Registered Litigation declared Residential / Group Housing project

RGC Runwal My City EWS - LIG Building

By HORIZON PROJECTS PVT LTD

RG-MH-23779 · RERA P51700079091 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 740.15 crore secured on the land, in favour of ICICI BANK LTD

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 45%
388 of 825Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

RGC Runwal My City EWS - LIG Building is a Residential / Group Housing project by HORIZON PROJECTS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700079091 on 3 Feb 2025. Possession is promised by 30 Jun 2029. 437 of the 825 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NameRGC Runwal My City EWS - LIG Building
  • TypeResidential / Group Housing
  • Location
    • Diva Manpada Road
    • Dombivali
    • Usarghar
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700079091
  • ReraGenie IDRG-MH-23779

Builder

  • NameHORIZON PROJECTS PVT LTD
  • Entity typeCompany
  • CINU45400MH2011PTC213029
  • GSTIN27AAFCR1404F1ZS
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSaurabh Natu, Deepak Lohia, Sameer Parasmal Nahar, Saurabh Natu, Sameer Parasmal Nahar, Saurabh Natu
  • Other registrations9 more →
  • Completed4 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2025PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2025
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed90 files

Current status

53%437 of 825 units booked
22.5%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EWS LIG - 1 - Wing ANA24232030203
EWS LIG - 1 - Wing BNA24233120312
EWS LIG - 1 - Wing CNA24233100310

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 45%.

EWS LIG - 1 - Wing A28%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS LIG - 1 - Wing B31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS LIG - 1 - Wing C32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed239

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots239
Closed/Covered3
Open Space236
BuildingClosed/CoveredOpen SpaceTotal
EWS LIG - 1 - Wing A1236237
EWS LIG - 1 - Wing B101
EWS LIG - 1 - Wing C101

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,155 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI BANK LTD
Secured amountRs 740.15 crore
CERSAI search filedYes
Declared on9 Oct 2025

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI51799.81
Proposed, not sanctioned46,800 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 9, 10, Mary Land Corner, Beside Next Show Room, Eastern Express High Way, Near Sion Circle, Sion, Mumabi Maharashtra.400022
Estimated costRs 136.36 cr
Cost incurredRs 30.70 cr
Work done22.51%
BuildingWingEstimatedIncurred
EWS LIG - 1 - Wing BNARs 49.69 crRs 12.29 cr
EWS LIG - 1 - Wing CNARs 43.43 crRs 13.62 cr
EWS LIG - 1 - Wing ANARs 29.35 crRs 3.77 cr
-NARs 13.89 crRs 1.02 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSakaar Architect
ArchitectSAAKAR ARCHITECTS
ArchitectSaakaar Architects
EngineerUTTAM RANGNATH KAWATHANKAR
EngineerUttam kawathankar
EngineerAtul Waman Bapat
Chartered AccountantKshirsagar and Associates
Chartered AccountantM B Agarwal and Co
PartnerRole in project
HORIZON PROJECTS PVT LTD-

