Chitrapatjanak Dadasaheb Phalke Township - Phase 1
RG-MH-72187 · RERA P52000047538 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chitrapatjanak Dadasaheb Phalke Township - Phase 1 is a Residential / Group Housing project by Anukarati Homes Pvt Ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000047538 on 7 Nov 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 18 months from the original filing. 797 of the 813 units on this registration are recorded sold or booked, and 30 of 44 construction stages are filed complete.
At a glance
Project
- NameChitrapatjanak Dadasaheb Phalke Township - Phase 1
- TypeResidential / Group Housing
- Location
- Karjat badlapur Raod
- Karjat Badlapur Road
- Shelu
- Karjat
- Raigarh
- 410101
- Pincode410101
- RERA no.P52000047538
- ReraGenie IDRG-MH-72187
Builder
- NameAnukarati Homes Pvt Ltd
- Entity typeCompany
- DirectorsSaurabh Vinayak Manglekar, Deepak Mahadeo Sawant
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Nov 2022
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 20 Dec 2024)
- Buildings4 building records
- Documents filed119 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B1 | NA | 17 | 17 | 128 | 12 | 140 |
| B2 | NA | 17 | 17 | 128 | 12 | 140 |
| A | NA | 17 | 17 | 266 | 0 | 266 |
| C | NA | 17 | 17 | 267 | 0 | 267 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.
B173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B1 | NA | Rs 115.42 cr | Rs 111.88 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Naam Architect |
| Engineer | Ashish M Deosthali |
| Chartered Accountant | Ram Patil and Associates |
| Chartered Accountant | DPMK & ASSOCIATES |
| Chartered Accountant | Dinesh Anand Tulshigar |
| Partner | Role in project |
|---|---|
| Anukarati Homes Pvt Ltd | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have successfully obtained the Revised Layout Plan, dated 25/01/2024, from the Building Permission Cell of the Maharashtra Housing and Area Development Authority (MHADA), which includes the addition of a new structure, Building - C. Due to this significant change in the proposed plan, we find it necessary to seek an extension to ensure comprehensive planning and accurate implementation. We have duly submitted a correction application to the Maharashtra Real Estate Regulatory Authority (MahaRERA) to reflect this alteration, and we are pleased to report that the said application has been appr
Reason as filed by the promoterDear Sir, We have undertaken the construction of 10,080 EWS under the PMAY Scheme, along with 792 EWS houses and 24 commercial shops in Sector 1, bearing MahaRERA Registration No. P52000047538, with the previous project completion date being 31st December 2025. We whereby state and inform for your record that we have already obtained Part Occupation Certificate (OC) for the above-mentioned project for Building No. A & B-1 (Ground + 16 floors) comprising 396 EWS tenements and 12 convenience shops, vide Part OC No. EE/BP/PMAY/A/MHADA/6%/12025 dated 04.03.2025. At present Possession has been give
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 - Shelu.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 2026.pdf | 14 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: RERA FORM 2- Shelu December 2025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: RERA FORM 3 - Shelu December 2025__.pdf | 29 Jan 2026 |
| Form 1File: FORM 1 SHELU ARCHITECT CERTIFICATE 30 SEP 2025.pdf | 10 Dec 2025 |
| Form 2File: FORM 2 SHELU ENGINEER CERTIFICATE 30 SEP 2025.pdf | 10 Dec 2025 |
| Form 3File: FORM 3 SHELU CA CERTIFICATE 30 SEP 2025.pdf | 10 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SHELU SOLD UNSOLD INVENTORY 30 SEP 2025.pdf | 10 Dec 2025 |
| Form 1File: FORM 1.pdf | 31 Jul 2025 |
| Form 2File: Form 2.pdf | 31 Jul 2025 |
| Form 3File: Form 3.pdf | 31 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_ Unsold_ Booked Inventory.pdf | 31 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHELU RERA FORM 3_MAR 25.pdf | 17 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA SHELU ENGG CERTIFICATE QAC MARCH25.PDF | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AHPL SHELU ARCHITECT CERTIFICATE MARCH 25.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AHPL SHELU ENGG CERTIFICATE MARCH 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shelu RERA Architect Certificate Dec 24.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shelu RERA CA Certificate Dec 24.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shelu RERA Engineer Certificate Dec 24.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Shelu RERA Sold Unold Inventory Dec 24.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 Shelu March 24.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24 Shelu.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate -Form 1 -Sept 24 Shelu.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept24 Shelu.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Sept 24 Shelu.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_June24.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 March 23.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 June 23.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - September 2023.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shelu March 2023.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Shelu March 23.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shelu June 2024.pdf | 16 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shelu June 2024.pdf | 16 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shelu June 2024.pdf | 16 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FROM _2A_Shelu.PDF | 29 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Shelu March-2024.PDF | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM _2A_Shelu.PDF | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 18 Apr 2024 |
| Layout approvalFile: Layout Approval.pdf | 3 Apr 2024 |
| Building plan approvalFile: Shelu sector 1 Revised IOA _compressed.pdf | 3 Apr 2024 |
| Building plan approvalFile: Building A C Floor Plan.pdf | 3 Apr 2024 |
| Building plan approvalFile: Building A C Floor Plan 1.pdf | 3 Apr 2024 |
| Building plan approvalFile: Building A C Floor Plan 2.pdf | 3 Apr 2024 |
| Building plan approvalFile: Building B Floor Plan.pdf | 3 Apr 2024 |
| Building plan approvalFile: Building B Floor Plan 1.pdf | 3 Apr 2024 |
| Building plan approvalFile: Parking Plan.PDF | 3 Apr 2024 |
| Building plan approvalFile: Club House Plan.PDF | 3 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Shelu sector 1 Revised IOA _compressed.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building A C Floor Plan.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building A C Floor Plan 1.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building A C Floor Plan 2.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building B Floor Plan.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building B Floor Plan 1.pdf | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Parking Plan.PDF | 3 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Club House Plan.PDF | 3 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf | 3 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Old CC.pdf | 3 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf | 3 Apr 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold as on 31 Dec 2023.pdf | 22 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - DMS.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - December 2023.pdf | 14 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - December 2023.pdf | 14 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023.pdf | 14 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023.pdf | 14 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - December 2023.pdf | 14 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct.pdf | 1 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organization.pdf | 1 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Saurabh Manglekar Disclosure.pdf | 1 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 23.pdf | 2 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP 23.pdf | 2 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Chitrapatjanak Dadasaheb Phalke Township - P on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Karjat Badlapur Road5,900+ in Raigarh
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
VRINDAVAN HEIGHTS
SAHAJANAND INFRATECH
See every Raigarh project, with the district possession charts
Builder: Anukarati Homes Pvt Ltd
Anukarati Homes Pvt Ltd has 1 registration on MahaRERA, including Chitrapatjanak Dadasaheb Phalke Township - Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Chitrapatjanak Dadasaheb Phalke Township - Phase 1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Chitrapatjanak Dadasaheb Phalke Township - Phase 1 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chitrapatjanak Dadasaheb Phalke Township - Phase 1?
The registered promoter entity is Anukarati Homes Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chitrapatjanak Dadasaheb Phalke Township - Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Chitrapatjanak Dadasaheb Phalke Township - Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Chitrapatjanak Dadasaheb Phalke Township - Phase 1?
The professionals named in the filing: Architect: Naam Architect; Engineer: Ashish M Deosthali; Chartered Accountant: Ram Patil and Associates; Chartered Accountant: DPMK & ASSOCIATES; Chartered Accountant: Dinesh Anand Tulshigar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chitrapatjanak Dadasaheb Phalke Township - Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback