Registered No litigation declared Others project

North Westend Tower 1

By JP Infra Realty Private Limited

RG-MH-06786 · RERA P51700053522 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 150.00 crore secured on the land, in favour of RBL BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months from the original
16 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 35%
608 of 865Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

North Westend Tower 1 is a Others project by JP Infra Realty Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700053522 on 8 Nov 2023. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months from the original filing. 257 of the 865 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete.

At a glance

Project

  • NameNorth Westend Tower 1
  • TypeOthers
  • Location
    • Bhayander West
    • Bhayander
    • BHAYANDAR
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053522
  • ReraGenie IDRG-MH-06786

Builder

  • NameJP Infra Realty Private Limited
  • Entity typeCompany
  • CINU45200MH2010PTC206022
  • GSTIN27AAOCS9607A1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSHUBHAM VIJAYKUMAR JAIN, ABHISHEK CHHAGANLAL KHETAN
  • Other registrations16 more →
  • Completed8 of 17
  • Declared earlier projects15 →

Key dates

this monthRegisteredNov 2023First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Nov 2023
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings4 building records
  • Documents filed153 files

Current status

30%257 of 865 units booked
20.9%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1ANA38372370237
Wing 1BNA38372270227
Wing 1CNA38372010201
CommercialNA660200200

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 35%.

Wing 1A40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)35%
Plinth100%
Stilt Floor100%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing 1B40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)35%
Plinth100%
Stilt Floor100%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing 1C40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)35%
Plinth100%
Stilt Floor100%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)35%
Plinth100%
Stilt Floor100%
Slabs of Super Structure9%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed574

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots574
Closed/Covered574
BuildingClosed/CoveredTotal
Wing 1A164164
Wing 1B135135
Wing 1C119119
Commercial156156

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,240 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofRBL BANK LIMITED
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on8 Apr 2026
LandownerVillageDistrict
Span VentureBHAYANDARThane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI60706.62
Proposed, not sanctioned60,707 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRBL BANK LTD,DHANNUR HOUSE,15,SIR P M ROAD, FORT,MUMBAI-400001
Estimated costRs 361.00 cr
Cost incurredRs 75.41 cr
Work done20.89%
BuildingWingEstimatedIncurred
Wing 1ANARs 88.26 crRs 18.85 cr
Wing 1BNARs 88.26 crRs 18.85 cr
Wing 1CNARs 88.26 crRs 18.85 cr
CommercialNARs 88.26 crRs 18.85 cr
-NARs 7.96 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectURBDES
EngineerAVP STRUCTURAL CONSULTANTS
EngineerVIJAY JOSHI
Chartered AccountantCAS & CO
Chartered AccountantSGCO & CO LLP
Chartered AccountantSGCO & Co. LLP
PartnerRole in project
JP Infra Realty Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700053522/WarDec 2029 → Apr 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_JUNE 2026_ North Westend Tower 1.pdf14 Aug 2026
Withdrawal Update Form 2File: Form 2_JUNE 2026_ North Westend Tower 1.pdf14 Aug 2026
Withdrawal Update Form 3File: Form 3_JUNE 2026_ North Westend Tower 1.pdf14 Aug 2026
Building plan approvalFile: LAYOUT APPROVAL 1.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-2.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-3.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-4.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-5.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-6.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-7.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-8.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-9.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-10.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-11.pdf10 Jun 2026
Building plan approvalFile: BUILDING PLANS-12.pdf10 Jun 2026
Building plan approvalFile: 1 LAYOUT PLANS 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 2 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 3 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 4 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 5 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 6 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 7 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 8 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 9 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Building plan approvalFile: 10 BUILDING PLAN 10-12-2024.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 NWT 1 31032026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 NWE T1 31032026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 North Westend Tower 1 31032026.pdf15 May 2026
Form 2A (FY 2025-2026)File: Form 2A NWT 1.pdf15 May 2026
Withdrawal Update Form 1File: Form 1- NWT 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2_Signed Copy_ NWE T1_ As on 31-12-25.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3 North Westend Tower1 31122025.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1- North Westend T1 30092025.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2_Signed Copy_North West End T1_ As on 30-09-25.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 - North Westend Tower 1 - 30092025.pdf25 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A_Signed Copy_NWE T1_FY 24-25.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: RERA Form 5 - North West End Tower 1 March 25.pdf29 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf6 Sep 2025
Withdrawal Update Form 3File: FORM 3.pdf6 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf1 Aug 2025
Withdrawal Update Form 2File: Form 2-North Westend Tower 1-March 2024.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 3 North Westend Tower 1 march 2025.pdf1 Aug 2025
Form 1File: Form 1.pdf17 Jul 2025
Form 2File: Form 2.pdf17 Jul 2025
Form 3File: Form 3 North Westend Tower 1 march 2025.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold-North west 1.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 North Westend Tower 1 march 2025.pdf30 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf6 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_North Westend Tower 1 as on 31-12-24.pdf31 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 North Westend Tower 1 30092024.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-North Westend-Tower 1-Dec 2024.pdf15 Feb 2025
Layout approvalFile: 1.pdf21 Dec 2024
Building plan approvalFile: 2.pdf21 Dec 2024
Building plan approvalFile: 3.pdf21 Dec 2024
Building plan approvalFile: 4.pdf21 Dec 2024
Building plan approvalFile: 5.pdf21 Dec 2024
Building plan approvalFile: 6.pdf21 Dec 2024
Building plan approvalFile: 7.pdf21 Dec 2024
Building plan approvalFile: 8.pdf21 Dec 2024
Building plan approvalFile: 9.pdf21 Dec 2024
Copy of Layout Approval (in case of layout)File: 1.pdf21 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: IOD-CC Letter.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - North West End March 24.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Northwestend Tower 1 - Sept 24.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - North Westend - Tower 1 - June 2024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - North Westend - June 2024.pdf23 Oct 2024
Building plan approvalFile: Building plan part 1.pdf19 Oct 2024
Building plan approvalFile: Building plan part 2.pdf19 Oct 2024
Building plan approvalFile: Building plan part 3.pdf19 Oct 2024
Building plan approvalFile: Building plan part 4.pdf19 Oct 2024

