page 11 - Lower Ground and Basement Floor (All Towers).pdf11 Apr 2026
Building plan approvalFile: Page 10 - Upper Ground and 1st Podium Plan (All Towers).pdf11 Apr 2026
Building plan approvalFile: Page 9 - 2nd and 3rd Podium Plan (All Towers).pdf11 Apr 2026
Building plan approvalFile: Page 8 - Elevation (Tower D).pdf11 Apr 2026
Building plan approvalFile: Page 7 - Elevation (Tower A).pdf11 Apr 2026
Building plan approvalFile: Page 6 - Elevation (Tower B).pdf11 Apr 2026
Building plan approvalFile: Page 5 - Elevation (Tower B).pdf11 Apr 2026
Building plan approvalFile: Page 4 - Elevation (Tower C and D).pdf11 Apr 2026
Building plan approvalFile: Page 3 - Elevation (Tower E).pdf11 Apr 2026
Building plan approvalFile: Page 2 - Elevation (Tower C).pdf11 Apr 2026
Building plan approvalFile: Page 1 - ELevation (Tower A and Tower E).pdf11 Apr 2026
Layout approvalFile: Page 23 - (Highlighted)(Parking Statement)(Permissible and Sanctioned BUA).pdf11 Apr 2026
Building plan approvalFile: Approved Plans-1.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-2.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-3.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-4.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-5.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-6.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-7.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-8.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-9.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-10.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-11.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-12.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-13.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-14.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-15.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-16.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-17.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-18.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-19.pdf20 Feb 2026
Building plan approvalFile: Approved Plans-20.pdf20 Feb 2026
Layout approvalFile: Approved Plans-21.pdf20 Feb 2026
Layout approvalFile: Approved Plans-22.pdf20 Feb 2026
Layout approvalFile: Approved Plans-23.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025 (2).pdf19 Feb 2026
Withdrawal Update Form 3File: Final Form 3 Prestige garden Trails__signed_11zon.pdf19 Feb 2026
Layout approvalFile: Plans - Highlighted.pdf9 Jan 2026
Layout approvalFile: Layout Prestige Garden Trails.pdf13 Oct 2025
Building plan approvalFile: Approved Plans-Page 2.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 3.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 4.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 5.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 6.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 7.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 8.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 9.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 10.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 11.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 12.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 13.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 14.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 15.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 16.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 17.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 18.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 19.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 20.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 21.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 22.pdf10 Oct 2025
Building plan approvalFile: Approved Plans-Page 23.pdf10 Oct 2025
Declaration and undertaking (Annexure A)File: Order No 50 Prestige Garden trails.pdf10 Oct 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRESTIGE BAGMANE TEMPLE BELLSSy No 54 55 56 1 56 2 56 3 56 4 57 2 Hosekerahalli Village Uttarahalli Hobli Bangalore South968CompletedSep 2019Jun 2019
PRESTIGE DEJAVUKhata No 51 1 Promenade Road Coles Road Frazer Town Bangalore40CompletedAug 2019Aug 2019

How this compares with Thane

59%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prestige Garden Trails on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira-Bhayandar (M Corp.)7,600+ in Thane

2 kmPrestige Garden TrailsCompleted 22Lapsed / revoked 16Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 78 registered projects within 2 km.

Builder: PRESTIGE ESTATES PROJECTS LIMITED

PRESTIGE ESTATES PROJECTS LIMITED has 3 registrations on MahaRERA, including PRESTIGE JASDAN CLASSIC and PRESTIGE DAFFODILS CHSL. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Prestige Garden Trails is delayed beyond 31 Oct 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prestige Garden Trails?

The registered promoter entity is PRESTIGE ESTATES PROJECTS LIMITED, a company as per the filing. Its CIN L07010KA1997PLC022322 and GSTIN 27AABCP8096K1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prestige Garden Trails?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prestige Garden Trails?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prestige Garden Trails?

The professionals named in the filing: Architect: BK Engineers Consultant; Engineer: Shree Venkatadri Associates; Chartered Accountant: Bhuvana Bhat & Associates; Chartered Accountant: N B Sayed and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prestige Garden Trails?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prestige Garden Trails. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prestige Garden Trails to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.