Home / Browse projects / Thane, Maharashtra / Godrej Riviera Phase 1

Registered No litigation declared Others project

Godrej Riviera Phase 1

By GODREJ PROPERTIES LIMITED

RG-MH-79718 · RERA P51700032552 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
20 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 90%
136 of 1,021Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 152 documents Report an error

Godrej Riviera Phase 1 is a Others project by GODREJ PROPERTIES LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700032552 on 11 Jan 2022. Possession is promised by 16 Dec 2027. The completion date has moved by 12 months from the original filing. 885 of the 1,021 units on this registration are recorded sold or booked, and 20 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGodrej Riviera Phase 1
  • TypeOthers
  • Location
    • 30 ft Mohane Road
    • Kalyan
    • Thane
    • 421102
  • Pincode421102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032552
  • ReraGenie IDRG-MH-79718

Builder

  • NameGODREJ PROPERTIES LIMITED
  • Entity typeCompany
  • CINL74120MH1985PLC035308
  • GSTIN27AAACG3995M1Z1
  • Managing DirectorGaurav Pandey
  • Other registrations27 more →
  • Completed5 of 28
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects35 →

Key dates

this monthRegisteredJan 2022First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jan 2022
  • Promised completion16 Dec 2027
  • Revised completionRevised to 16 Dec 2027 (originally 16 Dec 2026)
  • Buildings4 building records
  • Documents filed152 files

Current status

87%885 of 1,021 units booked
79.6%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA232223815253
TOWER 2NA232223330263
TOWER 3NA232223322255
TOWER 4NA232223812250

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

TOWER 162%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
TOWER 259%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
TOWER 364%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
TOWER 457%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22
BuildingClosed/CoveredTotal
TOWER 155
TOWER 233
TOWER 31212
TOWER 422

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area58,638 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI62315.85
Proposed, not sanctioned62,316 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJEEVAN PRAKASH BUILDING SIR PM ROAD FORT MUMBAI 400001
Estimated costRs 268.48 cr
Cost incurredRs 213.71 cr
Work done79.6%
BuildingWingEstimatedIncurred
TOWER 2NARs 69.69 crRs 49.64 cr
TOWER 1NARs 64.69 crRs 64.69 cr
TOWER 3NARs 63.54 crRs 48.62 cr
TOWER 4NARs 56.92 crRs 46.94 cr
-NARs 13.63 crRs 3.83 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerRajendra V Joshi
EngineerVinyasa Consultant
EngineerSamartha Constro Consultants LLP
Chartered AccountantAKPJ & Associates
Chartered AccountantBSR &Co. LLP
PartnerRole in project
GODREJ PROPERTIES LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31072621976Dec 2026 → Dec 2027

Reason as filed by the promoterThe Project is approximately 70% completed. Tab 1 - Form B uploaded Tab 2- Declaration for Extension uploaded Tab 3- No Correction Declaration uploaded Tab 4 -Comparative Statement uploaded Tab 5 -PERT Chart uploaded the Project is registered POST COVID, the lingering effects of the after effects of the pandemic, including reduced labour availability, supply chain disruptions, and lower site productivity, continued to impact the execution schedule also Due to the prevailing war situation and its consequential impact on the supply chain, there has been a severe shortage of construction material

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502003NIPUN JAINGODREJ PROPERTIES LIMITED19/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 16 Dec 2027

