Home / Browse projects / Thane, Maharashtra / Charms Padamavati Royal Phase 2

Registered No litigation declared Residential / Group Housing project

Charms Padamavati Royal Phase 2

By Charms Developers

RG-MH-79968 · RERA P51700045389 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
16 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 60%
650 of 746Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Charms Padamavati Royal Phase 2 is a Residential / Group Housing project by Charms Developers in Thane, Maharashtra, registered with MahaRERA as P51700045389 on 18 May 2022. Possession is promised by 30 Apr 2027. 96 of the 746 units on this registration are recorded sold or booked, and 16 of 77 construction stages are filed complete.

At a glance

Project

  • NameCharms Padamavati Royal Phase 2
  • TypeResidential / Group Housing
  • Location
    • Titwala Murbad Road
    • S No 89 1A
    • 95 1A 95 2 and 95 10
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045389
  • ReraGenie IDRG-MH-79968

Builder

  • NameCharms Developers
  • Entity typePartnership
  • PartnersJohn Mathew, Dhiraj Govind Patel, Sanjay Dhondu Borgaonkar, Bharat Pralhad Shah, Bharat Govind Vasani, Rajendra Devram Patel, Pradeep Purushottam Velani, Vishram Murji Gori, Deepak Shivji Patel, Gangaram Rajaram Sheganti, Bhavesh Popatlal Velani, Vishram Lalji Patel and 1 more
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 May 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed51 files

Current status

13%96 of 746 units booked
19.8%Work done, per cost certificate

Figures as on 22 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg - 1NA121213212144
Bldg - 2NA121213212144
Bldg - 3NA8892092
Bldg - 7NA121213212144
Bldg - 8NA8892092
Bldg - 9NA8892092
Amenity BuildingNA3303838

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 60%.

Bldg - 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg - 253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg - 39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg - 753%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg - 89%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg - 938%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Amenity Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed115

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots115
Closed/Covered66
Open Space49
BuildingClosed/CoveredOpen SpaceTotal
Bldg - 114822
Bldg - 214822
Bldg - 3808
Bldg - 714822
Bldg - 8808
Bldg - 9808
Amenity Building02525

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,443 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI37118.0
Proposed, not sanctioned28,157 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURAJ HOUSE, SHOP NO 1 AND 2, GR FLOOR, PATLIPADA, GHODBUNDER ROAD THANE MAHARASHTRA 400607
Estimated costRs 90.15 cr
Cost incurredRs 17.84 cr
Work done19.79%
BuildingWingEstimatedIncurred
-NARs 22.90 cr-
Bldg - 1NARs 12.29 cr-
Bldg - 2NARs 12.29 crRs 6.69 cr
Bldg - 7NARs 12.29 crRs 6.69 cr
Bldg - 3NARs 7.82 crRs 86.91 lakh
Bldg - 8NARs 7.82 crRs 86.91 lakh
Bldg - 9NARs 7.82 crRs 2.72 cr
Amenity BuildingNARs 6.90 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSajid Abdul Majid Momin
ArchitectMomin Sajid
EngineerVilas Bhoir
EngineerNITHYA THOMAS
Chartered AccountantMedha Jitendra Velani
Chartered AccountantHARISH OMPRAKASH GUPTA
Chartered AccountantHarish Gupta
PartnerRole in project
Charms Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: CPRoyal Phase2 Form1 18July2025.pdf22 Jan 2026
Withdrawal Update Form 2File: Charms Developers form 2 CPR Ph 2.pdf22 Jan 2026
Withdrawal Update Form 3File: CPRoyal Phase2 Form3 25Nov2025_compressed.pdf22 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1_Phase-2_(Sep-24)_Charms Developers_Titwala.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1_Phase-2_(Dec-24)_Charms Developers_Titwala.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1_Phase-2_(Mar-25)_Charms Developers_Titwala.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 24_compressed.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 CP Royal Ph II December 24.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September 24_compressed.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 CP Royal Ph II September 2024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPR June 24.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 CP Royal Ph II June 2024.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1-Phase-1(Mar-24)_Charms Developers_Titwala.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1-Phase-1(Jun-24)_Charms Developers_Titwala.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1-Phase-2(Mar-24)_Charms Developers_Titwala.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1-Phase-2(Jun-24)_Charms Developers_Titwala.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24_compressed.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Form 2 CP Royal Ph II March 2024.pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CPR Phase 2.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pi7_00Form_3_CPR.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1-Phase-2(Sep-23)_Charms Developers_Titwala.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sign.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for Quality Assurance CPR Sign.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3__Sign.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202212 RERA Certificate Charms Padamavati Royal Phase 2 - RERA 01.pdf21 Jul 2023
Proforma of Allotment letterFile: Draft Agreement For Charms Padamavati Royal.pdf11 May 2022
Copy of the legal title reportFile: TITLE REPORT.pdf10 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 May 2022
Declaration in FORM BFile: Scan 2.pdf10 May 2022
Declaration about Commencement CertificateFile: CP Royal Phase II Declaration for CC.pdf7 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Charms Padamavati Royal Phase 2 CA Certificate upload final.pdf12 Apr 2022
Layout approvalFile: 03 Sheet No1_Charms_Titw_compressed.pdf11 Apr 2022
Layout approvalFile: 03 Sheet No2_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No3_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No4_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No5_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No6_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No7_Charms_Titwala_compressed.pdf11 Apr 2022
Building plan approvalFile: 04 Sheet No8_Charms_Titwala_compressed.pdf11 Apr 2022
PAN CardFile: 01 PAN.pdf11 Apr 2022
Details of encumbrancesFile: Encumbrances Certi Phase 2.pdf11 Apr 2022
Copy of Layout Approval (in case of layout)File: 03 Sheet No1_Charms_Titw_compressed.pdf11 Apr 2022
Copy of Layout Approval (in case of layout)File: 03 Sheet No2_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No3_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No4_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No5_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No6_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No7_Charms_Titwala_compressed.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 04 Sheet No8_Charms_Titwala_compressed.pdf11 Apr 2022
CERSAI detailsFile: Declaration for Cersai Certificate Phase 2.pdf11 Apr 2022
Proforma of Allotment letterFile: Allot Letter Of Self Sale Compress.pdf11 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
CHARMS HEIGHTS PHASE-II A1-A2P51700002670Titwala, ThaneAug 2017CompletedMar 2021Registered original: Mar 2019May 2018

How this compares with Thane

13%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Charms Padamavati Royal Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near S No 89 1A, 95 1A 95 2 and 95 107,600+ in Thane

2 kmCharms Padamavati Royal Completed 26Lapsed / revoked 17Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Charms Developers

Charms Developers has 8 registrations on MahaRERA, including CHARMS HEIGHTS PHASE-II A1-A2 and CHARMS HEIGHTS PHASE-III B2-B3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Charms Padamavati Royal Phase 2 is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Charms Padamavati Royal Phase 2?

The registered promoter entity is Charms Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Charms Padamavati Royal Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Charms Padamavati Royal Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Charms Padamavati Royal Phase 2?

The professionals named in the filing: Architect: Sajid Abdul Majid Momin; Architect: Momin Sajid; Engineer: Vilas Bhoir; Engineer: NITHYA THOMAS; Chartered Accountant: Medha Jitendra Velani; Chartered Accountant: HARISH OMPRAKASH GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Charms Padamavati Royal Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Charms Padamavati Royal Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Charms Padamavati Royal Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.