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise5 not delivered by the promised date7 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JP CONNECT-MIRAROADPC1330002502082VINAY NAGAR, Thane624Jan 2026OngoingDec 2032Not due yet
The Palace Tower AP51700078483VINAY NAGAR, Thane567Dec 2024OngoingDec 2031Not due yet
North Westend Tower 2P51700079721BHAYANDER, Thane308Mar 2025OngoingDec 2031Not due yet
Codename StarLifeP51700054275Bhayander East, Thane1,539Jan 2024OngoingDec 2031Not due yet
The Palace Tower CP51700033431Vinay Nagar, Thane637Feb 2022OngoingDec 2028Not due yet
The Palace Tower BP51700033430Vinay Nagar, Thane942Feb 2022OngoingDec 2028Not due yet
JP North AvivaP51700023940Vinay Nagar, Thane-Jan 2020Certificate SignedDec 2026Not due yet
JP North Imperia - Tower 2P51700019783Near Vinay Nagar, Thane-Mar 2019CompletedDec 2025Dec 2025
JP North Imperia - Tower 1P51700019613Near Vinay Nagar, Thane-Feb 2019CompletedDec 2025Dec 2025
JP North EuphoriaP51700016290Vinaynagar, Thane-May 2018Certificate SignedDec 2025Not delivered
JP North AlexaP51700016736near Vinay Nagar, Thane-Jun 2018Certificate SignedDec 2025Not delivered
JP North ElaraP51700007001Vinaynagar, Thane-Aug 2017Certificate SignedJun 2022Not delivered
JP North EstellaP51700008916Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered
JP North AtriaP51700004117Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered

How this compares with Thane

30%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep North Westend Tower 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhayander7,600+ in Thane

2 kmNorth Westend Tower 1Completed 42Lapsed / revoked 26Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 137 registered projects within 2 km.

Builder: JP Infra Realty Private Limited

JP Infra Realty Private Limited has 17 registrations on MahaRERA, including JP North Estella and JP North Atria. Its filings disclose 15 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if North Westend Tower 1 is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of North Westend Tower 1?

The registered promoter entity is JP Infra Realty Private Limited, a company as per the filing. Its CIN U45200MH2010PTC206022 and GSTIN 27AAOCS9607A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in North Westend Tower 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for North Westend Tower 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at North Westend Tower 1?

The professionals named in the filing: Architect: URBDES; Engineer: AVP STRUCTURAL CONSULTANTS; Engineer: VIJAY JOSHI; Chartered Accountant: CAS & CO; Chartered Accountant: SGCO & CO LLP; Chartered Accountant: SGCO & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in North Westend Tower 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About North Westend Tower 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save North Westend Tower 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.