Litigation declared2

CaseCourtStatus
3771/2018HIGH COURT MUMBAION GOING
9701/2011HIGH COURT MUMBAION GOING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 EWS FINAL_compressed.pdf20 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE EWS.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - MyCity EWS Building.pdf20 Apr 2026
Withdrawal Update Form 1File: EWS LIG FORM 1 DEC 25 Compressed.pdf20 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE EWS 30122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - MyCity EWS Building.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 EWSLIG 2 30 9 25.pdf19 Oct 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE EWS 30 09 2025.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 - MyCity EWS Building.pdf19 Oct 2025
Withdrawal Update Form 1File: Form 1 EWSLIG 2 30 9 25.pdf18 Oct 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE EWS 30 09 2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - MyCity EWS Building.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A_EWS.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: HPPL Form 5 ews.pdf18 Oct 2025
Form 1File: Form 1 EWS LIG.pdf14 Aug 2025
Form 2File: Form 2 HPPL EWS.pdf14 Aug 2025
Form 3File: Form 3 MyCity EWS Building.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: My City EWS - LIG Building.pdf14 Aug 2025
Self-declaration of Quarterly ProgressFile: Declaration HPPL-signed.pdf14 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 EWS LIG 2 31st March 25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MyCity EWS Building.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE EWS 31st March 25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Land cost Zero EWS my city.pdf20 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance to Finance.pdf20 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf20 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance to Finance.pdf20 Dec 2024
Other - FinanceFile: Declaration of Mortgage of Land.pdf20 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK FORMAT B.pdf20 Dec 2024
CERSAI detailsFile: ASSET BASED REPORT.pdf9 Dec 2024
Proforma of Agreement for saleFile: REVISED AFS AFTER QUERY 28-11-24.pdf9 Dec 2024
Other - LegalFile: DEED OF CONVEYANCEVILLAGE USARGHAR PART II 369 - 2013 195334.pdf23 Nov 2024
Other - LegalFile: 93-109.pdf23 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0002 BUILT UP AND PARKING HIGHLIGHTED AGAIN 2-5.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0005 -5.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0004 -5.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0003-5.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0015 81.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0014 80.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0013 79.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0012 78.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0011 77.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0010 76.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0010 76.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0009 75.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0007 74.pdf14 Nov 2024
Building plan approvalFile: MYSCAN_20241113_0006 73.pdf14 Nov 2024
Layout approvalFile: MYSCAN_20241113_LAYOUT 1 -5.pdf14 Nov 2024
Layout approvalFile: 2 Copy of Layout Approval (in case of layout) 2- 81.pdf14 Nov 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) HIGH LIGHT 1-81.pdf14 Nov 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) HIGH LIGHT 1-81.pdf14 Nov 2024
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout) 2- 81.pdf14 Nov 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20241113_LAYOUT 1 -5.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0003-5.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0006 73.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0007 74.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0009 75.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0010 76.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0010 76.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0011 77.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0012 78.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0013 79.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0014 80.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0015 81.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0004 -5.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0005 -5.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20241113_0002 BUILT UP AND PARKING HIGHLIGHTED AGAIN 2-5.pdf14 Nov 2024
Other - TechnicalFile: Appendix F - Plinth- EWS LIG Block A.pdf13 Nov 2024
Other - TechnicalFile: Appendix F - Plinth- EWS LIG - wing B.pdf13 Nov 2024
Other - TechnicalFile: Appendix F - Plinth- EWS LIG_WING C_.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EWS FORM 3_11zon.pdf11 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: HPPL EWS Secured Certificate.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCRUM.pdf8 Oct 2024
Declaration about Commencement CertificateFile: decl commencement.pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCRUM.pdf8 Oct 2024
Other - TechnicalFile: PARKING LETTER.pdf8 Oct 2024
Other - TechnicalFile: DECLARATION OF THE PROJECT LAND.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: afs deviation.pdf8 Oct 2024
Copy of the legal title reportFile: TITLE REPORT.pdf7 Oct 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCR.pdf7 Oct 2024

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RGC Runwal My City EWS - LIG Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivali7,600+ in Thane

Builder: HORIZON PROJECTS PVT LTD

HORIZON PROJECTS PVT LTD has 10 registrations on MahaRERA, including MY CITY - PHASE I - PART I and MY CITY - PHASE I - PART III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RGC Runwal My City EWS - LIG Building is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RGC Runwal My City EWS - LIG Building?

The registered promoter entity is HORIZON PROJECTS PVT LTD, a company as per the filing. Its CIN U45400MH2011PTC213029 and GSTIN 27AAFCR1404F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RGC Runwal My City EWS - LIG Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RGC Runwal My City EWS - LIG Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RGC Runwal My City EWS - LIG Building?

The professionals named in the filing: Architect: Sakaar Architect; Architect: SAAKAR ARCHITECTS; Architect: Saakaar Architects; Engineer: UTTAM RANGNATH KAWATHANKAR; Engineer: Uttam kawathankar; Engineer: Atul Waman Bapat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RGC Runwal My City EWS - LIG Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RGC Runwal My City EWS - LIG Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RGC Runwal My City EWS - LIG Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.