Documents filed152

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Riviera Q1FY27.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 Riviera Q1FY27.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 Riviera Q1FY27 and disclosure of sold unsold.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: FY26_12062026_Godrej Riviera_QC_01_SCCL.pdf12 Jun 2026
Withdrawal Update Form 1File: Riviera Q4FY26 Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Riviera Q4FY26 Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Riviera Q4FY26 Form 3 and disclosure.pdf20 Apr 2026
Withdrawal Update Form 1File: Riviera Q4FY26 Form 1.pdf19 Apr 2026
Withdrawal Update Form 2File: Riviera Q4FY26 Form 2.pdf19 Apr 2026
Withdrawal Update Form 3File: Riviera Q4FY26 Form 3.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1 Riviera Q3 FY26.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Riviera Q3 FY26.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Riviera Q3FY26 Final.pdf19 Jan 2026
Withdrawal Update Form 1File: Riviera - Form 1 - Sep 25 - Signed.pdf18 Oct 2025
Withdrawal Update Form 1File: Riviera - Form 1 - Sep 25 - Signed.pdf18 Oct 2025
Withdrawal Update Form 2File: Riviera - Form 2 - Sep 25 - Signed.pdf18 Oct 2025
Withdrawal Update Form 2File: Riviera - Form 2 - Sep 25 - Signed.pdf18 Oct 2025
Withdrawal Update Form 3File: Ambivali -CA Certificate Sep-25 final-Signed.pdf18 Oct 2025
Withdrawal Update Form 3File: Ambivali -CA Certificate Sep-25 final-Signed.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Riviera - FY25 - compressed.pdf28 Aug 2025
Form 1File: Ambivili Arch Cert Ph 1_ June 25-signed.pdf19 Jul 2025
Form 2File: GODREJ RIVIERA_AMBIVALI_JUNE' 25-Final-signed.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - June 2025-signed.pdf19 Jul 2025
Form 3File: Riviera Ph1 - Form 3 Jun 25 -signed.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A - RERA - Godrej Riviera - FY25.pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate March 25-signed.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3 - Riviera - Q4 FY25-signed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_MAR' 25-Final-signed.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - March 2025-signed.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - Dec 2024-signed.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - Dec 2024-signed.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - Dec 2024-signed.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambivli CA certificate- compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_DEC' 24-Final- Engg Cert-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Ambivili Sep 24-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambivli CA certificate- compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_DEC' 24-Final- Engg Cert-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Ambivili Sep 24-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate Dec 24-signed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Ambivili Sep 24-signed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ambivli CA certificate- compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_DEC' 24-Final- Engg Cert-signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Riviera Ph1 CA Certificate - Sep 24-signed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Riviera Ph1 CA Certificate - Sep 24-signed.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Riviera Ph1 CA Certificate - Sep 24-signed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_SEPT' 24-Final-signed.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Riviera Form 5 FY 2023 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Riviera Form 5 FY 2023 24.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Riviera Form 5 FY 2023 24.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Godrej Riviera Signed Deliverables.pdf30 Sep 2024
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - Mar 2024 printing purpose.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ambivali Rera Certificate June 24-signed.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_JUN' 24-Final-signed.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate _Riviera Jun-24-signed.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality 2A - Godrej Riviera - FY24.pdf2 Jul 2024
Proforma of Agreement for saleFile: Godrej Riviera - Draft AFS - 25 Jun 2024.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality 2A - Godrej Riviera - FY22.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality 2A - Godrej Riviera - FY23.pdf18 Jun 2024
OtherFile: 07 - EXT- Liasoning - Ambivali - Godrej Riviera.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate March 24-signed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert AMBIVALI_MAR' 24-Final-signed.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Godrej Riviera - DISCLOSURE OF SOLD INVENTORY - Mar 2024 printing purpose-signed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - compressed-signed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE-Riviera - Dec 23_compressed.pdf1 Feb 2024
Home Buyer /Allottee Grievance Redressal CellFile: Home Buyer Allottee Grievance Redressal Cell Godrej Riviera Phase 1.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Riviera Sold inventory - Dec 2023.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA certificate Dec 23 Ambivili.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ RIVIERA_AMBIVALI_DEC' 23-Final.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - signed.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - signed_compressed.pdf30 Oct 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
The Trees, OriginsGodrej One Pirojshanagar Off Eastern Express Highway Vikhroli East Mumbai 400079 Maharashtra India263CompletedDec 2022Mar 2020
The Trees, Residential Phase 1Godrej One Pirojshanagar Off Eastern Express Highway Vikhroli East Mumbai 400079 Maharashtra India391CompletedDec 2021Feb 2019
The Trees Residential Phase 2Godrej One Pirojshanagar Off Eastern Express Highway Vikhroli East Mumbai 400079 Maharashtra India256CompletedDec 2021Oct 2019
Godrej OneGodrej One Pirojshanagar Off Eastern Express Highway Vikhroli East Mumbai 400079 Maharashtra India39CompletedDec 2013Late, Aug 2014

How this compares with Thane

87%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Riviera Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan7,600+ in Thane

Builder: GODREJ PROPERTIES LIMITED

Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Godrej Riviera Phase 1 is delayed beyond 16 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Riviera Phase 1?

The registered promoter entity is GODREJ PROPERTIES LIMITED, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 27AAACG3995M1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Riviera Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Riviera Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Riviera Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Riviera Phase 1?

The professionals named in the filing: Architect: R Design Architects; Engineer: Rajendra V Joshi; Engineer: Vinyasa Consultant; Engineer: Samartha Constro Consultants LLP; Chartered Accountant: AKPJ & Associates; Chartered Accountant: BSR &Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Riviera Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Riviera Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Riviera Phase 1 to a free account